Due Aug 22, 2026·22 days left·General ConstructionView official posting ↗
Issuing agency
PennBid
Method
Request for Proposals
Location
Pennsylvania
Posted
Jul 21, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

The selected General Contractor shall furnish all labor, supervision, materials, equipment, permits, coordination, and related services necessary to complete all storefront rehabilitation work in accordance with approved construction documents and applicable codes.

Construction work may include, but is not limited to:
Storefront demolition and removal
Masonry and façade repairs
Exterior framing and carpentry
Doors, windows, and glazing
Metal and ornamental work
Exterior lighting and electrical work
Signage installation
Painting and finishes
Waterproofing and sealing
Accessibility and code compliance improvements
Limited structural stabilization and repairs
Temporary protection, signage, site safety measures, and daily cleanup

WE ARE SEEKING PROFESSIONAL SERVICES FOR THE FOLLOWING TASKS

  1. Construction Services
    The Contractor shall complete construction work in accordance with approved permit drawings, specifications, and all applicable City, State, Federal, HUD, OSHA, and Philadelphia L&I requirements.

The Contractor shall:
Provide all required labor, supervision, tools, materials, and equipment
Maintain a safe, clean, and secure work site at all times
Maintain business operations, pedestrian access, and public right-of-ways throughout construction to the greatest extent practicable. Temporary closures or access restrictions shall be limited to those necessary to safely perform the work. Identify all planned closures and access restrictions as milestones within the project schedule and provide a written safety and execution plan to BBG and affected businesses with a minimum of two (2) weeks advance notice prior to implementation
Maintain construction schedules
Coordinate inspections and required permits
Coordinate with business owners to minimize disruption
Promptly address deficiencies identified during inspections

  1. Cost Proposal
    The responsive Contractor shall submit:
    A detailed cost proposal priced against the $30,000 per-property maximum
    Schedule of values per property
    Unit pricing where applicable
    Hourly rates for additional work
    Proposed project schedule

Construction work will be awarded on a grouped package basis at the discretion of LNPCDC and BBG. LNPCDC reserves the right to increase, decrease, or eliminate properties from the program based on funding availability, owner participation, or project feasibility.

  1. Permits and Code Compliance
    The Contractor shall comply with all applicable:
    Philadelphia L&I requirements
    OSHA standards
    HUD requirements
    Historic preservation requirements where applicable

The Contractor shall respond promptly to permit comments, inspection issues, and code compliance matters.

  1. Coordination with BBG
    The Contractor shall coordinate with BBG regarding:
    Construction clarifications
    Shop drawings and submittals
    Requests for Information (RFIs)
    Proposed substitutions
    Field conditions
    Change order requests

Contractors shall primarily coordinate with BBG on all design, construction, coordination, and contract related matters. Limited communication may be required with LNPCDC, SWRL, and participating property owners throughout the duration of the project.

Deviations from approved plans shall not be permitted without written authorization from LNPCDC and BBG.

Additional work or change orders may not proceed without prior written approval from the appropriate project representatives (LNPCDC, BBG, PHA, and Commerce), as applicable.

  1. Construction Inspections
    The Contractor shall participate in construction progress inspections with representatives from LNPCDC and BBG. The Contractor shall promptly correct any identified deficiencies or non-conforming work.

  2. Final Inspection
    Upon substantial completion, the Contractor shall participate in a final inspection with LNPCDC, BBG, Commerce, PHA, SWRL, and the property owner. A punch list may be issued and must be completed prior to final payment.

  3. Payment
    The Contractor shall submit:
    Detailed invoices
    Schedule of values
    Lien waivers
    Supporting documentation for completed work

Payment schedules will be established through the final negotiated construction agreement.

  1. Warranty
    The Contractor shall guarantee all workmanship and installed materials for a minimum period of twelve (12) months from final acceptance. The Contractor shall promptly address warranty issues identified by LNPCDC, BBG, or the property owner.

  2. Schedule and Project Management
    The Contractor shall:
    Maintain project schedules
    Coordinate subcontractors
    Attend project meetings
    Provide regular progress updates as requested
    Coordinate site logistics and sequencing

Failure to maintain adequate progress may constitute grounds for termination or reassignment of work.

  1. Meetings
    The Contractor shall attend:
    Pre-construction meetings
    Weekly progress meetings
    Site walkthroughs
    Coordination meetings with property owners and stakeholders
    Final inspections

The Contractor may also be required to participate in meetings related to environmental reviews, historic preservation, or lead-safe work practices.

INSURANCE REQUIREMENTS
The selected Contractor shall maintain, at its sole cost and expense, the following minimum insurance coverage for the duration of the project and shall provide certificates of insurance to LNPCDC and BBG prior to mobilization:

Coverage Type
Minimum Limits Required
Commercial General Liability
$1,000,000 per occurrence / $2,000,000 general aggregate
Automobile Liability
$1,000,000 combined single limit
Workers' Compensation
Statutory limits (Commonwealth of Pennsylvania)
Employer's Liability
$1,000,000 per accident / $1,000,000 disease per employee / $1,000,000 disease policy limit

LNPCDC, BBG, PHA, and the City of Philadelphia shall be named as additional insureds on the Commercial General Liability, Automobile Liability, and Umbrella/Excess Liability policies on a primary and non-contributory basis. All policies shall include a waiver of subrogation in favor of the additional insureds. Certificates shall include thirty (30) days' written notice of cancellation or material change.

REQUIRED INFORMATION
Proposals submitted to LNPCDC and BBG shall include:

  1. Description of similar storefront, façade, or commercial rehabilitation projects completed by the firm.
  2. Qualifications and experience of personnel assigned to the project.
  3. Current contractor licenses and insurance certificates evidencing the limits specified in the Insurance Requirements section.
  4. References from comparable projects.
  5. Proposed construction management approach and schedule.
  6. Cost proposal priced against the $30,000 per-property maximum, including schedule of values and hourly rates for additional work.

Contractors are responsible for visiting the project sites and becoming familiar with existing conditions prior to submitting a proposal. Failure to inspect site conditions shall not relieve the Contractor of responsibility for properly completing the work.

CONTRACTOR SELECTION
The following criteria will be used in selecting Contractors:

Evaluation Criterion
1 Qualifications and relevant project experience
2 Ability to complete work in a timely and cost-conscious manner
3 Experience with occupied commercial properties
4 Capacity and staffing availability
5 References and past performance
6 Cost proposal
7 Possession of all required licenses and insurance at time of submission and throughout project duration

LNPCDC and BBG will conduct interviews prior to final selection.

MILESTONE SCHEDULE

KEY DATES

Pre-Bid Meeting
Monday, August 3rd at 10:00 AM — 2201 Ridge Ave, Philadelphia, PA 19121 (Mandatory, On-Site)

Questions Deadline
Friday, August 7th at 5:00 PM — Submit via "Ask a Question" in PennBid

Proposals Due
Friday, August 21st at 5:00 PM — Submit electronically through PennBid

Contract Award
*Friday, September 11th

*Proposed dates are tentative and subject to change.

There will be a mandatory, on-site pre-bid meeting for all interested Contractors at 10:00 AM on Monday, August 3rd. The meeting will begin at 2201 Ridge Ave, Philadelphia, PA 19121.

The deadline for question submission will be 5:00 PM on Friday, August 7th. Questions must be submitted through the "Ask a Question" feature in PennBid.

Final proposals shall be submitted electronically through PennBid no later than 5:00 PM on Friday, August 21st.

An example storefront elevation is included with this solicitation for reference. Design elevations for the remaining storefronts will be issued exclusively during the mandatory pre-bid walkthrough. Bidders shall incorporate the provided design elevations into their proposals for the purpose of developing an accurate understanding of the project, preparing complete and accurate pricing, and defining the proposed scope of work.

For additional information, all inquiries must be submitted through PennBid.

PLEASE NOTE

All costs associated with proposal preparation are the responsibility of the applicant.
This Request for Proposals is not subject to the competitive sealed bidding process and contracts will not necessarily be awarded to the lowest bidder.
LNPCDC, BBG, Commerce, and PHA reserve the right to reject any or all proposals, modify the project scope or selection process, and/or procure services by other means.
LNPCDC and BBG reserve the right to reject any proposed subcontractor, material substitution, or construction method deemed unsuitable for the program.
Submission of a proposal constitutes acceptance of all provisions contained within this RFP.
The successful bidder shall be responsible for a nominal percentage fee charged by PennBid.

Documents5
9.2 Section K-Section 3-update May 2026.pdfPDF
General Wage Decision PA20260003_ 5.18.26_ Mod 1_ Building.pdfPDF
HUD T _ C_s.pdfPDF
Sharswood-TSIP-GC-RFP-Final.pdfPDF
Typical Storefront.pdfPDF

Contact

Address
Lower North Philadelphia CDC, Better Building Group, with funding from the Philadelphia Department of Commerce and Philadelphia Housing Authority, Philadelphia County, PA
Full source recordfrom PennBid
Detail
Type
RFP
Doc Count
5
Date Open Raw
2026-07-20 21:00:00
Description
The selected General Contractor shall furnish all labor, supervision, materials, equipment, permits, coordination, and related services necessary to complete all storefront rehabilitation work in accordance with approved construction documents and applicable codes. Construction work may include, but is not limited to: Storefront demolition and removal Masonry and façade repairs Exterior framing and carpentry Doors, windows, and glazing Metal and ornamental work Exterior lighting and electrical work Signage installation Painting and finishes Waterproofing and sealing Accessibility and code compliance improvements Limited structural stabilization and repairs Temporary protection, signage, site safety measures, and daily cleanup WE ARE SEEKING PROFESSIONAL SERVICES FOR THE FOLLOWING TASKS 1. Construction Services The Contractor shall complete construction work in accordance with approved permit drawings, specifications, and all applicable City, State, Federal, HUD, OSHA, and Philadelphia L&I requirements. The Contractor shall: Provide all required labor, supervision, tools, materials, and equipment Maintain a safe, clean, and secure work site at all times Maintain business operations, pedestrian access, and public right-of-ways throughout construction to the greatest extent practicable. Temporary closures or access restrictions shall be limited to those necessary to safely perform the work. Identify all planned closures and access restrictions as milestones within the project schedule and provide a written safety and execution plan to BBG and affected businesses with a minimum of two (2) weeks advance notice prior to implementation Maintain construction schedules Coordinate inspections and required permits Coordinate with business owners to minimize disruption Promptly address deficiencies identified during inspections 2. Cost Proposal The responsive Contractor shall submit: A detailed cost proposal priced against the $30,000 per-property maximum Schedule of values per property Unit pricing where applicable Hourly rates for additional work Proposed project schedule Construction work will be awarded on a grouped package basis at the discretion of LNPCDC and BBG. LNPCDC reserves the right to increase, decrease, or eliminate properties from the program based on funding availability, owner participation, or project feasibility. 3. Permits and Code Compliance The Contractor shall comply with all applicable: Philadelphia L&I requirements OSHA standards HUD requirements Historic preservation requirements where applicable The Contractor shall respond promptly to permit comments, inspection issues, and code compliance matters. 4. Coordination with BBG The Contractor shall coordinate with BBG regarding: Construction clarifications Shop drawings and submittals Requests for Information (RFIs) Proposed substitutions Field conditions Change order requests Contractors shall primarily coordinate with BBG on all design, construction, coordination, and contract related matters. Limited communication may be required with LNPCDC, SWRL, and participating property owners throughout the duration of the project. Deviations from approved plans shall not be permitted without written authorization from LNPCDC and BBG. Additional work or change orders may not proceed without prior written approval from the appropriate project representatives (LNPCDC, BBG, PHA, and Commerce), as applicable. 5. Construction Inspections The Contractor shall participate in construction progress inspections with representatives from LNPCDC and BBG. The Contractor shall promptly correct any identified deficiencies or non-conforming work. 6. Final Inspection Upon substantial completion, the Contractor shall participate in a final inspection with LNPCDC, BBG, Commerce, PHA, SWRL, and the property owner. A punch list may be issued and must be completed prior to final payment. 7. Payment The Contractor shall submit: Detailed invoices Schedule of values Lien waivers Supporting documentation for completed work Payment schedules will be established through the final negotiated construction agreement. 8. Warranty The Contractor shall guarantee all workmanship and installed materials for a minimum period of twelve (12) months from final acceptance. The Contractor shall promptly address warranty issues identified by LNPCDC, BBG, or the property owner. 9. Schedule and Project Management The Contractor shall: Maintain project schedules Coordinate subcontractors Attend project meetings Provide regular progress updates as requested Coordinate site logistics and sequencing Failure to maintain adequate progress may constitute grounds for termination or reassignment of work. 10. Meetings The Contractor shall attend: Pre-construction meetings Weekly progress meetings Site walkthroughs Coordination meetings with property owners and stakeholders Final inspections The Contractor may also be required to participate in meetings related to environmental reviews, historic preservation, or lead-safe work practices. INSURANCE REQUIREMENTS The selected Contractor shall maintain, at its sole cost and expense, the following minimum insurance coverage for the duration of the project and shall provide certificates of insurance to LNPCDC and BBG prior to mobilization: Coverage Type Minimum Limits Required Commercial General Liability $1,000,000 per occurrence / $2,000,000 general aggregate Automobile Liability $1,000,000 combined single limit Workers' Compensation Statutory limits (Commonwealth of Pennsylvania) Employer's Liability $1,000,000 per accident / $1,000,000 disease per employee / $1,000,000 disease policy limit LNPCDC, BBG, PHA, and the City of Philadelphia shall be named as additional insureds on the Commercial General Liability, Automobile Liability, and Umbrella/Excess Liability policies on a primary and non-contributory basis. All policies shall include a waiver of subrogation in favor of the additional insureds. Certificates shall include thirty (30) days' written notice of cancellation or material change. REQUIRED INFORMATION Proposals submitted to LNPCDC and BBG shall include: 1. Description of similar storefront, façade, or commercial rehabilitation projects completed by the firm. 2. Qualifications and experience of personnel assigned to the project. 3. Current contractor licenses and insurance certificates evidencing the limits specified in the Insurance Requirements section. 4. References from comparable projects. 5. Proposed construction management approach and schedule. 6. Cost proposal priced against the $30,000 per-property maximum, including schedule of values and hourly rates for additional work. Contractors are responsible for visiting the project sites and becoming familiar with existing conditions prior to submitting a proposal. Failure to inspect site conditions shall not relieve the Contractor of responsibility for properly completing the work. CONTRACTOR SELECTION The following criteria will be used in selecting Contractors: Evaluation Criterion 1 Qualifications and relevant project experience 2 Ability to complete work in a timely and cost-conscious manner 3 Experience with occupied commercial properties 4 Capacity and staffing availability 5 References and past performance 6 Cost proposal 7 Possession of all required licenses and insurance at time of submission and throughout project duration LNPCDC and BBG will conduct interviews prior to final selection. MILESTONE SCHEDULE KEY DATES Pre-Bid Meeting Monday, August 3rd at 10:00 AM — 2201 Ridge Ave, Philadelphia, PA 19121 (Mandatory, On-Site) Questions Deadline Friday, August 7th at 5:00 PM — Submit via "Ask a Question" in PennBid Proposals Due Friday, August 21st at 5:00 PM — Submit electronically through PennBid Contract Award *Friday, September 11th *Proposed dates are tentative and subject to change. There will be a mandatory, on-site pre-bid meeting for all interested Contractors at 10:00 AM on Monday, August 3rd. The meeting will begin at 2201 Ridge Ave, Philadelphia, PA 19121. The deadline for question submission will be 5:00 PM on Friday, August 7th. Questions must be submitted through the "Ask a Question" feature in PennBid. Final proposals shall be submitted electronically through PennBid no later than 5:00 PM on Friday, August 21st. An example storefront elevation is included with this solicitation for reference. Design elevations for the remaining storefronts will be issued exclusively during the mandatory pre-bid walkthrough. Bidders shall incorporate the provided design elevations into their proposals for the purpose of developing an accurate understanding of the project, preparing complete and accurate pricing, and defining the proposed scope of work. For additional information, all inquiries must be submitted through PennBid. PLEASE NOTE All costs associated with proposal preparation are the responsibility of the applicant. This Request for Proposals is not subject to the competitive sealed bidding process and contracts will not necessarily be awarded to the lowest bidder. LNPCDC, BBG, Commerce, and PHA reserve the right to reject any or all proposals, modify the project scope or selection process, and/or procure services by other means. LNPCDC and BBG reserve the right to reject any proposed subcontractor, material substitution, or construction method deemed unsuitable for the program. Submission of a proposal constitutes acceptance of all provisions contained within this RFP. The successful bidder shall be responsible for a nominal percentage fee charged by PennBid.
Date Close Raw
2026-08-21 21:00:00
Document Links
/marketplace/api/blob?p=bonfire%2Fpennbid%2F244856%2F9.2%20Section%20K-Section%203-update%20May%202026.pdf&fn=9.2%20Section%20K-Section%203-update%20May%202026.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F244856%2FGeneral%20Wage%20Decision%20PA20260003_%205.18.26_%20Mod%201_%20Building.pdf&fn=General%20Wage%20Decision%20PA20260003_%205.18.26_%20Mod%201_%20Building.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F244856%2FHUD%20T%20_%20C_s.pdf&fn=HUD%20T%20_%20C_s.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F244856%2FSharswood-TSIP-GC-RFP-Final.pdf&fn=Sharswood-TSIP-GC-RFP-Final.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F244856%2FTypical%20Storefront.pdf&fn=Typical%20Storefront.pdf
Date Close
2026-08-21 21:00:00
Project ID
244856
Cat Review
At
Jul 29, 2026
Method
openrouter
Taxonomy
non-construction
Project Name
Request for Proposal - General Contracting Services
Reference ID
Lower North Philadelphia CDC, Better Building Group, with funding from the Philadelphia Department of Commerce and Philadelphia Housing Authority, Philadelphia County
Department ID
14641
Categorized By
llm-nc
Project Status ID
2
Private Project ID
6e3c455ba921da50816a1d5d613f554c
Project Sub Status ID
1
Project Visibility ID
1

Source: PennBid (solicitation PENNBID-244856), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.