Generate a quick AI overview of this bid, pulled from its details and the attached documents.
• Install one (1) 24-port network switch.
Replace nine (9) existing thermal cameras.
• Replace two (2) existing turret cameras currently positioned to overlook machinery.
• Add thermal camera to loading bay #5.
• Replace 1 – 8MP varifocal lens camera to overlook processing loading bays.
• Supply Ubiquiti remote TV viewer.
4. Technical Specifications
All proposed equipment shall meet or exceed the following specifications:
Basis of Design and Approved Equals: References to a specific manufacturer, product line,
or configuration are intended to establish the minimum basis of design, performance,
compatibility, and functional requirements only. Proposed equal systems shall be
submitted with the bid/proposal, including manufacturer names, model numbers, product
data sheets, a compliance matrix, NDAA compliance documentation, and a list of any
deviations from the specified requirements. Acceptance of any proposed equal shall be as
determined by the Engineer.
Category Specification
Basis-of-Design
Camera System
3 × Turret 8MP Fixed; 3 × LPR; 1 × 12MP Fisheye; 1 × 5MP PTZ Active
Deterrence; 15 × Thermal; 1 × 5MP multi-Sensor 360°; 1 × Panoramic Dual
Sensor; 3 × 8MP Varifocal Turret
Field of View 180°, 360°, varifocal lens, and LPR configurations as specified
Connectivity Wired, Power over Ethernet (PoE)
Recording
System NVR-based with a minimum of thirty (30) days of storage retention
Software
Features Motion detection, automated alert notifications, remote viewing access
Category
Specification
Compliance
Full adherence to applicable industry standards and regulations. All
proposed video management system (VMS) components, cameras,
network video recorders (NVRs), and associated networking equipment
shall be NDAA Section 889 compliant.
5. Proposal Submission Requirements
Vendors responding to this RFP shall provide the following documentation:
Procurement Compliance: All proposals shall be prepared and submitted in accordance
with applicable Pennsylvania municipal procurement requirements and the requirements
of this RFP. Bidders are responsible for submitting complete information for any proposed
equal with their bid/proposal; substitutions or proposed equals not submitted with the
bid/proposal may be rejected as non-responsive, at the discretion of the Authority and
Engineer.
Company Overview — Summary of organizational background and demonstrated
experience with comparable projects.
Technical Proposal — Detailed product specifications and documentation
confirming compliance with stated requirements.
Approved Equal Documentation - If proposing a system other than the basis-of
design system, provide complete documentation with the bid/proposal
demonstrating that the proposed system meets or exceeds the specified
requirements. The Engineer shall determine whether proposed equals are
acceptable.
Pricing Breakdown — Itemized costs inclusive of equipment, installation, end-user
training, and ongoing maintenance fees.
Warranty & Support Terms — Description of warranty coverage and post
installation support offerings.
Project Timeline — Estimated schedule from purchase order issuance through full
system commissioning.
4
5
Evaluation Criteria
Proposals will be evaluated on the following basis:
Criterion Consideration
Technical
Compliance
Degree to which the proposal meets all specified technical
requirements.
Vendor Experience &
Reputation Demonstrated history with security system projects of similar scope.
Project Timeline Reasonableness and feasibility of the proposed implementation
schedule. Preferred substantial completion no later than 10/31/2026.
Support & Warranty
Terms Quality and comprehensiveness of post-installation service offerings.
Key Dates
Milestone Date
RFP Issuance June 26,2026
Optional Pre-Bid Meeting
Deadline for Vendor Questions
July 8, 2026 (10:00 AM)
July 17, 2026 (Noon)
Proposal Submission Deadline July 24, 2026 (Noon)
Evaluation & Vendor Selection July 28, 2026
8. Optional Pre-Bid Meeting
Bidders are encouraged, but not required, to attend a pre-bid meeting on-site to familiarize
themselves with the project location on Wednesday, July 8, at 10:00 AM. The meeting will
be held in the Authority’s Board Room located at 253 Transfer Road, Bellefonte, PA 16823.
9. Contact Information
All inquiries and proposal submissions should be directed to:
Patrick R. Burke, P.E.
Senior Project Manager
Entech Engineering, Inc.
pburke@entecheng.com
570-274-0294
Source: PennBid (solicitation PENNBID-242146), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →