Light RFP
Government · Pennsylvania

2026 Water Main Replacement Projects 4148.023

Due Aug 4, 2026·7 days left·PlumbingView official posting ↗
Issuing agency
PennBid
Method
Request for Proposals
Location
Pennsylvania
Posted
Jun 23, 2026
Takeaways by LightRFP AI
  • Kline Township Municipal Authority is soliciting bids for the 2026 Water Main Replacement Projects (Entech No. 4148.023).
  • The project includes three phases: Phase A (Tresckow Fire Loop), Phase B (Hancock Street Phase 2), and Phase C (Snyder Avenue).
  • Bids will be received electronically via the PennBid Program until 10:00 am local time on Tuesday, August 4, 2026.
  • A mandatory pre-bid conference will be held on Wednesday, July 8, 2026, at 2:00 p.m. at the Kline Township Municipal Authority Office.
  • Requirement: 10% bid security is required, as stated in '10% bid security'.
  • Requirement: Disadvantaged Business Enterprise (DBE) Solicitation Six Good Faith Efforts must be met.
  • Requirement: Davis Bacon Act federal wage rates must be paid by the Contractors on this project.
  • Requirement: American Iron and Steel requirements of P.L. 113-76, the Consolidation Appropriations Act of 2014 apply.
  • Requirement: Public Works Employment Verification Act, Act 127 of 2012 must be met.

AI-generated, verify all details against the official documents.

Description

Kline Township Municipal Authority (Owner) is requesting Bids for the construction of the following Project:
2026 Water Main Replacement Projects
Entech No. 4148.023
Bids for the construction of the Project will be received electronically via the PennBid Program by the Kline Township Municipal Authority until 10:00 am local time Tuesday, August 4, 2026. After bid opening, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of an award.
The Project includes the following Work:
Phase A Tresckow Fire Loop Water Main Replacement Project: Replacement of approximately 4,300 linear feet of cast iron and asbestos cement lined pipe with new 4-12 inch ductile iron pipe, 80 linear feet of 2-inch PE, 118 services, and 7 hydrants along Maple Street, Elm Street, Market Street (S.R. 4004), and Oak Street within Banks Township, Carbon County.
Phase B Hancock Street Phase 2 Water Main Replacement Project: Replacement of approximately 3,000 linear feet of cast iron and asbestos cement lined pipe with new 4-8 inch ductile iron pipe, 10 linear feet of 2-inch PE, 52 services, and 4 hydrants along Carl Street, Bayview Avenue, Kelayres Road (S.R. 1009), and Hancock Street within McAdoo Borough and Kline Township, Schuylkill County.
Phase C Snyder Avenue Water Main Replacement Project: Replacement of approximately 4,400 linear feet of cast iron pipe and asbestos cement pipe with new 4-8 inch ductile iron pipe, 50 services, and 10 fire hydrants along Carl Street, Snyder Avenue, Marcus Street, Bayview Terrace and Hillside Road within Kline Township, Schuylkill County.
Obtaining the Bidding Documents
All project documents are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com). Prime contractors are required to solicit and encourage Disadvantaged Business Enterprises (DBE) to participate with construction, supplies, equipment/materials.
Pre-bid Conference
A mandatory pre-bid conference for the Project will be held on Wednesday, July 8, 2026, at 2:00 p.m. at the Kline Township Municipal Authority Office located at 8 East Market Street, McAdoo, PA 18237. Attendance at the pre-bid conference is required to bid.
Instructions to Bidders.
For all further requirements regarding bid submittal, 10% bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Funding agency requirements that are applicable but not limited to this project include: Disadvantaged Business Enterprise (DBE) Solicitation Six Good Faith Efforts; Davis Bacon Act Federal Wage Rates, and American Iron and Steel requirements of P.L. 113-76, the Consolidation Appropriations Act of 2014.
Attention is called to the fact that Davis Bacon Act federal wage rates must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012.
Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. Any and all of the iron and steel, manufactured products and construction materials used in the project will be produced in the United States in a manner that complies with Build America, Buy America requirements.
The Kline Township Municipal Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.
Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Documents3
2025-06-22 4148.024 KTMA Bidding Full Package.pdfPDF
2026 Water Main Replacement Projects Addendum No. 1 4148.023.pdfPDF
KTMA 2026 WATER MAIN REPLACEMENT PROJECTS 6-22-2026 FINAL PENNBID.pdfPDF

Contact

Address
Kline Township Municipal Authority, Schuylkill County, PA
Full source recordfrom PennBid
Detail
Date Open Raw
2026-06-22 20:00:00
Description
Kline Township Municipal Authority (Owner) is requesting Bids for the construction of the following Project: 2026 Water Main Replacement Projects Entech No. 4148.023 Bids for the construction of the Project will be received electronically via the PennBid Program by the Kline Township Municipal Authority until 10:00 am local time Tuesday, August 4, 2026. After bid opening, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of an award. The Project includes the following Work: Phase A Tresckow Fire Loop Water Main Replacement Project: Replacement of approximately 4,300 linear feet of cast iron and asbestos cement lined pipe with new 4-12 inch ductile iron pipe, 80 linear feet of 2-inch PE, 118 services, and 7 hydrants along Maple Street, Elm Street, Market Street (S.R. 4004), and Oak Street within Banks Township, Carbon County. Phase B Hancock Street Phase 2 Water Main Replacement Project: Replacement of approximately 3,000 linear feet of cast iron and asbestos cement lined pipe with new 4-8 inch ductile iron pipe, 10 linear feet of 2-inch PE, 52 services, and 4 hydrants along Carl Street, Bayview Avenue, Kelayres Road (S.R. 1009), and Hancock Street within McAdoo Borough and Kline Township, Schuylkill County. Phase C Snyder Avenue Water Main Replacement Project: Replacement of approximately 4,400 linear feet of cast iron pipe and asbestos cement pipe with new 4-8 inch ductile iron pipe, 50 services, and 10 fire hydrants along Carl Street, Snyder Avenue, Marcus Street, Bayview Terrace and Hillside Road within Kline Township, Schuylkill County. Obtaining the Bidding Documents All project documents are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com). Prime contractors are required to solicit and encourage Disadvantaged Business Enterprises (DBE) to participate with construction, supplies, equipment/materials. Pre-bid Conference A mandatory pre-bid conference for the Project will be held on Wednesday, July 8, 2026, at 2:00 p.m. at the Kline Township Municipal Authority Office located at 8 East Market Street, McAdoo, PA 18237. Attendance at the pre-bid conference is required to bid. Instructions to Bidders. For all further requirements regarding bid submittal, 10% bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Funding agency requirements that are applicable but not limited to this project include: Disadvantaged Business Enterprise (DBE) Solicitation Six Good Faith Efforts; Davis Bacon Act Federal Wage Rates, and American Iron and Steel requirements of P.L. 113-76, the Consolidation Appropriations Act of 2014. Attention is called to the fact that Davis Bacon Act federal wage rates must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. Any and all of the iron and steel, manufactured products and construction materials used in the project will be produced in the United States in a manner that complies with Build America, Buy America requirements. The Kline Township Municipal Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.
Document Links
/marketplace/api/blob?p=bonfire%2Fpennbid%2F241470%2F2025-06-22%204148.024%20KTMA%20Bidding%20Full%20Package.pdf&fn=2025-06-22%204148.024%20KTMA%20Bidding%20Full%20Package.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F241470%2F2026%20Water%20Main%20Replacement%20Projects%20Addendum%20No.%201%204148.023.pdf&fn=2026%20Water%20Main%20Replacement%20Projects%20Addendum%20No.%201%204148.023.pdf, /marketplace/api/blob?p=bonfire%2Fpennbid%2F241470%2FKTMA%202026%20WATER%20MAIN%20REPLACEMENT%20PROJECTS%206-22-2026%20FINAL%20PENNBID.pdf&fn=KTMA%202026%20WATER%20MAIN%20REPLACEMENT%20PROJECTS%206-22-2026%20FINAL%20PENNBID.pdf
Date Close
2026-08-04 14:00:00
Project ID
241470
Project Name
2026 Water Main Replacement Projects 4148.023
Reference ID
Kline Township Municipal Authority, Schuylkill County
Department ID
8153
Categorized By
embed
Project Status ID
2
Private Project ID
f7406e6fa62697e97c44d96262d11807
Project Sub Status ID
1
Project Visibility ID
1

Source: PennBid (solicitation PENNBID-241470), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.