- Scope
- This project will correct existing deficiencies and prevent further deterioration of bridge components on various bridges located on Interstate 84 and Interstate 684 in the towns of Montgomery, Southeast, and Wawayanda in Orange and Putnam Counties. Work will include element specific bridge repairs including but not limited to the bridge's substructure, bearings, joints, and girders.
- Region
- HUDSON VALLEY
- Address
- Hudson Valley Region — Orange, Putnam County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Orange, Putnam
- Overview
- Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Spring 2027.
- Construction is expected to begin in Summer 2027.
- Construction is expected to be completed in Winter 2028/2029.
Cost of the Project
The project cost is approximately $4,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- In Development
- Contact Name
- Heather Pillsworth
- Contact Text
- Contact Us
If you have questions please contact:
Heather Pillsworth, PIN-881750
NYSDOT Region 8 Public Information Officer
4 Burnett Boulevard
Phone: 845-431-7911
- Description
- ## Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Spring 2027.
- Construction is expected to begin in Summer 2027.
- Construction is expected to be completed in Winter 2028/2029.
Cost of the Project
The project cost is approximately $4,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This project will correct existing deficiencies and prevent further deterioration of bridge components on various bridges located on Interstate 84 and Interstate 684 in the towns of Montgomery, Southeast, and Wawayanda in Orange and Putnam Counties. Work will include element specific bridge repairs including but not limited to the bridge's substructure, bearings, joints, and girders.
## Location
This project is located in the **Hudson Valley** region.
**Counties:** Orange, Putnam

- Contact Email
- R8Projects@dot.state.ny.us
- Contact Phone
- 845-431-7911
- Location Text
- This project is located in the HUDSON VALLEY region and includes the following:
Counties
ORANGE
PUTNAM
- Bid Opening Raw
- Spring 2027
- Estimated Value
- 4000000
- Construction End
- Winter 2028/2029
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
39th Senatorial District (Rob Rolison)
40th Senatorial District (Pete Harckham)
42nd Senatorial District (James Skoufis)
State Assembly District(s)
094th Assembly District (Matt Slater)
098th Assembly District (Karl Brabenec)
101st Assembly District (Brian Maher)
- Construction Begin
- Summer 2027