- Scope
- This project will consist of replacing traffic control devices at various federal aid eligible locations throughout Dutchess, Orange, and Rockland counties. The work will include, but won't be limited to, replacing signals, enhancing signage, replacing embedded poles, and adding pedestrian signals and crosswalks where needed.
- Region
- HUDSON VALLEY
- Address
- Hudson Valley Region — Dutchess, Orange, Rockland County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Dutchess, Orange, Rockland
- Overview
- Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2027.
- Construction is expected to begin in Fall 2027.
- Construction is expected to be completed in Fall 2028.
Cost of the Project
The project cost is approximately $8,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- In Development
- Contact Name
- Heather Pillsworth
- Contact Text
- Contact Us
If you have questions please contact:
Heather Pillsworth, PIN-881646
NYSDOT Region 8 Public Information Officer
4 Burnett Boulevard
Phone: 845-431-7911
- Description
- ## Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2027.
- Construction is expected to begin in Fall 2027.
- Construction is expected to be completed in Fall 2028.
Cost of the Project
The project cost is approximately $8,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This project will consist of replacing traffic control devices at various federal aid eligible locations throughout Dutchess, Orange, and Rockland counties. The work will include, but won't be limited to, replacing signals, enhancing signage, replacing embedded poles, and adding pedestrian signals and crosswalks where needed.
## Location
This project is located in the **Hudson Valley** region.
**Counties:** Dutchess, Orange, Rockland

- Contact Email
- R8Projects@dot.state.ny.us
- Contact Phone
- 845-431-7911
- Location Text
- This project is located in the HUDSON VALLEY region and includes the following:
Counties
DUTCHESS
ORANGE
ROCKLAND
- Bid Opening Raw
- Summer 2027
- Estimated Value
- 8000000
- Construction End
- Fall 2028
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)
19th Congressional District (Josh Riley)
State Senatorial District(s)
38th Senatorial District (Bill Weber)
39th Senatorial District (Rob Rolison)
40th Senatorial District (Pete Harckham)
41st Senatorial District (Michelle Hinchey)
42nd Senatorial District (James Skoufis)
State Assembly District(s)
096th Assembly District (Patrick J. Carroll)
097th Assembly District (Aron Wieder)
098th Assembly District (Karl Brabenec)
098th Assembly District (Karl Brabenec)
099th Assembly District (Chris Eachus)
099th Assembly District (Chris Eachus)
100th Assembly District (Paula Elaine Kay)
101st Assembly District (Brian Maher)
103rd Assembly District (Sarahana Shrestha)
104th Assembly District (Jonathan G. Jacobson)
104th Assembly District (Jonathan G. Jacobson)
105th Assembly District (Anil Beephan, Jr.)
106th Assembly District (Didi Barrett)
- Construction Begin
- Fall 2027