- Scope
- This project will consist of replacing or installing new traffic control devices at intersections in Dutchess County. The work will include, but won't be limited to, replacing signals, installing flashing beacons and adding pedestrian signals and crosswalks at the intersections of Route 9D at Verplanck Ave in the City of Beacon, Route 44 at Route 82/Route 343 in the Town of Washington and Village of
Millbrook, Eastbound Arterial (Route 44) at Fairmont Ave in the Town of Poughkeepsie, Route 22 @ Quaker Ave in the Town and Village of Pawling, and Route 115 at West Road in the Town of Pleasant Valley.
- Region
- HUDSON VALLEY
- Address
- Hudson Valley Region — Dutchess County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Dutchess
- Overview
- Project Overview
Project Status
- The current status of the project is Future Development.
- The Bid Opening is expected to be in Fall 2027.
- Construction is expected to begin in Winter 2027/2028.
- Construction is expected to be completed in Spring 2029.
Cost of the Project
The project cost is approximately $1,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- Future Development
- Contact Name
- Heather Pillsworth
- Contact Text
- Contact Us
If you have questions please contact:
Heather Pillsworth, PIN-881572
NYSDOT Region 8 Public Information Officer
4 Burnett Boulevard
Phone: 845-431-7911
- Description
- ## Project Overview
Project Status
- The current status of the project is Future Development.
- The Bid Opening is expected to be in Fall 2027.
- Construction is expected to begin in Winter 2027/2028.
- Construction is expected to be completed in Spring 2029.
Cost of the Project
The project cost is approximately $1,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This project will consist of replacing or installing new traffic control devices at intersections in Dutchess County. The work will include, but won't be limited to, replacing signals, installing flashing beacons and adding pedestrian signals and crosswalks at the intersections of Route 9D at Verplanck Ave in the City of Beacon, Route 44 at Route 82/Route 343 in the Town of Washington and Village of
Millbrook, Eastbound Arterial (Route 44) at Fairmont Ave in the Town of Poughkeepsie, Route 22 @ Quaker Ave in the Town and Village of Pawling, and Route 115 at West Road in the Town of Pleasant Valley.
## Location
This project is located in the **Hudson Valley** region.
**Counties:** Dutchess

- Contact Email
- R8Projects@dot.state.ny.us
- Contact Phone
- 845-431-7911
- Location Text
- This project is located in the HUDSON VALLEY region and includes the following:
Counties
DUTCHESS
Villages
MILLBROOK
PAWLING
- Bid Opening Raw
- Fall 2027
- Estimated Value
- 1000000
- Construction End
- Spring 2029
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
17th Congressional District (Michael Lawler)
18th Congressional District (Patrick Ryan)
State Senatorial District(s)
39th Senatorial District (Rob Rolison)
41st Senatorial District (Michelle Hinchey)
State Assembly District(s)
104th Assembly District (Jonathan G. Jacobson)
105th Assembly District (Anil Beephan, Jr.)
106th Assembly District (Didi Barrett)
- Construction Begin
- Winter 2027/2028