- Scope
- Resurface pavement at the following sites: Route 9N from Route 74 to existing joint north of Brumbaugh Road, Town of Ticonderoga, Essex County; Route 4 from End Route 29 overlap to End Route 4/32 overlap, Towns of Saratoga and Northumberland, Saratoga County; Route 4 from Ten Broeck Street to Route 32, Town of Stillwater, Saratoga County; Route 50 from Interstate 87 ramp to existing joint/north of Perry Road, Town of Wilton and City of Saratoga Springs, Saratoga County; Route 50 from Start Route 50/67 overlap to existing joint at Front Street, Village of Ballston Spa, Saratoga County; Route 8 from Route 8/9 Loon Lake) to Interstate 87 northbound off ramp, Town of Chestertown, Warren County; Route 9 from Route 254 to Route 149, Town of Queensbury, Warren County; Route 9 from Route 149 to Route 9N South, Town of Lake George, Warren County; Route 22 from Archibald Street to East High Street, Town of Salem, Washington County.
- Region
- CAPITAL DISTRICT
- Address
- Capital District Region — Washington, Warren, Essex, Saratoga County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Washington, Warren, Essex, Saratoga
- Overview
- Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on Winter 2025/2026.
- Construction began in Spring 2026.
- Construction is expected to be completed in Winter 2026/2027.
Cost of the Project
The project cost is approximately $15,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- Under Construction
- Contact Name
- Scott Cook
- Contact Text
- Contact Us
If you have questions please contact:
Scott Cook, PIN-181150
NYSDOT Region 1 Public Information Officer
50 Wolf Road
Albany, NY 12232
Phone: 518-485-7768
- Description
- ## Project Overview
Project Status
- The current status of the project is Under Construction.
- The Bid Opening was on Winter 2025/2026.
- Construction began in Spring 2026.
- Construction is expected to be completed in Winter 2026/2027.
Cost of the Project
The project cost is approximately $15,000,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
Resurface pavement at the following sites: Route 9N from Route 74 to existing joint north of Brumbaugh Road, Town of Ticonderoga, Essex County; Route 4 from End Route 29 overlap to End Route 4/32 overlap, Towns of Saratoga and Northumberland, Saratoga County; Route 4 from Ten Broeck Street to Route 32, Town of Stillwater, Saratoga County; Route 50 from Interstate 87 ramp to existing joint/north of Perry Road, Town of Wilton and City of Saratoga Springs, Saratoga County; Route 50 from Start Route 50/67 overlap to existing joint at Front Street, Village of Ballston Spa, Saratoga County; Route 8 from Route 8/9 Loon Lake) to Interstate 87 northbound off ramp, Town of Chestertown, Warren County; Route 9 from Route 254 to Route 149, Town of Queensbury, Warren County; Route 9 from Route 149 to Route 9N South, Town of Lake George, Warren County; Route 22 from Archibald Street to East High Street, Town of Salem, Washington County.
## Location
This project is located in the **Capital District** region.
**Counties:** Washington, Warren, Essex, Saratoga

- Contact Email
- R1Projects@dot.state.ny.us
- Contact Phone
- 518-485-7768
- Location Text
- This project is located in the CAPITAL DISTRICT region and includes the following:
Counties
WASHINGTON
WARREN
ESSEX
SARATOGA
Villages
SCHUYLERVILLE
STILLWATER
BALLSTON SPA
- Bid Opening Raw
- Winter 2025/2026
- Estimated Value
- 15000000
- Construction End
- Winter 2026/2027
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
20th Congressional District (Paul Tonko)
21st Congressional District (Elise Stefanik)
State Senatorial District(s)
43rd Senatorial District (Jacob Ashby)
44th Senatorial District (James Tedisco)
45th Senatorial District (Daniel G. Stec)
State Assembly District(s)
112th Assembly District (Mary Beth Walsh)
113th Assembly District (Carrie Woerner)
114th Assembly District (Matthew Simpson)