- Scope
- This multi-location project proposes installing/upgrading of sidewalk curb ramps and installing/repairing of sidewalk segments to meet current Americans with Disabilities Act and Department standards to bring the curb ramps into compliance with the American with Disabilities Act.
1. NY24 (Hempstead Turnpike) from Elm Drive to Miller Road in the Town of Oyster Bay, Nassau County. Install/repair sidewalk segments.
2. NY110 (Broadhollow Road) from Michael Avenue to 160 feet north of Michael Avenue in the Town of Baylon, Suffolk County. Install/repair sidewalk segments.
3. NY24 (Conklin Street) from East Carmans Road to west of NY110 (Broadhollow Road) Avenue in the Town of Baylon, Suffolk County. Install/repair sidewalk segments.
4. NY231 (Deer Park Avenue) from Hale Road to Holmes Avenue in the Town of Babylon, Suffolk County. Install/upgrade curb ramps.
5. NY231 (Deer Park Avenue) from August Road to Half Hollow Road in the Towns of Babylon and Huntington, Suffolk County. Install sidewalk segment, install/upgrade curb ramps.
- Region
- LONG ISLAND
- Address
- Long Island Region — Suffolk, Nassau County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Suffolk, Nassau
- Overview
- Project Overview
Project Status
- The current status of the project is Future Development.
- The Bid Opening is expected to be in Summer 2030.
- Construction is expected to begin in Fall 2030.
- Construction is expected to be completed in Spring 2031.
Cost of the Project
The project cost is approximately $2,500,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- Future Development
- Contact Name
- Stephen Canzoneri
- Contact Text
- Contact Us
If you have questions please contact:
Stephen Canzoneri, PIN-0ADA30
NYSDOT Region 10 Public Information Officer
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6633
- Description
- ## Project Overview
Project Status
- The current status of the project is Future Development.
- The Bid Opening is expected to be in Summer 2030.
- Construction is expected to begin in Fall 2030.
- Construction is expected to be completed in Spring 2031.
Cost of the Project
The project cost is approximately $2,500,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This multi-location project proposes installing/upgrading of sidewalk curb ramps and installing/repairing of sidewalk segments to meet current Americans with Disabilities Act and Department standards to bring the curb ramps into compliance with the American with Disabilities Act.
1. NY24 (Hempstead Turnpike) from Elm Drive to Miller Road in the Town of Oyster Bay, Nassau County. Install/repair sidewalk segments.
2. NY110 (Broadhollow Road) from Michael Avenue to 160 feet north of Michael Avenue in the Town of Baylon, Suffolk County. Install/repair sidewalk segments.
3. NY24 (Conklin Street) from East Carmans Road to west of NY110 (Broadhollow Road) Avenue in the Town of Baylon, Suffolk County. Install/repair sidewalk segments.
4. NY231 (Deer Park Avenue) from Hale Road to Holmes Avenue in the Town of Babylon, Suffolk County. Install/upgrade curb ramps.
5. NY231 (Deer Park Avenue) from August Road to Half Hollow Road in the Towns of Babylon and Huntington, Suffolk County. Install sidewalk segment, install/upgrade curb ramps.
## Location
This project is located in the **Long Island** region.
**Counties:** Suffolk, Nassau

- Contact Email
- R10Projects@dot.state.ny.us
- Contact Phone
- 631-952-6633
- Location Text
- This project is located in the LONG ISLAND region and includes the following:
Counties
SUFFOLK
NASSAU
- Bid Opening Raw
- Summer 2030
- Estimated Value
- 2500000
- Construction End
- Spring 2031
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
01st Congressional District (Nick LaLota)
02nd Congressional District (Andrew Garbarino)
03rd Congressional District (Thomas R. Suozzi)
State Senatorial District(s)
02nd Senatorial District (Mario R. Mattera)
04th Senatorial District (Monica R. Martinez)
05th Senatorial District (Steven D. Rhoads)
08th Senatorial District (Alexis Weik)
State Assembly District(s)
009th Assembly District (Michael Durso)
010th Assembly District (Steve Stern)
011th Assembly District (Kwani B. O'Pharrow)
012th Assembly District (Keith P. Brown)
017th Assembly District (John K. Mikulin)
- Construction Begin
- Fall 2030