- Scope
- This multi-location project proposes to resurface pavements by removing the top layer of worn, deteriorated pavement and replacing it with new asphalt and fresh pavement markings. All proposed pavement work is expected to increase safety and provide a smooth riding surface for vehicular travel for the next 10 to 12 years.
1. Southern State Parkway at Exit 18 (Eagle Avenue) ramps in the Town of Hempstead, Nassau County
2. Southern State Parkway westbound to Peninsula Boulevard southbound ramp, Town of Hempstead, Nassau County.
3. Peninsula Boulevard southbound to Southern State Parkway westbound ramp, Town of Hempstead, Nassau County.
4. Meadowbrook State Parkway southbound from Southern State Parkway to Babylon Turnpike in the Town of Hempstead, Nassau County
5. Meadowbrook State Parkway northbound over East Meadow Brook Culvert in the Town of Hempstead, Nassau County
6. Meadowbrook State Parkway Right shoulder at Exit M6E (south of the overpass) in the Town of Hempstead, Nassau County
7. Meadowbrook State Parkway over Southern State Parkway Bridge Deck in the Town of Hempstead, Nassau County
8. NY110 (Broadway) from NY27A (Merrick Road) to NY27 (Sunrise Highway) in the Town of Babylon, Suffolk County
9. NY25A (Hallock Avenue) from NY112 (Main Street) to NY347 (Nesconset Highway) in the Town of Brookhaven, Suffolk County.
- Region
- LONG ISLAND
- Address
- Long Island Region — Suffolk, Nassau County — NY
- Funding
- Local
- No
- State
- Yes
- Federal
- Yes
- Mpo Text
- Statewide Transportation Improvement Program (STIP)
The Statewide Transportation Improvement Program (STIP) is a list of every project
in New York State for which Federal funding is proposed to be used and that is
scheduled to begin during the designated three Federal fiscal year time frame.
To review the STIP Project List by Region please see the
STIP Project Report .
- Counties
- Suffolk, Nassau
- Overview
- Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2028.
- Construction is expected to begin in Summer 2028.
- Construction is expected to be completed in Summer 2029.
Cost of the Project
The project cost is approximately $6,500,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
- Status Text
- In Development
- Contact Name
- Stephen Canzoneri
- Contact Text
- Contact Us
If you have questions please contact:
Stephen Canzoneri, PIN-081094
NYSDOT Region 10 Public Information Officer
250 Veterans Memorial Highway
Hauppauge, NY 11788
Phone: 631-952-6633
- Description
- ## Project Overview
Project Status
- The current status of the project is In Development.
- The Bid Opening is expected to be in Summer 2028.
- Construction is expected to begin in Summer 2028.
- Construction is expected to be completed in Summer 2029.
Cost of the Project
The project cost is approximately $6,500,000.
This project receives funding from the following sources:
Federal: Yes
State : Yes
Local : No
## Description
This multi-location project proposes to resurface pavements by removing the top layer of worn, deteriorated pavement and replacing it with new asphalt and fresh pavement markings. All proposed pavement work is expected to increase safety and provide a smooth riding surface for vehicular travel for the next 10 to 12 years.
1. Southern State Parkway at Exit 18 (Eagle Avenue) ramps in the Town of Hempstead, Nassau County
2. Southern State Parkway westbound to Peninsula Boulevard southbound ramp, Town of Hempstead, Nassau County.
3. Peninsula Boulevard southbound to Southern State Parkway westbound ramp, Town of Hempstead, Nassau County.
4. Meadowbrook State Parkway southbound from Southern State Parkway to Babylon Turnpike in the Town of Hempstead, Nassau County
5. Meadowbrook State Parkway northbound over East Meadow Brook Culvert in the Town of Hempstead, Nassau County
6. Meadowbrook State Parkway Right shoulder at Exit M6E (south of the overpass) in the Town of Hempstead, Nassau County
7. Meadowbrook State Parkway over Southern State Parkway Bridge Deck in the Town of Hempstead, Nassau County
8. NY110 (Broadway) from NY27A (Merrick Road) to NY27 (Sunrise Highway) in the Town of Babylon, Suffolk County
9. NY25A (Hallock Avenue) from NY112 (Main Street) to NY347 (Nesconset Highway) in the Town of Brookhaven, Suffolk County.
## Location
This project is located in the **Long Island** region.
**Counties:** Suffolk, Nassau

- Contact Email
- R10Projects@dot.state.ny.us
- Contact Phone
- 631-952-6633
- Location Text
- This project is located in the LONG ISLAND region and includes the following:
Counties
SUFFOLK
NASSAU
Villages
HEMPSTEAD
AMITYVILLE
- Bid Opening Raw
- Summer 2028
- Estimated Value
- 6500000
- Construction End
- Summer 2029
- Legislative Text
- Legislative Districts
This project falls within the geographical boundaries of the following legislative districts:
U.S. Senators
Schumer, Charles E.
Gillibrand, Kirsten
U.S. Congressional District(s)
01st Congressional District (Nick LaLota)
02nd Congressional District (Andrew Garbarino)
04th Congressional District (Laura Gillen)
State Senatorial District(s)
01st Senatorial District (Anthony H. Palumbo)
04th Senatorial District (Monica R. Martinez)
05th Senatorial District (Steven D. Rhoads)
06th Senatorial District (Siela A. Bynoe)
08th Senatorial District (Alexis Weik)
State Assembly District(s)
002nd Assembly District (Jodi Giglio)
004th Assembly District (Rebecca Kassay)
011th Assembly District (Kwani B. O'Pharrow)
014th Assembly District (David G. McDonough)
018th Assembly District (Noah Burroughs)
- Construction Begin
- Summer 2028