  • Miami-Dade County seeks a contractor for structural repairs to five stable buildings (A-E) at Tropical Park.
  • The project involves concrete spall patching and epoxy crack injection on the precast double T roof framing system.
  • Bids are due electronically to Monique Perez by 8/11/2026 at 02:00 PM.
  • A non-mandatory pre-bid meeting is scheduled for 7/15/2026 at 10:00 AM at Tropical Park.
  • The estimated value of the project is $850,000.
  • The contract duration is 365 calendar days with an anticipated start date of 9/1/2026.
  • Requirement: Primary license required is General Building Contractor; Building Contractor.
  • Requirement: A bid bond is required (Bid Bond Required: YES).
  • Requirement: A performance & payment bond is required (Performance & Payment Bond Required: YES).
  • Requirement: Liquidated damages are $250.00 per day ($$ Per Day: $250.00).

AI-generated, verify all details against the official documents.

Description

CONTRACTOR shall furnish all necessary supervision, labor, tools, materials, and safety equipment required to provide a complete installation of the Tropical Park Stable A-E – Building Repairs in accordance with the following.
The work consists of performing structural repairs to the existing Stable A- E buildings at Tropical Park, including concrete spall patching and epoxy crack repairs on the precast double T roof framing system and adjacent structural elements. Repairs involve removing deteriorated concrete, evaluating and cleaning exposed reinforcing steel, installing replacement reinforcement where necessary, applying approved bonding agents, and placing structural repair mortar to restore original profiles. Cracks will be routed, sealed, port installed, and injected with low viscosity epoxy in accordance with manufacturer requirements. All repairs must be performed in accordance with the structural notes, material specifications, and repair details in the construction documents and coordinated with the Owner and Engineer throughout the process. This project involves rehabilitating deteriorated portions of the Stable A-E concrete roof system and related structural components to restore their integrity and performance.
Contractor shall submit all proposed repair materials—including patching compounds, structural mortars, bonding agents, corrosion inhibitors, epoxy injection systems, and reinforcement—to the Engineer of Record for review and approval prior to use.
The Contractor shall prepare and submit an initial mock up of the proposed repair procedures, based on approved product submittals, demonstrating all steps of concrete spall repair and epoxy crack injection—including surface preparation, reinforcement cleaning, bonding agent application, patch placement, and port injection methods—for review by the Owner, Engineer, and Special Inspector prior to proceeding with full production work.
Contractor shall provide, install, maintain, and remove all necessary shoring and temporary bracing to ensure structural stability during repair operations. When required, engineered shoring drawings must be pre-pared and certified by a licensed professional engineer.
The Contractor shall phase the work so that repairs are completed one stable at a time, with each stable fully repaired and accepted before work begins on the next, and progression shall occur only after final approval of the completed work by the Owner, the Special Inspector, and the Building Department.
Work will be as per plans and specifications provided by Owner:
• Attachment A: Stable A Building Repair Plans
• Attachment B: Stable B Building Repair Plans
• Attachment C: Stable C Building Repair Plans
• Attachment D: Stable D Building Repair Plans
• Attachment E: Stable E Building Repair Plans

The Contractor acknowledges and agrees that this scope of work includes the includes performing all structural repairs to the existing Stable A–E buildings at Tropical Park, including concrete spall patching and epoxy crack injection on the precast double T roof framing system and adjacent structural components.

Technical Certification Requirements:
General Building Contractor, Building Contractor

Documents1
RPQ_No_2026TROPSR.pdfPDF

Contact

Address
Miami-Dade County, FL
Full source recordfrom Miami-Dade County Strategic Procurement Department
Detail
Title
Tropical Park - Stables A-E Building Repairs
Technical Cert
General Building Contractor, Building Contractor
Opening Date Full
8/11/2026 2:00:00 PM
Announcement Info
CONTRACTOR shall furnish all necessary supervision, labor, tools, materials, and safety equipment required to provide a complete installation of the Tropical Park Stable A-E – Building Repairs in accordance with the following. The work consists of performing structural repairs to the existing Stable A- E buildings at Tropical Park, including concrete spall patching and epoxy crack repairs on the precast double T roof framing system and adjacent structural elements. Repairs involve removing deteriorated concrete, evaluating and cleaning exposed reinforcing steel, installing replacement reinforcement where necessary, applying approved bonding agents, and placing structural repair mortar to restore original profiles. Cracks will be routed, sealed, port installed, and injected with low viscosity epoxy in accordance with manufacturer requirements. All repairs must be performed in accordance with the structural notes, material specifications, and repair details in the construction documents and coordinated with the Owner and Engineer throughout the process. This project involves rehabilitating deteriorated portions of the Stable A-E concrete roof system and related structural components to restore their integrity and performance. Contractor shall submit all proposed repair materials—including patching compounds, structural mortars, bonding agents, corrosion inhibitors, epoxy injection systems, and reinforcement—to the Engineer of Record for review and approval prior to use. The Contractor shall prepare and submit an initial mock up of the proposed repair procedures, based on approved product submittals, demonstrating all steps of concrete spall repair and epoxy crack injection—including surface preparation, reinforcement cleaning, bonding agent application, patch placement, and port injection methods—for review by the Owner, Engineer, and Special Inspector prior to proceeding with full production work. Contractor shall provide, install, maintain, and remove all necessary shoring and temporary bracing to ensure structural stability during repair operations. When required, engineered shoring drawings must be pre-pared and certified by a licensed professional engineer. The Contractor shall phase the work so that repairs are completed one stable at a time, with each stable fully repaired and accepted before work begins on the next, and progression shall occur only after final approval of the completed work by the Owner, the Special Inspector, and the Building Department. Work will be as per plans and specifications provided by Owner: • Attachment A: Stable A Building Repair Plans • Attachment B: Stable B Building Repair Plans • Attachment C: Stable C Building Repair Plans • Attachment D: Stable D Building Repair Plans • Attachment E: Stable E Building Repair Plans The Contractor acknowledges and agrees that this scope of work includes the includes performing all structural repairs to the existing Stable A–E buildings at Tropical Park, including concrete spall patching and epoxy crack injection on the precast double T roof framing system and adjacent structural components.
Listing
Title
Tropical Park - Stables A-E Building Repairs
Posted Date
07/10/2026
Opening Date
08/11/2026
Solicitation Type
Bids & Contracts
Solicitation Number
RPQ No 2026TROPSR
Enriched
Yes

Source: Miami-Dade County Strategic Procurement Department (solicitation MIAMI_DADE_SPD-RPQ-No-2026TROPSR), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.