Labor, Materials, Equipment, Transportation and All Other
Incidentals Necessary to Provide a Complete Modernization of Two
(2) Hydraulic Elevators at the Jefferson Parish Juvenile Court
BID DUE: September 29, 2026 AT 2:00 PM
ATTENTION VENDORS!!!
Please review all pages and respond accordingly, complying with all provisions
in the technical specifications and Jefferson Parish Instructions for Bidders and
General Terms and Conditions. All bids must be received on the Purchasing
Department’s eProcurement site, www.jeffparishbids.net, by the bid due date
and time. Late bids will not be accepted.
Jefferson Parish Purchasing Department
200 Derbigny Street
General Government Building, Suite 4400
Gretna, LA 70053
Purchasing Specialist: Sean Dumas
Email: Sean.Dumas@jeffparish.gov
Phone: 504-364-2808
Bid Bond
An Electronic Bid Bond must be submitted with this bid, through one of the respective clearing
houses at https://www.centralbidding.com/bid-bonds/ To access the bonding companies on
Central Bidding, hover over the “Central Bidding” link at the top of the page and select the “Bid
Bonds” link.
The electronic bid bond number is to be placed in the required section listed on the standard
envelope. Scanned copies of bid bonds will not be accepted with your submission.
Juvenile Court Elevator Modernization
Section 1.0 – Site Visit:
All prospective bidders can schedule a site visit with Robbie Brouillette from the Department of
General Services between 8:00 a.m. and 3:00 p.m., Monday through Friday. Mr. Brouillette can
be reached
at 504-364-2675.
- Pdf Text
- Bid Event No. 145
Labor, Materials, Equipment, Transportation and All Other
Incidentals Necessary to Provide a Complete Modernization of Two
(2) Hydraulic Elevators at the Jefferson Parish Juvenile Court
BID DUE: September 29, 2026 AT 2:00 PM
ATTENTION VENDORS!!!
Please review all pages and respond accordingly, complying with all provisions
in the technical specifications and Jefferson Parish Instructions for Bidders and
General Terms and Conditions. All bids must be received on the Purchasing
Department’s eProcurement site, www.jeffparishbids.net, by the bid due date
and time. Late bids will not be accepted.
Jefferson Parish Purchasing Department
200 Derbigny Street
General Government Building, Suite 4400
Gretna, LA 70053
Purchasing Specialist: Sean Dumas
Email: Sean.Dumas@jeffparish.gov
Phone: 504-364-2808
Bid Bond
An Electronic Bid Bond must be submitted with this bid, through one of the respective clearing
houses at https://www.centralbidding.com/bid-bonds/ To access the bonding companies on
Central Bidding, hover over the “Central Bidding” link at the top of the page and select the “Bid
Bonds” link.
The electronic bid bond number is to be placed in the required section listed on the standard
envelope. Scanned copies of bid bonds will not be accepted with your submission.
Juvenile Court Elevator Modernization
Section 1.0 – Site Visit:
All prospective bidders can schedule a site visit with Robbie Brouillette from the Department of
General Services between 8:00 a.m. and 3:00 p.m., Monday through Friday. Mr. Brouillette can
be reached
at 504-364-2675.
Section 2.0 – Scope:
We extend this proposal to provide labor, materials, equipment, transportation, and all other
incidentals necessary to modernize Two (2) hydraulic elevators at Jefferson Parish Juvenile
Court located at 1546 Gretna Blvd., Harvey, LA.
• One (1) passenger elevator, Cars #1 (Glass back).
• One (1) passenger elevator, Cars #2.
Section 3.0 – License and Certification Requirements:
The following licenses issued by the Louisiana State Licensing Board for Contractors will be
required for this bid. The license number must be placed in the appropriate field on the electronic
bid envelope. Failure to do so will result in your bid’s rejection in accordance with the law.
A Louisiana State Contractor’s License in the class listed below will be required in accordance
with La. R.S. 38:2212(B)(2) and 37:2150 et. seq., and such license number must be entered in the
appropriate field in the electronic procurement system. Failure to do so will result in your bid
being rejected and not read aloud in accordance with the law.
3.1 License(s) issued by the Louisiana State Licensing Board for Contractors:
• Limited Specialty Services
The apparent low bidder shall be required to provide sufficient proof of the following licenses
and certifications within 10 days of bid opening. Failure to provide this documentation or
sufficient documentation in the Parish’s discretion within 10 days of bid opening will result in
your rejection and the Parish moving on to the next lowest bidder. Submit documents to the
Department of General Services.
3.2 License/certifications issued by the Louisiana State Fire Marshal's Office:
• Conveyance Device Mechanic
3.3 Certifications issued by the National Association of Elevator Contractors or by the
National Elevator Industry Education Program (NEIEP):
• Certified Elevator Technician (CET)Bid Event #145SP - Page 1 of 28
Section 3.0 – License and Certification Requirements: continued
3.4 - Compliance with Regulatory Agencies and Codes
Upon request, the apparent low bidder shall be required to provide sufficient proof of their
capacity to be compliant with the following regulatory agencies and codes:
• ASME A17.1, 2, 5,
• National Electrical Code, NFPA 70 and 101
• Americans with Disabilities Act, ADA
• Local Fire Authority
Section 4.0 – Bonds:
• Surety Bond: An Electronic bid bond in the amount of 5% of the total bid will be
required with bid submission. The vendor shall indicate the electronic bid bond number
in the location specified on the electronic bid envelope. No scanned paper copies of any
bid bond will be accepted as part of the electronic bid submission.
• Performance Bond: A Performance Bond in the amount of 50% of the total contract
price will be required. The performance bond shall be produced upon contract
execution.
• Payment Bond: A payment bond of 50% of the total contract price will be required. The
payment bond shall be produced upon contract execution.
Section 5.0 – Submittals:
If the bidder intends to provide materials equal to or better than owner-specified materials, the
following shall be supplied upon request.
• Manufacturer's catalog data
• Detail sheets
• Specifications of the product
• Warranty information
Section 6.0 – Quantities/Inspection:
Bidders must inspect the sites and perform their measurements to determine the proper
quantity of materials and equipment required to complete this project. All measurements given
in these specifications are for informational purposes only.Bid Event #145SP - Page 2 of 28
Section 7.0 Bid Specifications:
• Provide labor, materials, equipment, tools, construction equipment, machinery,
incidentals, and other facilities and services necessary for proper execution and
completion of required work.
• Furnish and install equipment utilizing existing and modified hoistways and machine
rooms.
• All materials for this project shall be bidder-supplied new unless specified.
• No more than one elevator shall be out of service in a group of elevators (not including a
second car out of service for more than sixty minutes for regular preventive
maintenance during non-peak traffic periods).
• No Interruptions or changes in regular group automatic operation during normal
business hours.
• Firefighter’s Emergency Operation Phase I or II is not activated during regular business
hours.
• No activation of Standby Power Operation during regular business hours.
• No large equipment shall be transported through public or tenant spaces during regular
business hours.
• Bidder shall verify that the specified materials and equipment will fit into the designated
spaces and that, when installed per the manufacturers’ guidelines, they will ensure a
• complete, coordinated, satisfactory, and properly operating system.
• Equipment shall be installed so it may be easily removed for maintenance and repair.
• All equipment shall have maximum accessibility, safety, and continuity of operation.
• This project is a significant elevator modernization in an existing building open for public
business and will continue to operate throughout all phases of required work.
• It is essential that the bidder give special attention and priority to all matters concerning
project safety, protection from dust and loose materials, reduction of noise level,
protection from water and air infiltration into the building, and maintenance of neat,
sightly conditions in and around work areas inside and outside of the building.
• All packaging, scrap materials, and demolition debris shall be removed daily from the
building and site.
• Provide visible warning and direction signs, barricades, temporary lighting, overhead
protection, and hazard-free walking surfaces throughout public areas.
• Mechanical and electrical equipment shall have identification plates with the
Manufacturer’s name, address, model number, rating, and any other information
required by governing codes.Bid Event #145SP - Page 3 of 28
Section 7.0 Bid Specifications: continued
• Within 30 days of final acceptance, provide three sets of neatly bound written
information necessary for proper maintenance and adjustment of equipment. Include
the following as minimums.
Straight-line wiring diagrams of “as-installed” elevator circuits with an index of the
location and function of components. Provide one set reproducible wiring diagrams.
Mount one set of wiring diagrams on panels, racked or similarly protected, in the
elevator machine room. Provide the remaining set rolled and in a protective
drawing tube.
The written maintenance control program (MCP) is specifically designed for the
equipment included in this contract. Include any unique or product-specific
procedures or methods required to inspect or test the equipment. In addition,
identify weekly, bi-weekly, monthly, quarterly, and annual maintenance procedures,
including statutory and other equipment needed tests
All necessary interface cards for equipment maintenance, code-mandated testing,
and troubleshooting.
Instructions, including recommended grade of lubricants
Catalogs for all replaceable parts, including ordering forms and instructions
Four (4) sets of keys per elevator for all switches and control features are
appropriately tagged and marked.
Bound instructions explaining all operating features, including all apparatus in the
car and lobby control panels.
Bound maintenance and adjustment instructions explaining areas to be addressed,
methods and procedures to be used, and specified tolerances for all equipment.
Non-Proprietary Equipment Design:
Provide three sets of neatly bound written information necessary for proper
maintenance and adjustment of equipment within 30 days following final
acceptance. Final retention will be withheld until the purchaser receives the Data
and the Consultant reviews it. Include the following as minimums.
Provide Straight-line wiring diagrams of “as-installed” elevator circuits with an index
of the location and function of components. Mount one set of wiring diagrams on
panels, racked or similarly protected, in the elevator machine room. Provide the
remaining set rolled and in a protective drawing tube. Maintain all drawing sets in
addition to all subsequent changes. These diagrams are the Purchaser’s property. A
legend sheet shall be furnished with each set of drawings to provide the following
information:
1. Name and symbol of each relay, switch, or apparatus.
2. Location on drawings, drawing sheet number and area, and location of all
contacts.
3. Location of apparatus, whether on the controller or the car.Bid Event #145SP - Page 4 of 28
Section 7.0 Bid Specifications: continued
Non-Proprietary Equipment Design:
Provide a written Maintenance Control Program (MCP) specifically designed for the
equipment included under this contract. Include any unique or product-specific
procedures or methods required to inspect or test the equipment. In addition,
identify weekly, bi-weekly, monthly, quarterly, and annual maintenance procedures,
including statutory and other equipment needed tests.
Provide printed instructions explaining all operating features.
Provide complete software documentation for all installed equipment.
Provide catalogs listing all replaceable parts, including the Contractor’s identifying
numbers and ordering instructions.
Provide diagnostic test devices with all supporting information necessary for
interpreting test data, troubleshooting the elevator system, and performing routine
safety tests.
The elevator installation shall be designed to be maintained by any licensed elevator
maintenance company employing journeymen mechanics without purchasing or
leasing additional diagnostic devices or special tools.
Provide onsite capability to diagnose faults to the level of individual circuit boards
and individual discrete components for the solid-state elevator controller.
If the fault diagnosis equipment is not entirely self-contained within the controller,
the Department of General Services must be provided with a separate, detachable
device as required per the building listed in these specifications as part of this
installation. Such device shall be in the Department of General Services' possession
and become its property.
• Provide all upgrades and revisions of software during the progress of the work and
warranty period.
• Provide a QEI inspection before turnover for use by the general public. the owner shall
receive an inspection report.
General Summary
• Section includes modernization of hydraulic elevators as follows:
• One (1) passenger elevator, Cars #1 (Glass back).
• One (1) passenger elevator, Cars #2.
• Products Installed but Not Furnished Under This Section:
• Emergency Voice/Alarm Communication System Provisions (as required).
• CCTV camera provisions (as required).
• Elevator security devices, control unit, mounting brackets, wiring materials, logic
circuits, security system interface terminals, boxes, and relays. Elevator #2 – 1st floor
hall call button.
• Car interior finishes (as required).
• Car flooring (as required).Bid Event #145SP - Page 5 of 28
Section 7.0 Bid Specifications: continued
Definitions
• Technical terms used are defined in the latest edition of the Safety Code for Elevators
and Escalators, ASME A17.1, or in this section.
• ELEVATOR CONSULTANT or CONSULTANT refers to Lerch Bates Inc. (Lerch Bates).
• PROVIDE means “furnish and install.”
• MANUFACTURER means either the Original Equipment Manufacturer (OEM) or the
principal manufacturer of a component or system.
• RETAIN means, unless otherwise specified, the existing equipment is to be left in place
with no alterations and no change in the original manufacturer’s designed performance
or functionality. Items that are “retained” shall be thoroughly cleaned in place and
adjusted to achieve the originally designed function.
• REFURBISH means, unless otherwise specified, the existing equipment is to be cleaned,
repainted, repaired, and parts replaced to put the equipment into a condition to provide
the same appearance, performance, and functionality as the equipment provided when
it was originally installed. Unless otherwise specified, the scope of replacement of
components is limited to those items currently available for purchase as replacement
parts from the manufacturer or after-market suppliers approved by the manufacturer.
• REUSE means that the Contractor shall carefully remove equipment from the existing
installation, avoiding any damage or additional wear. Store in a safe location to maintain
the equipment in its pre-removal condition. Reinstall and incorporate into the
modernized elevator installation using the same procedures and recommendations
provided by the manufacturer of the equipment.
• CALL BACK means a request from the Owner to the Contractor to provide a technician
on site to evaluate an elevator that is out of service or not functioning properly, rectify
the root cause of the malfunction, and place the unit back into normal service.
• INCLUDES or INCLUDING means including the items specified, but not limited solely to
those items, if additional work or components are required to achieve the specified
outcome.
• Words in the singular shall include the plural whenever applicable or context so
indicates.
Work Included:
• Provide all labor, engineering, tools, transportation, services, supervision, materials, and
equipment necessary for and incidental to satisfactory completion of required work as
indicated in Contract Documents. This is a turnkey project. All necessary work
necessary for a code-compliant project is to be included by the Elevator Contractor.
This includes all electrical, fire alarm, shunt trip, receptacles, etc.
• Provide all required staging, hoisting, and movement of new equipment, reused
equipment, or removal of existing equipment.
• Applicable conditions of Owner’s General, Special, and Supplemental Conditions.
• Scope of work includes, but is not limited to, the following:Bid Event #145SP - Page 6 of 28
Section 7.0 Bid Specifications: continued
Work Included:
• Coordination, scheduling, and management of the work of component suppliers and
subcontractors.
• Furnish and install equipment as specified, utilizing existing and/or modified hoistways
and machine rooms.
• Containment, storage, transport, and disposal of all used hydraulic oil and jack hole
clean out spoils and debris removed from the existing jack hole at no extra cost to the
Owner.
Related work coordination:
• Coordinate the following requirements with other trades.
• Miscellaneous Steel:
• Pit ladders
• Electric:
• Electrical service, outlets, lights, switches in elevator machine rooms and pits.
• Finishes:
• Cab interiors, hoistway entrances, fixtures.
• Elevator Cab Flooring:
• Material and finish to be specified in other applicable section.
• Flooring installation must be coordinated to ensure the car saddle is installed at the
proper height (even with the finished floor).
Security Equipment:
• Coordinate location(s) in elevator machine rooms and cabs where cables, conduit,
components, etc., for CCTV and/or secure access interface equipment must be installed.
Action And Informational Submittals:
• Within thirty Calendar days after award of contract and before beginning equipment
fabrication, submit field-verified existing installation information for review.
• Hydraulic Car Information:
• Existing Total Car Weight:
• Documented on the crosshead data tag, all cars.
• Field Verified: weigh single cars and one car per group of each identical duty type.
• Estimated Gross Load on Jack
• Power Confirmation Information: Field-verified existing conditions at each elevator main
disconnect:
• Actual maximum available voltage and current.
• Verify true earth ground value.
• Within thirty Calendar days after award of contract and before beginning equipment
fabrication, submit planned modernization design information, shop drawings, and
required material samples for review. Allow thirty calendar days for response to initial
submittal.
• Indicate equipment lists, reactions, and design information on layouts, including:Bid Event #145SP - Page 7 of 28
Section 7.0 Bid Specifications: continued
Car:
• Total car weight to be included on the new crosshead data tag.
• Written confirmation that the designed modernization total combined weight of the car
and the rated load:
• Does not vary by more than 5% from that of the original installation.
• Verify buffer capacity via data tags or known manufacturing data.
• Power Confirmation Information: Design for existing conditions.
• Motor horsepower and code letter designation.
• Motor starter in-rush current, full load running current, and demand factor.
• Engineered power consumption based on hydraulic elevator with [HYDRAULIC UP
STARTS] upstarts per hour full load.
• Written confirmation that existing electrical provisions are adequate for post
modernization installation equipment requirements.
• Written confirmation that total planned modernization reactions on the building
structure do not exceed originally designed reactions by more than 5%. If the
installation has been altered previously and the original car-top data tag is missing,
confirm that the new reactions will not exceed the existing reactions.
Reaction calculations shall include:
• Gross Load on Jack.
• Traveling Cables.
• Total Car Weight.
• Car Capacity.
Product Data, Including:
• Capacities, sizes, performances, operation, control, signal systems operations, safety
features, finishes, and similar information.
• Product data for car enclosures and hoistway entrances.
• Product data for signal fixtures, lights, graphics, tactile marking plates, and details of
mounting.
• Full details of ascending car protection means and installation.
• Two-way conversation devices.
• Post-modernization machine room heat emissions in BTU.
• Shop Drawings:
• Fully Dimensioned Fixture Drawings:
• Car operating panels.
• Car floor indicators.
• Hall stations.
• Destination/landing input stations.
• Position indicators.
• Hall lanterns.
• Access key switch.
• Remote panels.Bid Event #145SP - Page 8 of 28
Section 7.0 Bid Specifications: continued
Product Data, Including:
• Samples for Verification:
• For exposed car, hoistway door and frame, and signal equipment finishes.
• Samples of Sheet Materials: 3" (75 mm) square.
• Running Trim Members: 4" (100 mm) lengths.
• Include full component samples, if requested:
• Signal fixtures.
• Lighting.
• Graphics.
• Braille Plates.
The Written Maintenance Control Program (MCP) is specifically designed for the
equipment included under this contract.
• Include any unique or product-specific procedures or methods required to inspect or
test the equipment.
• Identify weekly, bi-weekly, monthly, quarterly, and annual maintenance procedures,
including statutory and other required equipment tests.
Submittal review shall not be construed as an indication that the submittal is correct or
suitable or that the work represented by the submittal complies with the Contract
Documents. Compliance with Contract Documents, Code requirements, dimensions, fit,
and interface with other work is the Contractor’s responsibility.
• Acknowledge and/or respond to review comments within fourteen calendar days of
return.
• Promptly incorporate required changes due to inaccurate data or incomplete definitions
so that delivery and installation schedules are not affected.
• Identify and cloud drawing revisions, including Contractor elective revisions on each
resubmittal.
• Contractor’s revision response time is not a justification for equipment delivery or
installation delay.
Closeout Submittals
Manufacturer’s Warranty:
• Provide documentation of Manufacturer’s Warranty in compliance with Contract
Documents.
Owner’s Information:
• Provide electronic copies (flash drive or Consultant-approved equivalent) of written
information necessary for proper maintenance and adjustment of equipment within 30
days following final acceptance. Final retention will be withheld until the Consultant
receives and reviews the data.Bid Event #145SP - Page 9 of 28
Section 7.0 Bid Specifications: continued
Include the following as minimums:
• Straight-line wiring diagrams of “as-installed” elevator circuits with an index of location
and function of components. Provide one set of reproducible masters. Mount one set of
wiring diagrams on panels, racked, or similarly protected, in the elevator machine room.
Provide the remaining set rolled and in a protective drawing tube. Maintain all drawing
sets, including all subsequent changes. These diagrams are the Owner’s property.
• Written Maintenance Control Program (MCP) specifically designed for the equipment
included under this contract. Include any unique or product-specific procedures or
methods required to inspect or test the equipment. In addition, identify weekly, bi-
weekly, monthly, quarterly, and annual maintenance procedures, including statutory
and other required equipment tests.
• Lubrication instructions, including recommended grade of lubricants.
• Parts catalogs for all replaceable parts, including ordering forms and instructions.
• Instructions explaining all operating features, including all apparatus in the car and
lobby control panels.
• Maintenance Control Program documentation for all equipment.
Provide the Owner with the following:
• Any interface cards required for equipment maintenance, code-mandated testing, and
troubleshooting.
• Four sets of keys for all switches and control features properly tagged and marked.
• Diagnostic equipment complete with access codes, adjusters’ manuals, and set-up
manuals for adjustment, diagnosis, and troubleshooting of the elevator system, and
performance of routine safety tests.
Permits, Tests, And Certificates
Permits:
• Secure and pay for all permits required for Work to be performed, including but not
limited to:
• Municipal and State permits.
• Device or equipment removal permits.
• Hot works permits.
• Post, maintain, and renew all permits in compliance with local governmental
requirements.
• Obtain final close-out of all required permits.
• Tests and Inspections: Schedule with the AHJ and perform tests required by the
Governing Authority in accordance with the procedure described in ASME A17.2 Guide
for Inspection of Elevators, Escalators, and Moving Walks in the presence of an
• Authorized Representative of the AHJ. QEI Inspection to be provided upon completion
of modernization.
• Certificates: Obtain, pay for, and deliver to purchaser with all temporary and final
inspection certificates provided by the proper governing authorities.
• Violations: Resolve any outstanding violations on record with the AHJ on devices being
removed prior to final acceptance by the purchaser.Bid Event #145SP - Page 10 of 28
Section 7.0 Bid Specifications: continued
Permits:
• QUALITY ASSURANCE
• Compliance with Regulatory Agencies: Comply with the most stringent applicable
provisions of currently enforced codes, laws, and/or authorities, including revisions and
changes in effect, including, but not limited to:
• An inspection by a Qualified Elevator Inspector (QEI) will be provided prior to the
closeout of this project.
• American Society of Mechanical Engineers:
• ASME A17.1, Safety Code for Elevators, Escalators, and Moving Walks.
• ASME A17.2, Guide for Inspection of Elevators, Escalators, and Moving Walks.
• ASME A17.5, Elevator and Escalator Electrical Equipment.
• ASME A17.6, Standard for Elevator Suspension, Compensation, and Governor Systems.
• ASME A17.7, Performance-Based Safety Code for Elevators, Escalators, and Moving
Walks.
• National Fire Protection Association (NFPA):
• NFPA 70, National Electric Code.
• NFPA 80, Fire Doors and Windows.
• NFPA 101, Life Safety Code.
• International Building Code (IBC).
• Accessibility:
• American National Standard Institute (ANSI): A117.1, Accessible and Usable Buildings
and Facilities.
• Uniform Federal Accessibility Standards (UFAS).
• ADAAG, Americans with Disabilities Act Accessibility Guidelines.
• Inspections: Provide access to areas where work is being performed for the consultant
at any time throughout the project.
Maintenance
Interim Maintenance:
• Furnish preventive maintenance service on elevators described herein for a period from
mobilization, verbal or written, until each unit is removed from building service for
modernization. In addition, provide interim preventive maintenance for completed units
until the modernization of each group of elevators is complete and one-year warranty
maintenance, as defined below, commences. Perform interim maintenance based upon
terms and conditions of Owner’s existing maintenance agreement.
• Prior to the removal of any car from service, the consolidated callback service for all cars
in the specific group shall be no more than three calls per month. Contractor will be
responsible for providing preventative maintenance to achieve this requirement.
• If callback activity exceeds three callbacks per unit per month at any time when cars are
off-line, all maintenance must be completed on OT until callback rate is less than
three/unit/month.
• Use competent personnel, acceptable to Owner, employed and supervised by the
Elevator Contractor.Bid Event #145SP - Page 11 of 28
Section 7.0 Bid Specifications: continued
Delivery And Storage
• The protection of all equipment and exposed finishes shall be the responsibility of the
Elevator Contractor during delivery, handling, and installation until completion of
project.
• The Elevator Contractor shall replace damaged materials with new at no additional cost
for material and labor to Owner.
• Manufacturers’ original packing must adequately protect materials during delivery.
• Deliver materials to the site ready for use in the accepted manufacturer’s original and
unopened containers and packaging, bearing labels as to type of material, brand name,
and manufacturer’s name. Delivered materials shall be identical to accepted samples.
• Store materials in original protective packaging under cover in a dry and clean location
off the ground. Remove delivered materials that are damaged or otherwise not suitable
for installation from the job site and replace with acceptable materials.
• It is the responsibility of the Contractor to properly store and protect all materials in
space provided or designated by the Owner against damage, stains, scratches,
corrosion, weather, construction debris, and environmental conditions.
Products
Manufacturers And Products:
• Approved Elevator Systems:
• Approved subject to compliance with the requirements of the contract, provide
products by one or more of the following Principal Manufacturers. Where specific
product models are referenced below only those specific product models or types are
approved.
• Vantage
• MEI – Total Elevator Solutions.
• Vantage Elevator Solutions
• Approved Elevator Components In addition to products manufactured by the Principal
Manufacturers specified above, the following Manufacturers are approved for the
specific components listed below, subject to the requirements of the contract:
Controllers:
• GAL (Vantage)
• MCE (Nidec)
• Smart Rise.
• Alpha (Lykos Controller).
Hydraulic Machines (Power Units):
• EECO.
• Maxton.
• IMO.
• Bore-Max (Vantage)Bid Event #145SP - Page 12 of 28
Section 7.0 Bid Specifications: continued
Hydraulic Jack Assemblies:
• EECO.
• D.L. Martin.
• Nidec (Canton).
Passenger Elevator Door Equipment (Operators, Tracks, Hangers, and Closers):
• GAL.
• Wittur.
Cab Interior Finishes (Standard/Pre-Engineered/Cab Systems):
• FabACab.
• Cab Works.
• SnapCab.
Car and Hall Signal Fixtures:
• Innovation.
• MAD Fixtures.
Two-Way Audio Communication Device:
• Janus/Rath.
• Wurtec.
Two-Way Video/Non-Verbal Communication Devices:
• Janus/Rath.
• Wurtec.
Door Edge Detector with Approaching Object Detection:
• CEDES.
• Janus.
Materials
Steel:
• Sheet Steel (Furniture Steel for Exposed Work): Stretcher-leveled, cold-rolled,
commercial quality carbon steel, complying with ASTM A366, matte finish.
• Sheet Steel (for Unexposed Work): Hot-rolled, commercial quality carbon steel, pickled
and oiled, complying with ASTM A568/A568M-03.
• Structural Steel Shapes and Plates: ASTM A36.
Stainless Steel: Type 302 complying with ASTM A240, with standard tempers and hardness
required for fabrication, strength, and durability. Apply mechanical finish on fabricated
work in the locations shown or specified, Federal Standard and NAAMM nomenclature, with
texture and reflectivity required to match Architect’s sample. Protect with adhesive paper
covering.
• No. 4 Satin: Directional polish finish. Graining directions as shown or, if not shown, in
[DIRECTION] dimension.
• No. 8 Mirror: Reflective polish finish with no visible graining.Bid Event #145SP - Page 13 of 28
Section 7.0 Bid Specifications: continued
• Textured: 5WL as manufactured by Rigidized Metals or Windsor pattern as
manufactured by Rimex Metals or approved equal with .050" mean pattern depth with
bright directional polish (satin finish).
• Burnished: Non-directional, random abrasion pattern.
Bronze: Stretcher-leveled, re-squared sheets composed of 60% copper and 40% zinc similar
to Muntz Metal, Alloy Group 2, with standard temper and hardness required for fabrication,
strength, and durability. Clean and treat bronze surfaces before mechanical finish. After
completion of the final mechanical finish on the fabricated work, use a chemical cleaner to
produce finish, Federal Standard, and NAAMM nomenclature, matching Architect’s sample:
• No. 4 Satin: Directional polish finish, fine-satin, clear-coated with clear-organic coating
recommended by Fabricator. Provide graining direction as shown or, if not shown, in
vertical dimension.
• No. 8 Mirror: Reflective polish finish with no visible graining, bright-polished, clear-
coated finish with clear-organic lacquer coating recommended by Fabricator.
• Acid-Etched Pattern: Provide a No. 8 mirror reflective-polished background with
selectively acid-etched, matte-textured, custom pattern as shown. Acid selection and
dilution, if required, as recommended by Fabricator. After final finishing, coat bronze
with clear-organic lacquer coating recommended by Fabricator.
Aluminum: Extrusions per ASTM B221; sheet and plate per ASTM B209.
Plastic Laminate: ASTM E84 Class A and NEMA LD3.1, Fire-Rated Grade (GP-50), Type 7,
0.050" ±.005" thick, color and texture as follows:
• Exposed Surfaces: Color and texture selected by owner.
• Concealed Surfaces: Contractor’s standard color and finish.
• Fire-Retardant Treated Particle Board Panels: Minimum 3/4" thick backup for natural
finished wood and plastic laminate veneered panels, edged and faced as shown,
provided with suitable anti-warp backing; meet ASTM E84 Class “I” rating with a flame-
spread rating of 25 or less, registered with Local Authorities for elevator finish materials.
• Natural Finish Wood Veneer: Standard thickness, 1/40" thoroughly dried conforming to
ASME/HPMA HP-1983, Premium Grade. Place veneer, tapeless spliced with grain
running in direction shown, belt and polish sanded, book-matched. Species and finish
designated and approved by Architect.
• Paint: Clean exposed metal parts and assemblies of oil, grease, scale, and other foreign
matter and factory paint one shop coat of standard rust-resistant primer. After erection,
provide one finish coat of industrial enamel paint. Galvanized metal need not be
painted.
• Prime Finish: Clean all metal surfaces receiving a baked enamel paint finish of oil,
grease, and scale. Apply one coat of rust-resistant primer followed by a filler coat over
uneven surfaces. Sand smooth and apply final coat of primer.
• Baked Enamel Finish: Prime finish per above. Unless specified “prime finish” only, apply
and bake three additional coats of enamel in the selected solid color.Bid Event #145SP - Page 14 of 28
Section 7.0 Bid Specifications: continued
Entrance Field Paint:
• Clean all surfaces to remove dirt and grease.
• Sand and finish surfaces as necessary to remove pits and scratches and prepare the
surface for painting.
• Apply filler to ensure a smooth surface; sand and apply one coat of electrostatic enamel
in the selected solid color.
• Refinishing of natural metals: Remove existing protective finish. Buff as necessary to
remove scratches. Regrain or finish as specified and protect as indicated for the
particular metal type.
• Entrance Support Equipment within Hoistway: Include strut angles, headers, sill support
angles, fascia, hanger covers, etc.
• Clean, remove, and check for corrosive activity. Replace components that exhibit severe
deterioration.
• Tighten all fastenings.
Performance and Operation
• Car Speed: Allowable variance from contract speed of no more than +/- 10% in
the up direction and +/-10% in the down direction under any loading
condition.
• Car Capacity: Safely lower, stop, and hold the rated load.
• Car Stopping Zone: ±3/8" under any loading condition.
• Door Times: Seconds from start to fully open or fully closed:
• Cars #1 and #2: Door Open: 2.1 seconds. Door Close: 4.1 seconds.
• Car Floor-to-Floor Performance Time: Seconds from the start of doors closing
until doors are 3/4 open for center-opening doors or 1/2 open for side-
opening doors, and the car is level and stopped at the next successive floor
under any loading condition or travel direction:
• Cars #1 and #2: 17.3 seconds (= or – 10%). Floor Height: 13’-5” between floors
1 and 2.
Noise and Vibration Control:
• Airborne Noise:
• The measured noise level of elevator equipment and its operation shall not
exceed 60 dBA inside the car under any condition, including door operation
and car ventilation exhaust blower on its highest speed.
• Limit noise level in the machine room and control space relating to elevator
equipment and its operation to no more than 80 dBA.
• All dBA readings to be taken 3'-0" off the floor and 3'-0" from the equipment
using the “A” weighted scale.
• Vibration Control: Mechanically isolate all new elevator equipment from the
building structure and other components. Minimize objectionable noise and
vibration transmission to occupied areas of the building.Bid Event #145SP - Page 15 of 28
Section 7.0 Bid Specifications: continued
Elevator Operation Requirements
• General:
• Cars automatically slow down and stop level at floors in response to car and
landing calls, with stops made in sequence in the established direction of
travel, regardless of order in which buttons are pressed.
• Landing calls are canceled when the assigned car arrives at the landing.
• Automatic Dispatch Failure: Provide auxiliary dispatch system to automatically
dispatch elevators in the event of failure of the primary control system.
• Hall Call Button Failure: Should failure of hall call button system occur, initiate
operation providing predetermined service to all landings; elevators respond
normally to car calls.
• Automatic Leveling:
• When arriving at a floor cars level to within 1/8” above or below the landing
sill prior to opening doors, without travelling past the landing during leveling
• Maintain leveling accuracy regardless of carload, direction of travel, rope
slippage, or stretch.
Door Operation:
Passenger Elevators:
• Automatically open doors when car arrives at a floor.
• Stop and reopen doors or hold doors in open position upon activation of “door
open” button.
• At expiration of normal dwell time, or upon activation of “door close” button,
close doors:
• Prevent doors from closing and reverse doors at normal opening speed if door
reopening device beams are obstructed while doors are closing, except during
nudging operation.
• In event of door reopening device failure, provide for automatic shutdown of
car at floor level with doors open
• Close cycle does not begin upon activation of “door close” button until normal
door dwell time for a car or hall call has expired, except firefighters’ operation.
• Nudging Operation:
• After beams of door reopening device are obstructed for a predetermined
time interval (minimum 20.0-25.0 seconds), sound warning signal, and attempt
to close doors with maximum of 2.5 foot-pounds kinetic energy.
• Activation of the door open button overrides nudging operation and reopens
doors.
• Interrupted Beam Time:
• When beams are interrupted during initial door opening, hold door open a
minimum of 3.0 seconds.Bid Event #145SP - Page 16 of 28
Section 7.0 Bid Specifications: continued
• When beams are interrupted after the initial 3.0 second hold open time,
reduce time doors remain open to an adjustable time of approximately 1.0 1.5
seconds after beams are reestablished.
• Differential Door Time:
• Field adjustable time that doors remain open after stopping in response to
calls.
• Car Call: Hold open time adjustable between 3.0 and 5.0 seconds.
• Hall Call: Hold open time adjustable between 5.0 and 8.0 seconds.
• Use hall call time when car responds to coincidental calls.
• Reopen doors when car is designated for loading.
• Independent Service.
• When feature is activated from within the car allow control of car only from
buttons and controls inside the car.
• Close doors by constant pressure on desired destination floor button or door
close button.
• Selective Collective Operation, Single Cars, Car(s) #1 and #2:
• Elevators operate via momentary pressure buttons to:
• Place hall call by selecting direction of travel at each hall landing (up and down
buttons at each intermediate landing, single buttons at each terminal landing).
• Place car call by selecting destination floor from inside the car (individual
buttons for each floor served).
• Hall calls, other than calls placed at the landing at which car is standing, start
car, and cause the car to stop at first landing for which a call is registered in
the direction of travel.
• Stops are made in order in which landings are reached, irrespective of
sequence in which calls are registered.
• Parked Car (No Demand):
• When feature is enabled, elevator remains at landing of last assignment (if no
further demand) with doors closed, for a predetermined amount of time
(programmable for any amount of time). Upon expiration of time, the elevator
returns to the main egress landing with the doors closed.
• If feature is disabled, if no further demand, the elevator remains at landing of
last assignment with the doors closed until
- Segment
- 72000000
- Enriched
- Yes
- Open Date
- 09/29/2026 2:00:00 PM CT
- Bid Number
- JPP-BidEvent#145
- Date Issued
- 09/02/2026
- Categorized By
- llm