The MacArthur Lake Rehabilitation Project will capture, store, and treat stormwater to offset potable water used to fill the lake. The project improvements include installing a diversion structure, a primary treatment unit, pump well, several feet of reinforced concrete pipe, ductile iron pipe, a secondary stormwater treatment unit, valve and meter vaults, several maintenance holes, a new cascading water feature with retaining walls, sidewalk and walkway reconstruction, and pump house upgrades, including electrical and instrumentation systems. Improvements will be constructed both within MacArthur Park and the City Public Right of Way within the surrounding vicinity. ▬
● See bid package for full scope & details
●● Bid package only on RAMPLA- download Part 1 to be a planholder
● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Source: City of Los Angeles RAMP (bid LA_RAMP-230903), retrieved via the City of Los Angeles. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →