RFB-81-27 DMA BNGC USPFO Roof Restoration
Category: CON. Type: Request for Bids (RFB). Agency: Facilities & Support Services. Documents: Final_RFB_785_2700000121_1_SO_FORM.PDF — Assembled pdf file for document [RFB,785,2700000121,1] - Solicitation Printer
The goal of this project is to remove the existing roof system down to the existing roof deck and install a new Two-Ply SBS Modified Bitumen roof system. The new roof system is a Two-Ply SBS Modified Bitumen in cold adhesive over cover board over rigid board insulation system. The first layer of insulation will be mechanically fastened. Additional layers and coverboard will be set-in two-part foam adhesive. All existing prefinished metal coping caps, gutters, scupper collector heads, downspouts, roof drains, metal roof splashes, flashings, accessories, and terminations will be removed and replaced with new components.
We post new roofing opportunities in Kentucky as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Kentucky work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Facilities & Support Services (solicitation RFB-785-2700000121-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.