Light RFP
Houston · Houston, TX

On-Call Services for Wastewater Collection System Rehabilitation and Renewal

Due Jul 30, 2026·2 days left·PlumbingView official posting ↗
Issuing agency
Houston Public Works
Method
IFB
Category
CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES; Pipe Bursting; Sewer/Drainage Construction/Rehabilitation; Sewer Repair/Rehabilitation; Wastewater Construction; Liner Sewer/Construction
PIN
CB-2026-0048
Location
Houston, TX
Posted
Jul 3, 2026
Takeaways by LightRFP AI
  • The City of Houston is soliciting bids for on-call wastewater collection system rehabilitation and renewal services.
  • The estimated cost is $4,300,000.00.
  • Bids are due by July 30, 2026.
  • The procurement method is IFB (Invitation for Bids).
  • The place of performance is Houston, TX.
  • Requirement: A bid bond is required, as evidenced by the required form '00430 - Bidders Bond.pdf'.

AI-generated, verify all details against the official documents.

Description

$4,300,000.00

The City of Houston (“City”) is soliciting bids from qualified bidders to provide On-Call Services for Wastewater Collection System Rehabilitation and Renewal. This project includes but is not limited to rehabilitation and replacement of portions of the sanitary sewer system, including point repairs, sewer replacement, service lateral repairs, sliplining, pipe bursting, slurry boring, and service reconnections. The work also includes cleaning and televising sanitary sewers, installation and rehabilitation of manholes, pavement

For information related to bid opening, please visit the following link: Strategic Procurement Division's Bid Opening

Contact

Name
Elvia Fernandez
Phone
(754) 233-0309‬
Address
Houston, TX
Full source recordfrom City of Houston
Id
591b9024-918d-4e15-8871-85d19f407547
Ebid
Eforms
Id
17c3a8cd-fff1-4aa9-8e2d-a84c7e8690aa
Name
Submission Requirements
Tags
CMAR, DBPW, DB, CSP, CB
Type
questionnaire_form
Questions
{"type":"document-upload","prompt":"Required forms listed within the CB to be included with the bid.","required":true,"attachments":[{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058342227_62367a5a-65e5-4155-baa7-5a8ed1899c08/00430-BiddersBond.pdf","name":"00430 - Bidders Bond.pdf","type":"application/pdf","bytes":112449,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:19:03.348Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058351513_fd78b119-093a-4ae6-87b0-a3080045c06e/00470-BiddersMWSBEParticipationPlan.pdf","name":"00470 - Bidder's MWSBE Participation Plan.pdf","type":"application/pdf","bytes":271823,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:19:12.220Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058359999_4c0d79d8-21e0-4841-8480-14aa493fc0bf/00471-Pre-BidGoodFaithEfforts.pdf","name":"00471 - Pre-Bid Good Faith Efforts.pdf","type":"application/pdf","bytes":280520,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:19:22.049Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058365786_18579132-7507-4db5-b100-e1704b974dcf/00472-GoalDeviationRequest.pdf","name":"00472 - Goal Deviation Request.pdf","type":"application/pdf","bytes":204522,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:19:26.521Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171181789_92284a49-82de-4ec2-b45d-76b751d84f5a/00604-HistoryofOSHAActionsandListofOn-The-Job-Injuries.doc","name":"00604 - History of OSHA Actions and List of On-The-Job-Injuries.doc","type":"application/msword","bytes":28160,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:22.734Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171181978_80e18c29-9e22-43fe-84fa-a27e4d6fef15/ExhibitI-OfferandSubmittalReferencesCB.docx","name":"Exhibit I - Offer and Submittal, References (CB).docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":20683,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:22.741Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1781619892143_3b56e8b3-7e21-4bcf-b27e-92df12c8e1d7/ExhibitII-HireHoustonFirst.docx","name":"Exhibit II - Hire Houston First.docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":29621,"bucket":"documents.beaconbid.com","createdAt":"2026-06-16T14:24:52.643Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171196315_e40acb78-90a4-439a-b028-0c4abfc6381c/ExhibitIII-OwnershipInformationForm.docx","name":"Exhibit III - Ownership Information Form.docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":56768,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:36.752Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171203842_37f444f2-24c1-4dfd-abe5-caf56562cd8c/ExhibitIV-Anti-CollusionStatementCB.docx","name":"Exhibit IV - Anti-Collusion Statement (CB).docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":22087,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:44.374Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171210369_6b3dd238-8917-4eda-9ba3-4efa085b393f/ExhibitV-ConflictofInterestQuestionnaire.pdf","name":"Exhibit V - Conflict of Interest Questionnaire.pdf","type":"application/pdf","bytes":61154,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:51.126Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778171210561_5373500f-363d-45e4-bef0-731cecbb4728/Pay-or-PlayPOP1.pdf","name":"Pay-or-Play (POP) 1.pdf","type":"application/pdf","bytes":99812,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T16:26:51.165Z","documentSource":"s3"}]}
Id
07e0c613-1865-433a-94c5-409be184c28f
Name
Line Items - Construction
Type
lineitems_form
Line Items
{"id":"f943e726-03bc-4d31-8eab-0d7e36759d9e","name":"Traffic Control Mobilization and Demobilization, if sealed traffic control plan required","notes":"01555","details":"","quantity":"6","quantityType":"EACH"}
{"name":"Sealed Traffic Control Plan (By Request/Approval of Project Manager)","notes":"01555","quantity":"4","quantityType":"EACH"}
{"name":"\"Traffic Control - one lane closure, complete in\r\nplace (daily) if sealed traffic control plan required\"","notes":"01555","quantity":"4","quantityType":"DAY"}
{"name":"\"Traffic Control - one lane closure, complete in\r\nplace (weekly) if sealed traffic control plan required\"","notes":"01555","quantity":"2","quantityType":"WK"}
{"name":"\"Traffic Control - one lane closure, complete in\r\nplace (monthly) if sealed traffic control plan required\"","notes":"01555","quantity":"1","quantityType":"MTH"}
{"name":"\"Traffic Control - two lane closure, complete in\r\nplace (daily) if sealed traffic control plan required\"","notes":"01555","quantity":"4","quantityType":"DAY"}
{"name":"\"Traffic Control - two lane closure, complete in\r\nplace (weekly) if selaed traffic control plan required\"","notes":"01555","quantity":"2","quantityType":"WK"}
{"name":"\"Traffic Control - two lane closure, complete in\r\nplace (monthly) if sealed traffic control plan required\"","notes":"01555","quantity":"1","quantityType":"MTH"}
{"name":"\"Traffic Control - one lane closure, complete in\r\nplace for Major Thoroughfare (daily)\"","notes":"01555","quantity":"4","quantityType":"DAY"}
{"name":"\"Traffic Control - one lane closure, complete in\r\nplace for Major Thoroughfare (weekly)\"","notes":"01555","quantity":"2","quantityType":"WK"}
{"name":"\"Traffic Control - typical one lane closure, complete in\r\nplace for Major Thoroughfare (monthly)\"","notes":"01555","quantity":"1","quantityType":"MTH"}
{"name":"\"Traffic Control - typical two lane closure, complete in\r\nplace for Major Thoroughfare (daily)\"","notes":"01555","quantity":"4","quantityType":"DAY"}
{"name":"\"Traffic Control - typical two lane closure, complete in\r\nplace for Major Thoroughfare (weekly)\"","notes":"01555","quantity":"2","quantityType":"WK"}
{"name":"\"Traffic Control - typical two lane closure, complete in\r\nplace for Major Thoroughfare (monthly)\"","notes":"01555","quantity":"1","quantityType":"MTH"}
{"name":"Flagmen For Traffic Control (Uniformed Peace Officer)","notes":"01555","quantity":"400","quantityType":"HOUR"}
{"name":"Certified Flagmen For Traffic Control (Not a Peace Officer)","notes":"01555","quantity":"400","quantityType":"HOUR"}
{"name":"Install Traffic Loop Detector (Concrete and Asphalt Surface)","notes":"01555","quantity":"90","quantityType":"L.F."}
{"name":"Extensive Traffic Control Coordination (TX DOT, UPRR, etc)","notes":"01555","quantity":"3","quantityType":"EACH"}
{"name":"6\" X 6\" Diversion Pumping Setup (Up to 500 ft of pipe)","notes":"01506","quantity":"4","quantityType":"SET-UP"}
{"name":"6\" X 6\" Pump Operation & Monitoring","notes":"01506","quantity":"250","quantityType":"HOUR"}
{"name":"6\" X 6\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"12","quantityType":"DAY"}
{"name":"8\" X 8\" Diversion Pumping Setup (Up to 500 ft)","notes":"01506","quantity":"2","quantityType":"SET-UP"}
{"name":"8\" X 8\" Pump Operation & Monitoring","notes":"01506","quantity":"200","quantityType":"HOUR"}
{"name":"8\" X 8\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"10","quantityType":"DAY"}
{"name":"10\" X 10\" Diversion Pumping Setup (Up to 500 ft)","notes":"01506","quantity":"1","quantityType":"SET-UP"}
{"name":"10\" X 10\" Pump Operation & Monitoring","notes":"01506","quantity":"100","quantityType":"HOUR"}
{"name":"10\" X 10\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"5","quantityType":"DAY"}
{"name":"12\" X 12\" Diversion Pumping Setup (Up to 500 ft of pipe)","notes":"01506","quantity":"2","quantityType":"SET-UP"}
{"name":"12\" X 12\" Pump Operation & Monitoring","notes":"01506","quantity":"200","quantityType":"HOUR"}
{"name":"12\" X 12\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"10","quantityType":"DAY"}
{"name":"14\" X 14\" Diversion Pumping Setup (Up to 500 ft of pipe)","notes":"01506","quantity":"1","quantityType":"SET-UP"}
{"name":"14\" X 14\" Pump Operation & Monitoring","notes":"01506","quantity":"100","quantityType":"HOUR"}
{"name":"14\" X 14\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"5","quantityType":"DAY"}
{"name":"16\" X 16\" Diversion Pumping Setup (Up to 500 ft of pipe)","notes":"01506","quantity":"1","quantityType":"SET-UP"}
{"name":"16\" X 16\" Pump Operation & Monitoring","notes":"01506","quantity":"100","quantityType":"HOUR"}
{"name":"16\" X 16\" Pump and Piping (for every day in operation)","notes":"01506","quantity":"5","quantityType":"DAY"}
{"name":"6\"-12\" Additional Pumping Setup (over 500 ft of pipe), including connections, installation and removal","notes":"01506","quantity":"1000","quantityType":"L.F."}
{"name":"Over 12\" Additional Pumping Setup (over 500 ft of pipe), including connections, installation and removal","notes":"01506","quantity":"100","quantityType":"L.F."}
{"name":"Bypass Piping for 6-10\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"50","quantityType":"L.F."}
{"name":"Bypass Piping for 12\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"50","quantityType":"L.F."}
{"name":"Bypass Piping for 16\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"50","quantityType":"L.F."}
{"name":"Bypass Piping for 20\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"25","quantityType":"L.F."}
{"name":"Bypass Piping for 24\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"25","quantityType":"L.F."}
{"name":"Bypass Piping for 26\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"25","quantityType":"L.F."}
{"name":"Bypass Piping for 30\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"25","quantityType":"L.F."}
{"name":"Bypass Piping for 36\" Sanitary Sewer Force Main (including connections, installation and removal)","notes":"01506","quantity":"25","quantityType":"L.F."}
{"name":"Cleaning 6\"-10\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"10000","quantityType":"L.F."}
{"name":"Cleaning 12\"-15\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"8000","quantityType":"L.F."}
{"name":"Cleaning 12\"-15\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Cleaning 16\"-24\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"2500","quantityType":"L.F."}
{"name":"Cleaning 16\"-24\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Cleaning 26\"-30\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"250","quantityType":"L.F."}
{"name":"Cleaning 26\"-30\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Cleaning 33\"-48\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"500","quantityType":"L.F."}
{"name":"Cleaning 33\"-36\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 6\"-10\" Sewer, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 12\"-15\" Sewer, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 12\"-15\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 16\"-24\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 26\"-30\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Mechanical Cleaning 33\"-36\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"Debris Collection, Removal, Transportation and Disposal","notes":"02558","quantity":"25","quantityType":"WET TON"}
{"name":"Vactor Assistant (When Approved by Project Manager)","notes":"02558","quantity":"80","quantityType":"HR"}
{"name":"TV Inspection 6\"-10\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"20,000","quantityType":"L.F."}
{"name":"TV Inspection 12\"-15\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"15,000","quantityType":"L.F."}
{"name":"TV Inspection 12\"-15\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"TV Inspection 16\"-24\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"5,000","quantityType":"L.F."}
{"name":"TV Inspection 16\"-24\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"TV Inspection 26\"-30\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"250","quantityType":"L.F."}
{"name":"TV Inspection 26\"-30\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"TV Inspection 33\"-48\" Gravity Sanitary Sewer, All Depths","notes":"02558","quantity":"500","quantityType":"L.F."}
{"name":"TV Inspection 33\"-36\" Sanitary Sewer Force Main, All Depths","notes":"02558","quantity":"50","quantityType":"L.F."}
{"name":"TV Inspection with Dye Water Extra, in Addition to TV as Above","notes":"02558","quantity":"250","quantityType":"L.F."}
{"name":"Investigative Cleaning and TV Inspection of Sewers, All Sizes, All Depths (When approved by Project Manager)","notes":"02558","quantity":"80","quantityType":"HR"}
{"name":"Sewer Investigation (when approved by Project Manager)","notes":"02531","quantity":"40","quantityType":"HOUR"}
{"name":"Well Pointing/Dewatering System, All Sizes, All Depths, with 10' Min. Length Set Up","notes":"01578","quantity":"5","quantityType":"EACH"}
{"name":"Eductor Dewatering System (includes plan, setup, and demobilization for up to 2 well points) (Shall only be used when approved by Project Manager)","notes":"01578","quantity":"2","quantityType":"EACH"}
{"name":"Additional Eductor Dewatering (Shall only be used when approved by Project Manager)","notes":"01578","quantity":"5","quantityType":"EACH"}
{"name":"Critical Locate - Vacuum Excavation/Hydro Excavation (includes equipment, disposal of debris, labor, and backfill)*(Minimun 4 hours per location)(When Approved by Project Manager)","notes":"02317","quantity":"40","quantityType":"HR"}
{"name":"Special Excavation around Utilities and Structures By Hand (When Approved by Project Manager)","notes":"02318","quantity":"70","quantityType":"C.Y."}
{"name":"\"Hand Excavation for Point Repair/Obstruction Removal, All Sizes, (When\r\nApproved by Project Manager)\"","notes":"02553","quantity":"50","quantityType":"C.Y."}
{"name":"Hand Excavated Entry/Exit Pits, Up to 8' Depth (When Approved by Project Manager)","notes":"02571","quantity":"4","quantityType":"EACH"}
{"name":"Hand Excavated Entry/Exit Pits, 8' to 15' Depth (When Approved by Project Manager)","notes":"02571","quantity":"2","quantityType":"EACH"}
{"name":"Cement Stabilized Sand Backfill (1.64 Tons / C.Y.)","notes":"02321","quantity":"700","quantityType":"TON"}
{"name":"Trench Safety System from 5' up to 8' Depth ","notes":"02260","quantity":"1000","quantityType":"L.F."}
{"name":"Trench Safety System from 8' up to 15' Depth ","notes":"02260","quantity":"200","quantityType":"L.F."}
{"name":"Trench Safety System from 15' up to 20' Depth ","notes":"02260","quantity":"100","quantityType":"L.F."}
{"name":"Trench Safety System over 20' Depth ","notes":"02260","quantity":"50","quantityType":"L.F."}
{"name":"Shaft (up to 14-ft Diameter), designed and sealed by Engineer","notes":"02400","quantity":"8","quantityType":"V.F."}
{"name":"Shaft (up to 16-ft Diameter), designed and selaed by Engineer","notes":"02400","quantity":"8","quantityType":"V.F."}
{"name":"Shaft (up to 20-ft Diameter), designed and selaed by Engineer","notes":"02400","quantity":"8","quantityType":"V.F."}
{"name":"Shaft (up to 24-ft Diameter), designed and sealed by Engineer","notes":"02400","quantity":"8","quantityType":"V.F."}
{"name":"Obstruction Removal by Excavation, All Sizes, Up to 10' Depth ","notes":"02553","quantity":"20","quantityType":"EACH"}
{"name":"Obstruction Removal by Excavation, All Sizes, Over 10' Depth ","notes":"02553","quantity":"20","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 6\"-10\", Up to 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":" Sanitary Sewer Force Main Point Repair, 6\"-10\", Over 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 12\"-16\", Up to 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 12\"-16\", Over 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 18\"-24\", Up to 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 18\"-24\", Over 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 26\"- 30\", Up to 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 26\"- 30\", Over 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 30\" and above, Up to 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Point Repair, 30\" and above, Over 10' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 6\"-10\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":" Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 6\"-10\", Over 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 12\"-16\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 12\"-16\", Over 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 18\"-24\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 18\"-24\", Over 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 26\"- 30\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 26\"- 30\", Over 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 30\" and above, Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sanitary Sewer Force Main Pipe Replacement Beyond Point Repair, 30\" and above, Over 10' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Remove and Replace Up to 2\" Combination Air Valve on Force Main","notes":"02524","quantity":"1","quantityType":"EACH"}
{"name":"Remove and Replace Up to 2\" Air Release Valve on Force Main","notes":"02524","quantity":"1","quantityType":"EACH"}
{"name":"Remove and Replace 3\"- 4\" Combination Air Valve on Force Main","notes":"02524","quantity":"1","quantityType":"EACH"}
{"name":"Remove and Replace 3\"- 4\" Air Release Valve on Force Main","notes":"02524","quantity":"1","quantityType":"EACH"}
{"name":"Sewer Point Repair 6\"-10\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 6\"-10\", Up to 10' Depth","notes":"02553","quantity":"10","quantityType":"L.F."}
{"name":"Sewer Point Repair 6\"-10\", 10' to 15' Depth ","notes":"02553","quantity":"10","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 6\"-10\", 10' to 15' Depth","notes":"02553","quantity":"50","quantityType":"L.F."}
{"name":"Sewer Point Repair 6\"-10\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 6\"-10\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 12\"-15\", Up to 10' Depth","notes":"02553","quantity":"5","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 12\"-15\", Up to 10' Depth","notes":"02553","quantity":"10","quantityType":"L.F."}
{"name":"Sewer Point Repair 12\"-15\", 10' to 15' Depth","notes":"02553","quantity":"10","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 12\"-15\", 10' to 15' Depth","notes":"02553","quantity":"50","quantityType":"L.F."}
{"name":"Sewer Point Repair 12\"-15\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 12\"-15\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 16\" - 24\", Up to 10' Depth","notes":"02553","quantity":"3","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 16\"-24\", Up to 10' Depth","notes":"02553","quantity":"15","quantityType":"L.F."}
{"name":"Sewer Point Repair 16\"-24\", 10' to 15' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 16\"-24\", 10' to 15' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 16\" - 24\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 16\"-24\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 27\"-30\", Up to 15' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 27\"-30\", Up to 15' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 27\"-30\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 27\"-30\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 33\" -36\", Up to 15' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 33\"-36\", Up to 15' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 33\"-36\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 33\"-36\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 42\", Up to 15' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 42\", Up to 15' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 42\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 42\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 48\", Up to 15' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 48\", Up to 15' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Sewer Point Repair 48\", 15' to 20' Depth","notes":"02553","quantity":"1","quantityType":"EACH"}
{"name":"Pipe Replacement Beyond Point Repair 48\", 15' to 20' Depth","notes":"02553","quantity":"5","quantityType":"L.F."}
{"name":"Abandonment of Point Repairs, All Sizes, All Depths","notes":"02553","quantity":"5","quantityType":"EACH"}
{"name":"Extra Cost for Material for Point Repair on PEP Pipe, All Sizes, All Depths","notes":"02553","quantity":"15","quantityType":"EACH"}
{"name":"Sliplining 8\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 10\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 12\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 15\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 18\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 20\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 22\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Sliplining 24\" Sewer All Depths, SDR 21","notes":"02550","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 6\" Sewer to 7.125\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 6\"-8\" Sewer to 8.625\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 8\"-10\" Sewer to 10.75\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 8\" Sewer to 12.75\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 10\"-12\" Sewer to 12.75\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 12\"-15\" Sewer to 16.0\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Pipe Bursting 15\"-18\" Sewer to 20.0\" OD, SDR 19, Up to 15' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Static Pipe Bursting 6-8\" Sewer to 8.625 OD HDPE or 8\" PVC, Up to 20' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Static Pipe Bursting 8-10\" Sewer to 10.75\" OD HDPE or 10\" PVC, Up to 20' Depth","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Static Pipe Bursting 10-12\" Sewer to 12.75\" OD HDPE or 12\" PVC, Up to 20' Depth","notes":"02571","quantity":"200","quantityType":"L.F."}
{"name":"Static Pipe Bursting 12-15\" Sewer to 16\" OD HDPE or 15\" PVC, Up to 20' Depth","notes":"02571","quantity":"200","quantityType":"L.F."}
{"name":"Static Pipe Bursting 15-18\" Sewer to 20\" OD HDPE or 18\" PVC, Up to 20' Depth","notes":"02571","quantity":"200","quantityType":"L.F."}
{"name":"Cut or Remove Existing Liners From the Host Pipe Prior to Pipe Bursting, All Sizes, All Depths ","notes":"02571","quantity":"250","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 8\" Sewer, Up to 15' Depth, 6.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 10\" Sewer, Up to 15' Depth, 6.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 12\" Sewer, Up to 15' Depth, 7.5mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 15\" Sewer, Up to 15' Depth, 9.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 18\" Sewer, Up to 15' Depth, 12.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 21\" Sewer, Up to 20' Depth, 15.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 24\" Sewer, Up to 20' Depth, 16.5mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 30\" Sewer, Up to 20' Depth, 21.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 33\"-36\" Sewer, Up to 20' Depth, 24.0mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 42\" Sewer, Up to 20' Depth, 31.5mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Cured-In-Place Pipe 48\" Sewer, Up to 25' Depth, 40.5mm thick","notes":"02556","quantity":"100","quantityType":"L.F."}
{"name":"Slurry Boring of 8\" Sewer, Up to 15' Depth","notes":"02448","quantity":"150","quantityType":"L.F."}
{"name":"Slurry Boring of 10\" Sewer, Up to 15' Depth","notes":"02448","quantity":"150","quantityType":"L.F."}
{"name":"Slurry Boring of 12\" Sewer, Up to 15' Depth","notes":"02448","quantity":"150","quantityType":"L.F."}
{"name":"Slurry Boring of 4\" Service Lateral, Up to 15' Depth","notes":"02448","quantity":"20","quantityType":"L.F."}
{"name":"Slurry Boring of 6\" Service Lateral, Up to 15' Depth","notes":"02448","quantity":"20","quantityType":"L.F."}
{"name":"Remove and Replace of Sanitary Sewer from Manhole to Manhole by Open Cut, 6\" to 8\", up to 15' Depth","notes":"02531","quantity":"250","quantityType":"L.F."}
{"name":"Remove and Replace of Sanitary Sewer from Manhole to Manhole by Open Cut, 10\" to 12\", up to 15' Depth","notes":"02531","quantity":"250","quantityType":"L.F."}
{"name":"Reconnect Service Connection by Excavation Including Stack to Liner, Complete, All Sizes, Up to 10' Depth","notes":"02534","quantity":"25","quantityType":"EACH"}
{"name":"Reconnect Service Connection by Excavation Including Stack to Liner, Complete, All Sizes, Over 10' Depth","notes":"02534","quantity":"25","quantityType":"EACH"}
{"name":"Reconnect Service Connection by Remote, Complete, All Sizes, All Depths, as Approved","notes":"02534","quantity":"10","quantityType":"EACH"}
{"name":"Reconnect Service Connection by Hand Excavation Including Stack to Liner, Complete, All Sizes, Up to 8' Depth (When approved by Project Manager)","notes":"02534","quantity":"8","quantityType":"EACH"}
{"name":"Reconnect Service Connection by Hand Excavation Including Stack to Liner, Complete, All Sizes, 8' to 15' Depth (When Approved by Project Manager)","notes":"02534","quantity":"4","quantityType":"EACH"}
{"name":"Service Lateral Repair or Replacement up to 8‘ from Centerline of Main (service lateral defect, no work required on main)","notes":"02534","quantity":"40","quantityType":"EACH"}
{"name":"Service Lateral Repair or Replacement beyond 8‘ from Centerline of Main ","notes":"02534","quantity":"200","quantityType":"L.F."}
{"name":"Sliplining of Existing Service Line","notes":"02534","quantity":"200","quantityType":"L.F."}
{"name":"Pipe Bursting of 4\"-6\" Service Lateral","notes":"02534","quantity":"30","quantityType":"L.F."}
{"name":"Sanitary Sewer Cleanout per Standard 12-Inch Cleanout Detail on Service Lateral ","notes":"02534","quantity":"15","quantityType":"EACH"}
{"name":"Sanitary Sewer Cleanout per Standard 8-Inch Cleanout Detail on Service Lateral ","notes":"02534","quantity":"5","quantityType":"EACH"}
{"name":"Sanitary Sewer Cleanout per Standard 6-Inch Cleanout Detail on Service Lateral (Residential)","notes":"02534","quantity":"30","quantityType":"EACH"}
{"name":"Sanitary Sewer Cleanout per Standard 4-Inch Cleanout Detail on Service Lateral (For Single Family Residence Only)","notes":"02534","quantity":"45","quantityType":"EACH"}
{"name":"Adjust/Reset Manhole with New Frame and Cover Up to One Foot","notes":"02555","quantity":"20","quantityType":"EACH"}
{"name":"Adjust/Reset Manhole with Existing Frame and Cover Up to One Foot","notes":"02555","quantity":"20","quantityType":"EACH"}
{"name":"Adjust/Reset Manhole, Excess Over One Foot","notes":"02555","quantity":"10","quantityType":"V.F."}
{"name":"Raise Existing Manhole (per Manhole Detail-1)","notes":"02555","quantity":"10","quantityType":"V.F."}
{"name":"Rehabilitation of Manhole by 1\" Thick Concrete Liner Approved Mix Design (Including Bench Work)","notes":"02555","quantity":"150","quantityType":"V.F."}
{"name":"Set-up for Chemical Grouting of Manhole","notes":"02555","quantity":"2","quantityType":"EACH"}
{"name":"Chemical Grouting of Manhole","notes":"02555","quantity":"10","quantityType":"GALLON"}
{"name":"Manhole Inserts (Stainless Steel)","notes":"02555","quantity":"15","quantityType":"EACH"}
{"name":"Rehabilitation of Manhole Benches and Inverts per Manhole Detail-2 (only when constructed without wall lining)","notes":"02555","quantity":"10","quantityType":"EACH"}
{"name":"Remove and Replace or Install New Std. Manhole, 5' to 8' Depth, With All Joints & Connections (Pre-Cast Concrete) ","notes":"02082","quantity":"2","quantityType":"EACH"}
{"name":"Remove and Replace or Install New Std. Fiberglass Manhole, 5' to 8' Depth","notes":"02083","quantity":"2","quantityType":"EACH"}
{"name":"Extra Depth for New or Replacement Std. Manhole, Over 8 Feet Depth (Pre-Cast Concrete or Fiberglass)","notes":"02082, 02083","quantity":"10","quantityType":"V.F."}
{"name":"Install Shallow Manhole, Less than 5' Depth, With All Joints & Connections (Pre-Cast Concrete or Fiberglass)","notes":"02082, 02083","quantity":"2","quantityType":"EACH"}
{"name":"Additional Manhole Base in Wet (Unstable) Sand With Piles as Per Detail","notes":"02082","quantity":"3","quantityType":"EACH"}
{"name":"Remove and Replace or Install New 4-foot diameter Pre-Cast Concrete Manhole on MRC Sanitary Sewers, Up to 8' Depth (measured to the crown of MRC)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Extra Depth for New or Replacement 4-foot diameter Pre-Cast Concrete Manhole on MRC Sanitary Sewers, Over 8 Feet Depth (Measured to the crown of MRC)","notes":"02082","quantity":"10","quantityType":"V.F."}
{"name":"Remove and Replace or Install New 5-foot diameter Pre-Cast Concrete Manhole on MRC Sanitary Sewers, Up to 8' Depth (measured to the crown of MRC)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Extra Depth for New or Replacement 5-foot diameter Pre-Cast Concrete Manhole on MRC Sanitary Sewers, Over 8 Feet Depth (Measured to the crown of MRC)","notes":"02082","quantity":"10","quantityType":"V.F."}
{"name":"Remove and Replace or Install New 4-foot diameter Fiberglass Manhole on MRC Sanitary Sewers, All Depths","notes":"02083","quantity":"1","quantityType":"EACH"}
{"name":"Remove and Replace or Install New 4'-6\" diameter Fiberglass Manhole on MRC Sanitary Sewers, All Depths ","notes":"02083","quantity":"1","quantityType":"EACH"}
{"name":"Remove and Replace or Install New 5-foot diameter Manhole on Sanitary Sewer Junction Box, Up to 8' Depth (measured to the top slab of the Junction Box)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Extra Depth for New or Replacement 5-foot diameter Manhole on MRC Sanitary Sewers or Junction Box, Over 8 Feet Depth","notes":"02082","quantity":"10","quantityType":"V.F."}
{"name":"Install 4-foot Diameter Air Release Valve Manhole, Up to 8' Depth (including valve and pipe fittings)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Install 6-foot Diameter Air Release Valve Manhole, Up to 8' Depth (including valve and pipe fittings)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Install 8-foot Diameter Air Release Valve Manhole, Up to 8' Depth (including valve and pipe fittings)","notes":"02082","quantity":"1","quantityType":"EACH"}
{"name":"Removal and Replacement of 4-1/2\" Concrete Sidewalk Incl. Reinforcement","notes":"02775","quantity":"200","quantityType":"S.Y."}
{"name":"Removal and Replacement of 6\" Concrete Driveway Incl. Reinforcement","notes":"02754","quantity":"200","quantityType":"S.Y."}
{"name":"Removal and Replacement of 8\" Concrete Pavement Incl. Reinforcement","notes":"02751, 02951","quantity":"450","quantityType":"S.Y."}
{"name":"Removal and Replacement of 8” to 10” Concrete Slab using 5000 psi High Early Strength Concrete, Incl. Expansion Joints, and Adjustments/Repairs of Inlets, Manholes and Water Valves as needed","notes":"02221, 02751","quantity":"60","quantityType":"C.Y."}
{"name":"Removal and Replacement of Up to 2\" Hot-Mix Asphaltic Concrete (Type D), Including Tack Coat","notes":"02741, 02951","quantity":"400","quantityType":"S.Y."}
{"name":"Removal and Replacement of Semi-Rigid Base (or Approved Alternative)","notes":"02711","quantity":"350","quantityType":"S.Y."}
{"name":"Saw Joint (Not with Jack Hammer) Of Concrete/Asphalt Pavement, All Depths, As Needed","notes":"02752","quantity":"2000","quantityType":"L.F."}
{"name":"Removal and Replacement of Concrete Curb and Gutter","notes":"02771","quantity":"200","quantityType":"L.F."}
{"name":"Reinforced Colored Concrete Curb Ramps with Truncated Domes","notes":"02775","quantity":"36","quantityType":"S.F."}
{"name":"Tree Removal (up to 5\" diameter)","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Tree Removal (5- 10\" diameter)","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Tree Removal (10\"-30\" diameter)","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Tree Removal (over 30\" diameter)","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Tree Planting All types (up to 4\")","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Tree Planting All Types (over 4\" to 8\")","notes":"02915","quantity":"1","quantityType":"EACH"}
{"name":"Removal and Replacement of Wooden Or Chain Link Fence, All Heights. With All New Materials, Approved Lengths","notes":"02821","quantity":"500","quantityType":"L.F."}
{"name":"Abandonment of Sanitary Sewers (Grout not to exceed theoretical volume of sewer by 50%)","notes":"02222","quantity":"100","quantityType":"C.F."}
{"name":"Extra Length Well Pointing / Dewatering System (All Depths in addition to Setup)","notes":"01578","quantity":"250","quantityType":"L.F."}
{"name":"Extra Excavation By Machine","notes":"02318","quantity":"150","quantityType":"C.Y."}
{"name":"Extra Excavation By Machine Removing Cement Stabilized Sand/Concrete Encased Services","notes":"02318","quantity":"20","quantityType":"C.Y."}
{"name":"Extra Concrete, 4,000 psi With or Without Reinforcement","notes":"03315","quantity":"65","quantityType":"C.Y."}
{"name":"Extra Asphalt Beyond 2\" Thickness","notes":"02741","quantity":"15","quantityType":"C.Y."}
Column State
{"colId":"name"}
{"colId":"notes","headerName":"ID"}
{"colId":"details","hidden":true}
{"colId":"quantityType"}
{"colId":"quantity"}
{"colId":"estimatedValue","hidden":true}
{"colId":"response.unitPrice"}
{"colId":"response.markupPercent","hidden":true}
{"colId":"response.notes"}
{"colId":"response.nobid","hidden":true}
Id
20c458f5-1e06-4b26-800b-399e1a738fcb
Name
Fixed Price
Type
lineitems_form
Line Items
{"id":"4062dca3-8e37-4e15-b7d3-3538720aad74","name":"Mobilization for small Pipe Bursting or CIPP work order (<1,000’)","notes":"01502","details":"","quantity":"7","quantityType":"EACH","estimatedValue":" $1,500.00 "}
{"name":"Emergency/After Hour Response (Onsite within 0-4 hours, mobilization within 12 hours when requested/approved by Project Manager)","notes":"01502","quantity":"3","quantityType":"EACH","estimatedValue":" $6,000.00 "}
{"name":"Mobilization for Kingwood Work Orders","notes":"01502","quantity":"11","quantityType":"EACH","estimatedValue":" $2,500.00 "}
{"name":"Mobilization, Same Day, Working Hours (M-F, 7:00AM-5:00PM), when directed/approved by Project Manager","notes":"01502","quantity":"14","quantityType":"EACH","estimatedValue":" $1,200.00 "}
{"name":"Mobilization, Same Day, Non-Working Hours, when directed/approved by Project Manager","notes":"01502","quantity":"14","quantityType":"EACH","estimatedValue":" $1,600.00 "}
{"name":"Mobilization, 2 - 4 Days Working Hours (M-F, 7:00AM-5:00PM), when directed/approved by Project Manager","notes":"01502","quantity":"18","quantityType":"EACH","estimatedValue":" $800.00 "}
{"name":"Mobilization, 2 - 4 Days, Holiday, when directed/approved by Project Manager","notes":"01502","quantity":"18","quantityType":"EACH","estimatedValue":" $1,000.00 "}
{"name":"Mobilization (4-6 Days), when directed/approved by Project Manager","notes":"01502","quantity":"13","quantityType":"EACH","estimatedValue":" $600.00 "}
Column State
{"colId":"name"}
{"colId":"notes","hidden":false,"headerName":"ID"}
{"colId":"details","hidden":true}
{"colId":"quantityType"}
{"colId":"quantity"}
{"colId":"estimatedValue","hidden":false,"headerName":"Fixed Price"}
{"colId":"response.unitPrice","hidden":true}
{"colId":"response.markupPercent","hidden":true}
{"colId":"response.notes"}
{"colId":"response.nobid","hidden":true}
Id
e4b33391-b1cb-4663-be74-be0d18b1d5d6
Name
Cash Allowances
Type
lineitems_form
Line Items
{"id":"c183bbcf-baac-4d41-9742-c337e55e42b7","name":"Approved Street Cut Permit","notes":"01110","details":"","quantity":"1","quantityType":"CA","estimatedValue":" $10,000.00 "}
{"name":"CenterPoint Pole Bracing","notes":"01110","quantity":"1","quantityType":"LS","estimatedValue":" $10,000.00 "}
Column State
{"colId":"name"}
{"colId":"notes","hidden":false,"headerName":"ID"}
{"colId":"details","hidden":true}
{"colId":"quantityType"}
{"colId":"quantity"}
{"colId":"estimatedValue","hidden":false,"headerName":"Cash Allowance"}
{"colId":"response.unitPrice","hidden":true}
{"colId":"response.markupPercent","hidden":true}
{"colId":"response.notes"}
{"colId":"response.nobid","hidden":true}
Sealed
Yes
Details
Html
<p>All documents should be submitted in accordance with the requirements outlined in the solicitation document.</p>
Opening Date
Utc Date
Jul 30, 2026
Specified Zone
America/Chicago
Type
Competitive Bidding Method
Title
On-Call Services for Wastewater Collection System Rehabilitation and Renewal
Agency
Tag
city-of-houston
Name
City of Houston
Location
Region
Abbr
TX
Name
Texas
Refnum
CB-2026-0048
Status
approved
Due Date
Utc Date
Jul 30, 2026
Specified Zone
America/Chicago
Documents
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1782426456266_d924bf70-8366-4aeb-9ddd-0c9a89cbb6ed/CB-2026-0048-Solicitation.docx.pdf
Name
CB-2026-0048 - Solicitation.docx.pdf
Type
application/pdf
Bytes
287170
Bucket
documents.beaconbid.com
Detail
Solicitation
Created At
Jun 25, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1782426438765_10950e9d-8c31-4f88-8f6f-9ff55dd22093/ProjectManual4250-01Sealed05-27-26.pdf
Name
Project_Manual
Type
application/pdf
Bytes
12294349
Bucket
documents.beaconbid.com
Detail
Other
Created At
Jun 25, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1783957660042_4ab7ea52-2d73-4678-b1da-628ca7b3caaf/SPD-Pre-BidPresentation-CB-2026-0048.pdf
Name
SPD - Pre-Bid Presentation - CB-2026-0048.pdf
Type
application/pdf
Bytes
2501197
Bucket
documents.beaconbid.com
Detail
Other
Created At
Jul 13, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1783957667930_e7b99a0c-1ac3-46e8-abcd-8a493c25d4a7/OBO-ConstructionPrebidMeeting-7.13.26.pdf
Name
OBO - Construction Prebid Meeting - 7.13.26.pdf
Type
application/pdf
Bytes
769147
Bucket
documents.beaconbid.com
Detail
Other
Created At
Jul 13, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1783957676591_86501009-ed42-4df7-bbfe-3a7dbae9594f/Pre-BidSign-InSheet-CB-2026-0048.pdf
Name
Pre-Bid Sign-In Sheet - CB-2026-0048.pdf
Type
application/pdf
Bytes
150502
Bucket
documents.beaconbid.com
Detail
Sign-In Sheet
Created At
Jul 13, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Key
agency/281287c2-49c0-439e-81d7-315d13b0b4fb/solicitation/1784832762469_0490758b-1aac-418d-b92b-77070fcd7adb/LOC1-CB-2026-0048-ResponsetoQuestions.docx.pdf
Name
LOC 1 - CB-2026-0048 - Response to Questions.docx.pdf
Type
application/pdf
Bytes
225389
Bucket
documents.beaconbid.com
Detail
Letter of Clarification
Created At
Jul 23, 2026
Created By
Id
d6cc0663-07ff-4184-96e3-8faf9b3fbcbc
Name
Elvia Fernandez
Document Source
s3
Issue Date
Utc Date
Jul 3, 2026
Specified Zone
America/Chicago
Categories
Code
91300
Name
CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES
Type
nigp
Code
2505
Name
Pipe Bursting
Type
bpc
Suggestion
Yes
Code
491
Name
Sewer/Drainage Construction/Rehabilitation
Type
bpc
Suggestion
Yes
Code
1937
Name
Sewer Repair/Rehabilitation
Type
bpc
Suggestion
Yes
Code
2464
Name
Wastewater Construction
Type
bpc
Code
390
Name
Liner Sewer/Construction
Type
bpc
Departments
Houston Public Works
Description
Html
<p><span style="color: black;">The City of Houston (“City”) is soliciting bids from qualified bidders to provide On-Call Services for Wastewater Collection System Rehabilitation and Renewal. &nbsp;This project includes but is not limited to rehabilitation and replacement of portions of the sanitary sewer system, including point repairs, sewer replacement, service lateral repairs, sliplining, pipe bursting, slurry boring, and service reconnections. The work also includes cleaning and televising sanitary sewers, installation and rehabilitation of manholes, pavement</span></p><p></p><p>For information related to bid opening, please visit the following link: <a data-umami-event="outbound-link-click" data-umami-event-url="https://www.houstontx.gov/bizwithhou/BidOpening.html" target="_blank" rel="noopener noreferrer nofollow" href="https://www.houstontx.gov/bizwithhou/BidOpening.html" style="color: rgb(16, 107, 163); word-break: break-word;">Strategic Procurement Division's Bid Opening</a></p>
Published At
Jul 3, 2026
Primary Contact
Name
Elvia Fernandez
Email
Elvia.Fernandez@houstontx.gov
Phone
(754) 233-0309‬
Additional Information
Type
Budget
Detail
$4,300,000.00

Source: City of Houston (solicitation HOUSTON-591b9024-918d-4e15-8871-85d19f407547), retrieved via the City of Houston BeaconBid portal. View the official posting — always confirm requirements and deadlines with the issuing agency.