- Invite ' + value.companyName + ' ' + value.contactName + ' '; }); htmlData = htmlData + ' '; showPopup( '', htmlData); } } } else { showPopup( "", "Error in searching vendor contact."); } initiateSelfInvite(); }); } else { showPopup("", "Please enter a valid email address."); } }); $(".attachDownLink").on( "click", function() { $("#attachmentId").val( $(this).attr("data-attachmentId")); $("#sourceSystemType").val( $(this).attr( "data-sourceSystemType")); var requestTime = new Date().getTime(); if (attachmentId && sourceSystemType) { $.post("./downloadAttachment?" + requestTime, { attachmentId : attachmentId, sourceSystemType : sourceSystemType }, function(data) { }); } }); }); SB001-27 Demolition of 225 Langley Drive Start Date: Jun 18, 2026 @ 04:23 PM ET End Date: Jul 30, 2026 @ 02:00 PM ET Ends In: 6 days Event Details Offerors' Conference Documents Event Details Event ID Event Type Event Status Purchase Type Category Type Government Type Fiscal Year Agency Site Show Details --> PE-66751-NONST-2027-000000097 Non-State Agency Open Non-State Agency Construction / Public Works city 2027 66751 LAWRENCEVILLE, CITY OF Buyer Contact: Chris Duncan chris.duncan@lawrencevillega.org 6784076421 --> Description The work to be performed by the Contractor consists of but is not limited to the following major items: 1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite including protection of stormwater intlets at all times. 2. All building structures and site features, including but not limited to floor slabs, drains, lifts, concrete sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used aboveground storage tanks (ASTs), signs, junk, trash, the convenience store building, underground storage tanks (USTs), fueling canopy, fuel dispenser islands, dumpster enclosure and pads, grease trap, utility appurtenances, foundations, underground structures, trees, shrubs, and any other abandoned site features located inside or outside the main building area, shall be completely demolished and removed from the site. The existing concrete parking lot shall be demolished and removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in place. (Refer to the site plan for the limits of demolition). 3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance. (Refer to site plan) 4. Once demolition is completed, Contractor should place concrete bin blocks at driveways. 5. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. 6. See additional information in the Site Plan and Phase I Environmental Assessment report. NIGP Codes Code
- Excerpt
- June 18, 2026
NOTICE OF BID
SB001-27
The City of Lawrenceville is soliciting competitive sealed bids from qualified contractors for the Demolition of 225
Langley Drive located at 225 Langley Drive, Lawrenceville, GA 30046. Sealed bids will be received by the
Lawrenceville Finance Department, 70 S. Clayton Street, Main Level, Room M46A, Lawrenceville, Georgia 30046 until
2:00 P.M. local time on Thursday, July 30, 2026 and then publicly opened and read aloud. Any bid received after 2:00
P.M. will not be accepted. Bid envelope should be marked on the outside with Bid Number, name of Bidder, date, and
time of opening.
The work to be performed by the Contractor consists of but is not limited to the following major items:
1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite
including protection of stormwater intlets at all times.
2. All building structures and site features, including but not limited to floor slabs, drains, lifts, concrete
sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used aboveground storage tanks (ASTs),
signs, junk, trash, the convenience store building, underground storage tanks (USTs), fueling canopy, fuel
dispenser islands, dumpster enclosure and pads, grease trap, utility appurtenances, foundations, underground
structures, trees, shrubs, and any other abandoned site features located inside or outside the main building area,
shall be completely demolished and removed from the site. The existing concrete parking lot shall be demolished
and removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in place.
(Refer to the site plan for the limits of demolition).
3.
- Attachments
- Id
- 49385476
- Name
- SB001_27 Inv Final.pdf
- Id
- 50979386
- Name
- SB001_27 Add 1 Final.pdf
- Contact Name
- Chris Duncan
- Description
- The work to be performed by the Contractor consists of but is not limited to the following major
items:
1. Secure the perimeter following International Building Code. Install erosion control
measurements around jobsite including protection of stormwater intlets at all times.
2. All building structures and site features, including but not limited to floor slabs, drains,
lifts, concrete sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used
aboveground storage tanks (ASTs), signs, junk, trash, the convenience store building, underground
storage tanks (USTs), fueling canopy, fuel dispenser islands, dumpster enclosure and pads, grease
trap, utility appurtenances, foundations, underground structures, trees, shrubs, and any other
abandoned site features located inside or outside the main building area, shall be completely
demolished and removed from the site. The existing concrete parking lot shall be demolished and
removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in
place. (Refer to the site plan for the limits of demolition).
3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site
does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance.
(Refer to site plan)
4. Once demolition is completed, Contractor should place concrete bin blocks at driveways.
5. All demolition debris must be removed and disposed of properly in an appropriate landfill or
recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act
of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4.
6. See additional information in the Site Plan and Phase I Environmental Assessment report.