The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.
AB-1
REQUEST FOR PROPOSAL
JOHNSON AVE STORMWATER & STREETSCAPE
CITY OF CARROLLTON
CARROLLTON, GEORGIA
The City of Carrollton (the “City”) is soliciting sealed proposals for furnishing labor, tools, equipment, and
appurtenances necessary for the construction of the Johnson Ave Stormwater & Streetscape Project.
Proposals will be received by the City at the Carrollton City Hall Third Floor Conference Room, located at
315 Bradley Street, Carrollton, Georgia 30117, until 10:00 a.m., local time, on Tuesday, August 11, 2026,
and then at said office publicly opened and the bid price read aloud.
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to
Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project
will include installation of new 18”-60” storm sewer piping and drainage structures; new 8” sanitary sewer
main piping and manholes; new 8” and 12” water mains; reconnecting sanitary sewer and water services;
relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking
lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road
and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and
parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent
stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility
Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and
fully closed during certain phases of construction, but closure of the roads and parking lots will need to be
kept to a minimum. The Contractor is expected to co