Light RFP
Georgia · Georgia

FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project

This opportunity closed on Jul 24, 2026. Browse current bids below.
Closed Jul 24, 2026·Paving / Sidewalks, Demolition / Abatement, Fencing, Bridge / InfrastructureView official posting ↗
Issuing agency
Bulloch County Board Of Commissioners
Method
Competitive Sealed Bid
Category
All Categories
PIN
PE-61600-NONST-2026-000000056
Location
Georgia
Posted
Jun 25, 2026
Takeaways by LightRFP AI
  • Bulloch County Board of Commissioners is accepting sealed bids for the FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project.
  • The project involves demolition of an existing damaged bridge and construction of a new bridge, roadway, guardrail, erosion control, and permanent stabilization.
  • The place of performance is along Cypress Lake Road at Dry Branch Creek in Bulloch County, GA.
  • Bids are due July 24, 2026 at 2:00 PM EDT, as revised by Addendum #1.
  • Requirement: Bidders must submit evidence of current active approval as a GDOT Prequalified Contractor in Work Class 500 Concrete Structures.
  • Requirement: A bid bond in the amount of 5% of the total bid is required to be submitted with the bid.
  • Requirement: The successful bidder shall furnish payment and performance bonds each in an amount not less than one hundred percent (100%) of the total contract price.
  • Requirement: The bidder shall purchase and maintain workers' compensation, general comprehensive liability insurance with limits of not less than $1,000,000 per occurrence and $2,000,000 aggregate, and motor vehicle liability insurance with limits of not less than $1,000,000 per person and $2,000,000 per accident.

AI-generated, verify all details against the official documents.

Description

The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-003-2 Cypress Lake Road Bridge Construction Project. The project consists of demolition and removal of an existing damaged bridge structure, construction of a new bridge structure, roadway construction items including embankment construction, construction of new approach slabs, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing and marking, new guardrail installation, erosion and sediment control, water quality monitoring, and permanent grassing and stabilization. The project is located along Cypress Lake Road at the Dry Branch Creek crossing and approximately 1,500 feet east of the intersection of Cypress Lake Road at Country Club Road and near coordinates Latitude 32.393779, Longitude -81.856229.
A bid package may be requested by emailing the Bulloch County Procurement Office, at Procurementeng@bullochcounty.net, going to the Bulloch County website: https://bullochcounty.net/bid-opportunities/ or by going to the Georgia Procurement Registry website: https://doas.ga.gov/state-purchasing/georgia-procurement-registry-local-governments/gpr-overview.
All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor in Work Class 500 Concrete Structures as it appears in GDOT's Directory of Prequalified Contractors webpage as of the bid submission deadline July 17, 2026, 2:00 PM EDT.
Bidders are responsible for the actual delivery of sealed bids during normal business hours to the Bulloch County Procurement Office. The original bid along with one (1) copy and supporting documents must be submitted in a sealed clearly marked envelope addressed to Peyton Fuller, Procurement Director, Cypress Lake Road Bridge Construction Project.

06/25/2026 NOTICE OF SOLICITATION: INVITATION TO BID #FY27-ENGCP-003-2
BULLOCH COUNTY CAPITAL IMPROVEMENT PROGRAM
1
NOTICE OF SOLICITATION – INVITATION TO BID:
Bulloch County Board of Commissioners
Engineering Department and the Office of Capital Projects
DESCRIPTION OF PROJECT: The Bulloch County Board of Commissioners is accepting sealed
bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-003-2 Cypress Lake Road
Bridge Replacement Project. The project consists of demolition and removal of an existing
damaged bridge structure, construction of a new bridge structure, roadway construction items
including embankment construction, construction of new approach slabs, subgrade construction,
graded aggregate base construction, asphalt pavement construction, signing and marking, new
guardrail installation, erosion and sediment control, water quality monitoring, and permanent
grassing and stabilization. The project is located along Cypress Lake Road at the Dry Branch Creek
crossing and approximately 1,500 feet west of the intersection of Cypress Lake Road at Country
Club Road and near coordinates Latitude 32.393879, Longitude -81.856229.
TIME ALLOWED FOR PERFORMANCE: The project shall commence immediately following
issuance of the notice to proceed. The Contractor shall achieve Substantial Completion Deadline of
the work and certification of same no later than August 31st, 2027 and shall achieve Final
Acceptance Deadline of the work and certification of same no later than September 30th, 2027.
TERMS AND TIME OF PAYMENT: The contractor shall receive payment within fifteen (15) days of
receipt of an approved invoice for quantities installed, with a retainage factor as specified in the bid
package and contract. The County reserves the right to increase or decrease

Documents9
Document 1Link
Document 2Link
Document 3Link
Document 4Link
Document 5Link
Document 6Link
Document 7Link
Document 8Link
Document 9Link

Contact

Name
Peyton Fuller
Phone
(912) 764-0165
Address
Georgia
Full source recordfrom Georgia Procurement Registry
Title
FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project
Detail
Fields
Invite
Invite ' + value.companyName + ' ' + value.contactName + ' '; }); htmlData = htmlData + ' '; showPopup( '', htmlData); } } } else { showPopup( "", "Error in searching vendor contact."); } initiateSelfInvite(); }); } else { showPopup("", "Please enter a valid email address."); } }); $(".attachDownLink").on( "click", function() { $("#attachmentId").val( $(this).attr("data-attachmentId")); $("#sourceSystemType").val( $(this).attr( "data-sourceSystemType")); var requestTime = new Date().getTime(); if (attachmentId && sourceSystemType) { $.post("./downloadAttachment?" + requestTime, { attachmentId : attachmentId, sourceSystemType : sourceSystemType }, function(data) { }); } }); }); FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project Start Date: Jun 25, 2026 @ 09:23 AM ET End Date: Jul 06, 2026 @ 08:44 AM ET Ends In: Ending soon 21hrs,50 mins Event Details Documents Event Details Event ID Event Type Event Status Purchase Type Category Type Government Type Fiscal Year Agency Site Show Details --> PE-61600-NONST-2026-000000056 Non-State Agency Open Non-State Agency Construction / Public Works county 2026 61600 BULLOCH COUNTY BOARD OF COMMISSIONERS Buyer Contact: Peyton Fuller pfuller@bullochcounty.net 912-764-0165 --> Description The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-003-2 Cypress Lake Road Bridge Construction Project. The project consists of demolition and removal of an existing damaged bridge structure, construction of a new bridge structure, roadway construction items including embankment construction, construction of new approach slabs, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing and marking, new guardrail installation, erosion and sediment control, water quality monitoring, and permanent grassing and stabilization. The project is located along Cypress Lake Road at the Dry Branch Creek crossing and approximately 1,500 feet east of the intersection of Cypress Lake Road at Country Club Road and near coordinates Latitude 32.393779, Longitude -81.856229. A bid package may be requested by emailing the Bulloch County Procurement Office, at Procurementeng@bullochcounty.net, going to the Bulloch County website: https://bullochcounty.net/bid-opportunities/ or by going to the Georgia Procurement Registry website: https://doas.ga.gov/state-purchasing/georgia-procurement-registry-local-governments/gpr-overview. All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor in Work Class 500 Concrete Structures as it appears in GDOT's Directory of Prequalified Contractors webpage as of the bid submission deadline July 17, 2026, 2:00 PM EDT. Bidders are responsible for the actual delivery of sealed bids during normal business hours to the Bulloch County Procurement Office. The original bid along with one (1) copy and supporting documents must be submitted in a sealed clearly marked envelope addressed to Peyton Fuller, Procurement Director, Cypress Lake Road Bridge Construction Project. NIGP Codes Code
Excerpt
06/25/2026 NOTICE OF SOLICITATION: INVITATION TO BID #FY27-ENGCP-003-2 BULLOCH COUNTY CAPITAL IMPROVEMENT PROGRAM 1 NOTICE OF SOLICITATION – INVITATION TO BID: Bulloch County Board of Commissioners Engineering Department and the Office of Capital Projects DESCRIPTION OF PROJECT: The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project. The project consists of demolition and removal of an existing damaged bridge structure, construction of a new bridge structure, roadway construction items including embankment construction, construction of new approach slabs, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing and marking, new guardrail installation, erosion and sediment control, water quality monitoring, and permanent grassing and stabilization. The project is located along Cypress Lake Road at the Dry Branch Creek crossing and approximately 1,500 feet west of the intersection of Cypress Lake Road at Country Club Road and near coordinates Latitude 32.393879, Longitude -81.856229. TIME ALLOWED FOR PERFORMANCE: The project shall commence immediately following issuance of the notice to proceed. The Contractor shall achieve Substantial Completion Deadline of the work and certification of same no later than August 31st, 2027 and shall achieve Final Acceptance Deadline of the work and certification of same no later than September 30th, 2027. TERMS AND TIME OF PAYMENT: The contractor shall receive payment within fifteen (15) days of receipt of an approved invoice for quantities installed, with a retainage factor as specified in the bid package and contract.
Contact Name
Peyton Fuller
Description
The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-003-2 Cypress Lake Road Bridge Construction Project. The project consists of demolition and removal of an existing damaged bridge structure, construction of a new bridge structure, roadway construction items including embankment construction, construction of new approach slabs, subgrade construction, graded aggregate base construction, asphalt pavement construction, signing and marking, new guardrail installation, erosion and sediment control, water quality monitoring, and permanent grassing and stabilization. The project is located along Cypress Lake Road at the Dry Branch Creek crossing and approximately 1,500 feet east of the intersection of Cypress Lake Road at Country Club Road and near coordinates Latitude 32.393779, Longitude -81.856229. A bid package may be requested by emailing the Bulloch County Procurement Office, at Procurementeng@bullochcounty.net, going to the Bulloch County website: https://bullochcounty.net/bid-opportunities/ or by going to the Georgia Procurement Registry website: https://doas.ga.gov/state-purchasing/georgia-procurement-registry-local-governments/gpr-overview. All contractors seeking to provide construction delivery services to Bulloch County for this project shall submit evidence of current active approval as a GDOT Prequalified Contractor in Work Class 500 Concrete Structures as it appears in GDOT's Directory of Prequalified Contractors webpage as of the bid submission deadline July 17, 2026, 2:00 PM EDT. Bidders are responsible for the actual delivery of sealed bids during normal business hours to the Bulloch County Procurement Office. The original bid along with one (1) copy and supporting documents must be submitted in a sealed clearly marked envelope addressed to Peyton Fuller, Procurement Director, Cypress Lake Road Bridge Construction Project.
Category Type
Construction / Public Works
Contact Email
pfuller@bullochcounty.net
Contact Phone
(912) 764-0165
Status
Open
Listing
Title
FY27-ENGCP-003-2 Cypress Lake Road Bridge Replacement Project
Status
Open
Approval
A
Ending In
Ending soon 2hrs,58 mins
Noia Days
0
Source Id
gpr20
E Source Id
gpr20
Agency Code
61600
Agency Name
Bulloch County Board Of Commissioners
Sole Source
No
Closing Date
Jul 24, 2026
Posting Date
Jun 25, 2026
Electronic Bid
No
Esource Number
PE-61600-NONST-2026-000000056
Financial Year
2026
Bid Process Type
Non-State Agency
Closing Date Str
Jul 24, 2026 @ 02:00 PM
Government Type
county
Posting Date Str
Jun 25, 2026 @ 09:23 AM
Closing Date Sort
1784916000000
Posting Date Sort
1782393828000
Esource Number Key
PE-61600-NONST-2026-000000056
Tooltip Closing Date
Jul 24, 2026 @ 02:00 PM
Tooltip Posting Date
Jun 25, 2026 @ 09:23 AM
Enriched
Yes
Closing Ms
1784916000000
Posting Ms
1782393828000
Agency Name
Bulloch County Board Of Commissioners
Category Label
All Categories
Esource Number
PE-61600-NONST-2026-000000056
Government Type
county
Source System Type
gpr20

Source: Georgia Procurement Registry (solicitation GEORGIA-PE-61600-NONST-2026-000000056), retrieved via the Georgia Procurement Registry (DOAS). View the official posting — always confirm requirements and deadlines with the issuing agency.