The Savannah Airport Commission hereby invites the submission of sealed bids for:
RFP 2026-0029 Lifecycle Replacement of Existing 60 kW Generator (RFP 2026-0029)
Solicitation Opening Thursday, August 20, 2026
Solicitation Closing Wednesday, September 30, 2026
In order to provide a response to this RFP, all respondents must first register their company through the following link: https://savannahairport.bonfirehub.com. Responses will not be accepted via email or mail. For questions regarding vendor registration or instructions on bid submissions, please contact Christy Dixon @ cdixon@flysav.com.
The Savannah Airport Commission reserves the right to reject any and all bids and waive informalities and irregularities in the bids received.
1
REQUEST FOR PROPOSAL
for
Lifecycle Replacement of Existing 60kW Generator
(RFP 2026-0029)
PROPOSAL SUBMITTAL DEADLINE
5:00 P.M. (EST)
Wednesday, September 30, 2026
LOCATION:
SAVANNAH AIRPORT COMMISSION
400 AIRWAYS AVENUE
SAVANNAH, GA 31408
2
REQUEST FOR PROPOSAL
Lifecycle Replacement of Existing 60 kW Generator
RFP 2026-0029
PURPOSE OF PROPOSAL
The Savannah Airport Commission (SAC) is seeking proposals from a qualified
contractors for the complete lifecycle replacement of an existing 60 kW natural gas
emergency generator with a new 60 kW diesel generator system, including a minimum
3‑day fuel capacity base-mounted fuel tank, day tank, new reinforced concrete pad,
underground conduit installation, electrical reconnections, startup, testing, and
training.
Participation in this RFP process is at the sole expense of the proposer. Any costs
incurred in the preparation or submission of a proposal shall not be reimbursed by the
Savannah Airport Commission. Proposals for these services will be received by the
Savannah Airport Commission until 5:00 P.M. (EST), September 30, 2026, at which
time they will be opened by the Commission’s Purchasing Manager, whose contact
information is below. All responses to this proposal must be submitted through
https://savannahairport.bonfirehub.com/, and will not be accepted via email or
mail.
Christy Dixon, A.A.E., NIGP-CPP
Purchasing Manager
cdixon@flySAV.com
TABLE OF CONTENTS
Airport Overview pg. 3
RFP Timeline pp. 4-5
Cone of Silence pg. 5
Contract Terms pg. 5
Project Overview & Scope of Work pp. 6-9
Submittal Instructions pp. 10-12
Required Forms pg. 12
Evaluation Criteria & Award pp. 13-15
Exhibit A pp.
The selected contractor shall provide all labor, materials, equipment, necessary permits, testing, and disposal necessary to deliver a fully operational generator system. Work includes utility locates, furnishing and installing a new 60 kW diesel generator with a minimum 3-day fuel capacity base-mounted fuel tank, constructing a new reinforced concrete pad, installing underground conduit and wiring, making electrical connections and integration, performing startup, testing, and commissioning, providing on-site training for owner's personnel, and removing and disposing of the existing 60 kW natural gas generator.
We post new generators opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-33699-NONST-2026-000000132), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.