Poncha Substation Service

Due Aug 7, 2026·10 days left·General ConstructionView official posting ↗
Issuing agency
DOE - DOE
Method
Solicitation
PIN
89503226BWA000080
Posted
Jun 23, 2026
Takeaways by LightRFP AI
  • The Poncha Substation Service project aims to increase reliability of the Poncha substation service feed and provide backup power.
  • Work includes demolition, site development, and installation of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard.
  • The solicitation is issued by DOE - DOE / Western Rocky Mountain Region with reference number 89503226BWA000080.
  • The due date for responses is August 7, 2026 at 4:00 PM US/Eastern.
  • A vendors conference is scheduled for July 1, 2026 at 10:00 AM.
  • Requirement: Bid, Performance, and Payment bonds are required as indicated by the attachment titled 'Attch E. Bid, Performance, Payment Bonds'.

AI-generated, verify all details against the official documents.

Description

Poncha Substation Service is a multi-part project to increase the reliability of the Poncha substation service feed and provide backup power to help decrease station service outages. The principal components of work include the following: a. Provide demolition and site development. b. Furnish and install main station service equipment consisting of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard. c. Furnish and install over the trench distribution panels inside control building. d. Furnish and install gas cart safety switches. e. Furnish and install LP tank and generator pad. f. Remove and dispose of two (2) existing pad mount transformers designated K1 and K2 with associated equipment. g. Furnish and install grounding systems, conduit, and insulated cable. h. Install associated cable terminations.

Solicitation — DOE - DOE / Western Rocky Mountain Region
PSC Y1PZ · NAICS 237130 · Ref 89503226BWA000080

Documents10
89503226BWA000080Link
022. Sol 89503226BWA000080Link
Attch A. PON Construction Spec FinalLink
Attch B. PON_final_drawings_04_21_26Link
Attch C. PON_Blanket CX for Routine Maintenance ActivitiesLink
Attch D1. WD Chaffee Cnty, CO (Bldg) CO20260001-05.18.20262026
Attch D2. WD Chaffee Cnty, CO (Hvy) CO20260003-05.18.20262026
Attch D3. WD Chaffee Cnty, CO (Hwy) CO20260012-05.18.20262026
Attch E. Bid, Performance, Payment BondsLink
Attch E1. SF24-16e.Bid.Bond (Blank)Link

Contact

Name
John Pratt
Full source recordfrom DOE - DOE
Psc
Y1PZ
Naics
237130
Title
Poncha Substation Service
Agency
DOE - DOE
Detail
Fields
Email
jpratt@wapa.gov
NAICS
237130-Power and Communication Line and Related Structures Construction
Agency
DOE
Contact
John Pratt
PSC / FSC
Y1PZ-CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Issue Date
06/23/2026
Response Due
08/07/2026 04:00 PM US/Eastern
Reference Number
89503226BWA000080
Vendors Conference
07/01/2026 10:00 AM
Documents
Node
s89503226BWA000080\157584\SUPPORTDOC,2654975
Title
89503226BWA000080
Node
s89503226BWA000080\157584\SUPPORTDOC,2654974
Title
022. Sol 89503226BWA000080
Node
s89503226BWA000080\157584\SUPPORTDOC,2654978
Title
Attch A. PON Construction Spec Final
Node
s89503226BWA000080\157584\SUPPORTDOC,2654976
Title
Attch B. PON_final_drawings_04_21_26
Node
s89503226BWA000080\157584\SUPPORTDOC,2654977
Title
Attch C. PON_Blanket CX for Routine Maintenance Activities
Node
s89503226BWA000080\157584\SUPPORTDOC,2654980
Title
Attch D1. WD Chaffee Cnty, CO (Bldg) CO20260001-05.18.2026
Node
s89503226BWA000080\157584\SUPPORTDOC,2654981
Title
Attch D2. WD Chaffee Cnty, CO (Hvy) CO20260003-05.18.2026
Node
s89503226BWA000080\157584\SUPPORTDOC,2654982
Title
Attch D3. WD Chaffee Cnty, CO (Hwy) CO20260012-05.18.2026
Node
s89503226BWA000080\157584\SUPPORTDOC,2654984
Title
Attch E. Bid, Performance, Payment Bonds
Node
s89503226BWA000080\157584\SUPPORTDOC,2654983
Title
Attch E1. SF24-16e.Bid.Bond (Blank)
Contact Name
John Pratt
Description
Poncha Substation Service is a multi-part project to increase the reliability of the Poncha substation service feed and provide backup power to help decrease station service outages. The principal components of work include the following: a. Provide demolition and site development. b. Furnish and install main station service equipment consisting of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard. c. Furnish and install over the trench distribution panels inside control building. d. Furnish and install gas cart safety switches. e. Furnish and install LP tank and generator pad. f. Remove and dispose of two (2) existing pad mount transformers designated K1 and K2 with associated equipment. g. Furnish and install grounding systems, conduit, and insulated cable. h. Install associated cable terminations.
Contact Email
jpratt@wapa.gov
Description Full
Poncha Substation Service is a multi-part project to increase the reliability of the Poncha substation service feed and provide backup power to help decrease station service outages. The principal components of work include the following: a. Provide demolition and site development. b. Furnish and install main station service equipment consisting of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard. c. Furnish and install over the trench distribution panels inside control building. d. Furnish and install gas cart safety switches. e. Furnish and install LP tank and generator pad. f. Remove and dispose of two (2) existing pad mount transformers designated K1 and K2 with associated equipment. g. Furnish and install grounding systems, conduit, and insulated cable. h. Install associated cable terminations.
State By
none
Issue Date
6/23/2026
Ref Number
89503226BWA000080
Stage Type
Solicitation
Response Date
08/07/2026 04:00 PM US/Eastern
Detail Fetched
Yes
Issuing Office
Western Rocky Mountain Region
Attachments Parsed
Yes

Source: DOE - DOE (solicitation FEDCONNECT-89503226BWA000080), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.