2027.0083, City RFP - MEP Engineering Design for Installation of a Fire Sprinkler System at Lathon Wider CC
RFP Opening: October 1, 2026 at 4:00 PM
Project is funded in whole or in part with U.S. Department of Housing and Urban Development (HUD) funds.
No RFP Deposit
Non-Mandatory Pre-Proposal Meeting: September 17, 2026 at 10:00 AM. Meet at Lathon Wider Community Center, located at 34 Woodland Ave, Stamford, CT 06902.
Project Manager: Scott Butch, Director of Facilities and Sustainability
All Proposal and Bid documents, drawings and specifications can be viewed/ downloaded from ProcureWare (https://stamfordct.procureware.com). All questions regarding the solicitation must be submitted online via the Clarifications feature in ProcureWare.
We post new architecture and design opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
1149300111493005Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: State of Connecticut (CTsource) (bid 145658), retrieved via the CT DAS CTsource BidBoard (WebProcure). View the official posting, and always confirm requirements and deadlines with the issuing agency.