Light RFP
Charlotte · Charlotte, NC

FY2026 and FY2027 Various Storm Water Services Projects

Open — see notice·General ConstructionView official posting ↗
Issuing agency
City of Charlotte — Storm Water Services
Category
Construction
PIN
2026-Q1(Jan-Mar)-CSWS-19187
Location
Charlotte, NC
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • The City of Charlotte Storm Water Services is issuing a Request for Qualifications (RFQ) for FY2026 and FY2027 Various Storm Water Services Projects.
  • The selected firms will use HEC-HMS, HEC-RAS, and/or a hydraulic grade line closed system computer model, or an approved alternative (SWMM) method.
  • Work will be issued via written Task Orders, which will specify the requirements of the various projects.
  • The city anticipates selecting multiple firms to provide these services.
  • The total project value is anticipated to be $10,000,000+.
  • Requirement: The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile, Errors & Omissions / Professional Liability, General Liability, and Workers Compensation.
  • Requirement: The City anticipates setting goals for the following types of subcontractor utilization: SBE-Small Business Enterprise, MBE-Minority Business Enterprise, WBE-Women Owned Business Enterprise.

AI-generated, verify all details against the official documents.

Description

The following is a general description of the Scopes of Service included in this RFQ. The selected firms will use HEC-HMS, HEC-RAS, and/or a hydraulic grade line closed system computer model, or an approved alternative (SWMM) method.

Anticipated posting date: 2026-02-23

Requirements

Insurance Requirements
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers

Subcontracting Opportunities
Subcontracting Opportunities Engineering Consulting; ENGINEERING SERVICES PROFESSIONAL; Civil Engineering; Environmental Engineering; Engineering Services Not otherwise classified

Estimated Total Value
The total project value is anticipated to be: $10,000,000+

Utilization
The City anticipates setting goals for the following types of subcontractor utilization: SBE-Small Business Enterprise MBE-Minority Business Enterprise WBE-Women Owned Business Enterprise

Contract Term
The term of the project is anticipated to be: Not to Exceed

Contact

Name
Abby Dolan
Address
Charlotte, NC
Full source recordfrom City of Charlotte
Dept
CSWS
Slug
FY2026-and-FY2027-Various-Storm-Water-Services-Projects
Title
FY2026 and FY2027 Various Storm Water Services Projects
Detail
Text
Skip to main content English is your current preferred language. MENU Open Search Search Home / Growth and Development/ Doing Business with the City / Contract Opportunities / FY2026 and FY2027 Various Storm Water Services Projects FY2026 and FY2027 Various Storm Water Services Projects Anticipated Posting Date: 2026-02-23 Reference number2026-Q1(Jan-Mar)-CSWS-19187 StatusUpcoming SummaryThe following is a general description of the Scopes of Service included in this RFQ. The selected firms will use HEC-HMS, HEC-RAS, and/or a hydraulic grade line closed system computer model, or an approved alternative (SWMM) method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City’s then current AutoCAD standards will be used for production of all plans and profiles. Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple Task Orders may be issued at once.  The City of Charlotte reserves the right, upon successful completion of a given Task Order, to issue subsequent Task Orders to the same or a different Company. The below list provides a general list of the tasks required. Task orders may include any of the following: Surveying, utility locating, and PACP stormwater asset inspections. Existing and Proposed Conditions Analyses Channel Stabilization and/or Restoration Utility Coordination Easement/Plat Preparation Public Engagement Preliminary and final design Permitting/Encroachments (404/401, NCDOT, Railroad Agencies and FEMA Floodplain Development Permitting) Preparation of Construction Documents (Plans, Specifications, and Cost Estimates) Bid and Construction Phase Services Geotechnical and Structural Engineering Services The city anticipates selecting multiple firms to provide these services. These will be drainage area-based storm drainage improvement projects that involve differing land uses within the project areas. Drainage basins may include closed and open systems. The study areas may be on a portion of the watershed or the entire watershed. Task orders may be issued for multiple projects at once. Upon satisfactorily completing a task order, the City may issue additional task orders. Scoping on these projects is anticipated to begin in early 2026. Requirements Insurance Requirements Subcontracting Opportunities Estimated Total Value Utilization Contract Term Print Page Contact details Abby Dolan adolan@charlottenc.gov Bid Details Department: Charlotte Storm Water Services - Construction Commodity Code(s): 91842, 92500, 92517, 92535, 92536 Related Information Facebook X Back to top Accessibility Policy ADA Accommodations Sitemap Public Records Privacy & Legal Notices Contact Us Subscribe/Notify Me CharMeck Alerts CATS Riders Alerts Social Facebook LinkedIn Twitter Instagram © 2026 City of Charlotte | Powered by Granicus
Contact
Name
Abby Dolan
Email
adolan@charlottenc.gov
Requirements
**Insurance Requirements** The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers **Subcontracting Opportunities** Subcontracting Opportunities Engineering Consulting; ENGINEERING SERVICES PROFESSIONAL; Civil Engineering; Environmental Engineering; Engineering Services Not otherwise classified **Estimated Total Value** The total project value is anticipated to be: $10,000,000+ **Utilization** The City anticipates setting goals for the following types of subcontractor utilization: SBE-Small Business Enterprise MBE-Minority Business Enterprise WBE-Women Owned Business Enterprise **Contract Term** The term of the project is anticipated to be: Not to Exceed
Status
Upcoming
Reference
2026-Q1(Jan-Mar)-CSWS-19187
Anticipated
Feb 23, 2026
Description
The following is a general description of the Scopes of Service included in this RFQ. The selected firms will use HEC-HMS, HEC-RAS, and/or a hydraulic grade line closed system computer model, or an approved alternative (SWMM) method.
Categorized By
llm
Detail Fetched
Yes

Source: City of Charlotte (opportunity CHARLOTTE_NC-FY2026-and-FY2027-Various-Storm-Water-Services-Projects), retrieved via the City of Charlotte Contract Opportunities portal. View the official posting — always confirm requirements and deadlines with the issuing agency.