Light RFP
California · Sacramento, CA

26-328070 DWR - Electric Vehicle Supply Equipment - Buena Vista Pumping Plant 13642

Due Sep 15, 2026·47 days left·General ConstructionView official posting ↗
Issuing agency
California — Department of General Services
Method
RFx
Category
Vehicle vibration dampeners & isolators - Electric vehicle charging systems
PIN
0000039928
Location
Sacramento, CA
Posted
Jul 30, 2026
Takeaways by LightRFP AI
  • The California Department of Water Resources is soliciting bids for electric vehicle supply equipment installation at the Buena Vista Pumping Plant in Taft, Kern County, CA.
  • The project is open only to Small Business and Micro Business contractors certified through the California Department of General Services.
  • Bids must be submitted electronically to Eric.Waddell@dgs.ca.gov by 2:00 P.M. on September 15, 2026.
  • A mandatory virtual prebid site inspection tour is scheduled for September 1, 2026 at 1:00 P.M.
  • The estimated cost for the project is $300,509.00.
  • The contract term is 60 calendar days.
  • Requirement: License required to bid the project: C-10 Certificate of Reported Compliance (CRC).
  • Requirement: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.

AI-generated, verify all details against the official documents.

Description

DWR - ELECTRIC VEHICLE SUPPLY EQUIPMENT - BUENA VISTA PUMPING PLANT CALIFORNIA DEPARTMENT OF WATER RESOURCES TAFT, KERN COUNTY, CA CONTRACT NUMBER: 26-328070, PROJECT NUMBER: 13642 This project is being bid in accordance with Government Code 14838.7 and is open only to Small Business and Micro Business contractors certified through the California Department of General Services, Office of Small Business and DVBE Services. Bids shall be submitted electronically to Eric.Waddell@dgs.ca.gov before 2:00 P.M. September 15, 2026. Project comprises labor, material and services necessary for: Install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Bollards may be required on this contract even if not shown explicitly on the construction drawings. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain. License required to bid the project: C-10 Certificate of Reported Compliance (CRC) ¿ Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract. More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term ¿employee¿, ¿worker¿, ¿state worker¿ or ¿state employee¿ in health and safety mandates includes contractor and subcontractor personnel. Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. Prospective bidders must attend the virtual mandatory prebid site inspection tour on September 1, 2026 at 1:00 P.M., at: https://teams.microsoft.com/meet/248859064224882?p=5UpXe1e1TBAlImF5HG . Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov/. Click on ¿Start Search.¿ In the Event name field, enter the project number and click search. While viewing the Event Details, click on ¿View Event Package¿ to view bid forms. It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation. Drawings and Project Manual may also be viewed through Builders' Exchanges. States estimated cost: $300,509.00. The term of this project is 60 calendar days. The States Project Director is Janelle Goulding at (916) 823-7059.

Sell Event / RFx · Event version 1 · Department: Department of General Services · Event ID: 0000039928

UNSPSC categories:

  • 25175000 Vehicle vibration dampeners & isolators - Electric vehicle charging systems

Contact

Name
Eric Waddell
Address
Sacramento, CA
Full source recordfrom Cal eProcure
Row
Dept
Department of General Services
Name
26-328070 DWR - Electric Vehicle Supply Equipment - Buena Vista Pumping Plant 13642
Status
Posted
Event Id
0000039928
End Date Raw
09/15/20262:00PM PDT
Detail
Bu
7760
Format
Sell Event / RFx
Unspsc
Code
25175000
Description
Vehicle vibration dampeners & isolators - Electric vehicle charging systems
Version
1
End Date Raw
09/15/2026 2:00PM PDT
Pub Date Raw
07/30/2026 11:48AM PDT
Contact Name
Eric Waddell
Description
DWR - ELECTRIC VEHICLE SUPPLY EQUIPMENT - BUENA VISTA PUMPING PLANT CALIFORNIA DEPARTMENT OF WATER RESOURCES TAFT, KERN COUNTY, CA CONTRACT NUMBER: 26-328070, PROJECT NUMBER: 13642 This project is being bid in accordance with Government Code 14838.7 and is open only to Small Business and Micro Business contractors certified through the California Department of General Services, Office of Small Business and DVBE Services. Bids shall be submitted electronically to Eric.Waddell@dgs.ca.gov before 2:00 P.M. September 15, 2026. Project comprises labor, material and services necessary for: Install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Bollards may be required on this contract even if not shown explicitly on the construction drawings. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain. License required to bid the project: C-10 Certificate of Reported Compliance (CRC) ¿ Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract. More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term ¿employee¿, ¿worker¿, ¿state worker¿ or ¿state employee¿ in health and safety mandates includes contractor and subcontractor personnel. Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. Prospective bidders must attend the virtual mandatory prebid site inspection tour on September 1, 2026 at 1:00 P.M., at: https://teams.microsoft.com/meet/248859064224882?p=5UpXe1e1TBAlImF5HG . Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov/. Click on ¿Start Search.¿ In the Event name field, enter the project number and click search. While viewing the Event Details, click on ¿View Event Package¿ to view bid forms. It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation. Drawings and Project Manual may also be viewed through Builders' Exchanges. States estimated cost: $300,509.00. The term of this project is 60 calendar days. The States Project Director is Janelle Goulding at (916) 823-7059.
Contact Email
eric.waddell@dgs.ca.gov

Source: Cal eProcure (event CAL_EPROCURE-0000039928), retrieved via California's Cal eProcure statewide procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.