South Lamar Blvd Corridor: US 290 to Montclaire St.

Due Aug 13, 2026·15 days left·Plumbing, Paving / SidewalksView official posting ↗
Issuing agency
City of Austin
Method
Invitation For Bids (IFB)
Category
Construction
PIN
IFB 6100 CLMC971
Location
Austin, TX
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • The City of Austin is soliciting bids for corridor mobility improvements on South Lamar Boulevard from US 290 to Montclaire St.
  • The estimated cost for the project is $22,000,000.00.
  • Bids are due by 2:00 PM on August 13, 2026.
  • A non-mandatory pre-bid conference is scheduled for July 14, 2026, at 10:00 AM.
  • The project includes removal of existing sidewalk, curb and gutter, installation of new curb and gutter, ADA compliant shared-use paths, sidewalks, bike lanes, ramps, mill and overlay, traffic signal improvements, bus stop relocation and construction, storm drain, water and wastewater line improvements, streetscape and landscape improvements, tree plantings, irrigation, rain gardens, signing and striping, and intermittent median construction.
  • The contract time for substantial completion is 1,044 calendar days after the Notice to Proceed.
  • Liquidated damages are $1,800 per calendar day for failure to substantially complete the work.
  • Requirement: A bid guaranty in an amount of not less than five percent (5%) of the total Bid must accompany all Bids.
  • Requirement: Performance and payment bonds, each in an amount of one hundred percent (100%) of the Contract Amount, are required.
  • Requirement: A Compliance Plan must be submitted with the bid, and if not submitted prior to the due date, the bid will not be accepted.
  • Requirement: The Prime Contractor must submit proof of prequalification from the Texas Department of Transportation within three working days of notification of low bidder status.
  • Requirement: MBE/WBE participation goals are stated for this solicitation: African American 1.72%, Hispanic American 5.05%, Native/Asian American 0.54%, WBE 1.49%.

AI-generated, verify all details against the official documents.

Description

The Work consists of approximately three (1.5) miles of corridor mobility improvements on South Lamar Boulevard from US 290 to Montclaire St. This includes removal of existing sidewalk, removal of existing curb and gutter, installation of new curb and gutter closer to the centerline of the road, construction of ADA compliant shared-use paths, sidewalks, bike lanes and ramps, mill and overlay portions of the roadway, traffic signal
improvements, relocation of bus stops, construction of new bus stops, storm drain improvements, water and wastewater line improvements, streetscape improvements, landscape improvements, tree plantings, planting zones, irrigation, rain gardens, signing and striping, and intermittent median construction.

Estimated Amount: $22,000,000.00

Special Notes: Compliance Plan Required.

Documents6
IFB_6100_CLMC971_PBA_v1.pdfPDF
IFB_6100_CLMC971_BID_DOC_v1.pdfPDF
IFB_6100_CLMC971_MWDBE_PAC_v1.pdfPDF
IFB_6100_CLMC971_PLANS_1_v1.pdfPDF
IFB_6100_CLMC971_PLANS_2_v1.pdfPDF
IFB_6100_CLMC971_TECH_DOC_v1.pdfPDF

Contact

Name
Jennifer Newell
Phone
(512) 974-2862
Address
Austin, TX
Full source recordfrom City of Austin
Sid
138022
Type
Invitation For Bids (IFB)
Title
South Lamar Blvd Corridor: US 290 to Montclaire St.
Fields
WBE
1.49%
Type
Invitation For Bids (IFB)
Status
Open
Summary
The Work consists of approximately three (1.5) miles of corridor mobility improvements on South Lamar Boulevard from US 290 to Montclaire St. This includes removal of existing sidewalk, removal of existing curb and gutter, installation of new curb and gutter closer to the centerline of the road, construction of ADA compliant shared-use paths, sidewalks, bike lanes and ramps, mill and overlay portions of the roadway, traffic signal improvements, relocation of bus stops, construction of new bus stops, storm drain improvements, water and wastewater line improvements, streetscape improvements, landscape improvements, tree plantings, planting zones, irrigation, rain gardens, signing and striping, and intermittent median construction.
Description
South Lamar Blvd Corridor: US 290 to Montclaire St.
Response Due
Prior to 08/13/2026, 02:00 PM
Special Notes
Compliance Plan Required.
African American
1.72%
Response Opening
08/13/2026, 03:00 PM
Hispanic American
5.05%
Compliance Plan Due
Prior to 08/13/2026 02:00 PM Required
Solicitation Number
IFB 6100 CLMC971
Native/Asian American
0.54%
Solicitation Specific Questions
Sofia Johnson (512) 9749143 sofie.johnson@austintexas.gov
Estimated Amount For Solicitation
$22,000,000.00
Small Minority Business Resources Questions
Ruby Villanueva-Kellough (512) 9747639 smbrcompliancedocuments@austintexas.gov
Authorized Contact Names: Project Related Questions
Jennifer Newell (512) 9742862 jennifer.newell@austintexas.gov
Important Solicitation Dates: Solicitation Published
07/06/2026 07:20 AM
Vendor Meetings/Conference, Site Visits (Date/Time): Meeting
07/14/2026, 10:00 AM
Number
IFB 6100 CLMC971
Status
Open
Due Date
Aug 13, 2026
Summary
The Work consists of approximately three (1.5) miles of corridor mobility improvements on South Lamar Boulevard from US 290 to Montclaire St. This includes removal of existing sidewalk, removal of existing curb and gutter, installation of new curb and gutter closer to the centerline of the road, construction of ADA compliant shared-use paths, sidewalks, bike lanes and ramps, mill and overlay portions of the roadway, traffic signal improvements, relocation of bus stops, construction of new bus stops, storm drain improvements, water and wastewater line improvements, streetscape improvements, landscape improvements, tree plantings, planting zones, irrigation, rain gardens, signing and striping, and intermittent median construction.
Est Amount
$22,000,000.00
Contact Name
Jennifer Newell
Contact Email
jennifer.newell@austintexas.gov
Contact Phone
(512) 974-2862
Special Notes
Compliance Plan Required.

Source: City of Austin (solicitation AUSTIN_TX-138022), retrieved via Austin Finance Online (AFO). View the official posting — always confirm requirements and deadlines with the issuing agency.