Light RFP
Government · Cordova, AK

ITB NFHWY00737 Copper River Highway Odiak Slough Culvert Replacement

Due Aug 23, 2026·25 days left·Bridge / InfrastructureView official posting ↗
Issuing agency
Transportation and Public Facilities
Method
Invitation to Bid
Category
Construction Bids
Location
Cordova, AK
Posted
Jul 23, 2026
Takeaways by LightRFP AI
  • The Alaska Department of Transportation and Public Facilities is issuing an Invitation to Bid for the Copper River Highway Odiak Slough Culvert Replacement project (Project No. 0851076/NFHWY00737).
  • The work consists of replacing a deep culvert at Odiak Slough near Milepost 1.3 on the Copper River Highway in Cordova, Alaska, and includes pavement preservation, roadside hardware, drainage improvements, ADA improvements, and utilities.
  • The Engineer's Estimate is between $2,500,000 and $5,000,000.
  • Sealed bids must be received by 2:00 p.m. prevailing time on August 13, 2026, at the Office of the Contracts Engineer, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska.
  • The project completion date is June 30, 2027.
  • Plans, specifications, and bid documents are available for free download at https://ui.bidx.com/ALASKA/lettings or for a $100 non-refundable charge per set from the Contracts Section in Fairbanks.
  • Requirement: Bidder must hold a valid Alaska Contractor License appropriate for the work.
  • Requirement: Bidder must provide a bid bond or bid security as required by the Standard Specifications and bidding documents.
  • Requirement: Successful bidder must furnish a Performance Bond and a Payment Bond each in the amount of 100% of the contract price.
  • Requirement: Contractor must comply with Alaska prevailing wage rates as determined by the Department of Labor.
  • Requirement: Contractor must comply with Disadvantaged Business Enterprise (DBE) nondiscrimination requirements and afford DBEs full opportunity to participate.

AI-generated, verify all details against the official documents.

Description

Sealed bids for furnishing all labor, materials, equipment and performing all work on Project No. 0851076/NFHWY00737, Copper River Highway Odiak Slough Culvert Replacement, described herein, will be received until 2:00 p.m. prevailing time, August 13, 2026, in the Office of the Contracts Engineer, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska.

The project consists of replacing deep culvert at Odiak Slough near Milepost 1.3 on the Copper River Highway in Cordova. Project work includes pavement preservation, roadside hardware, drainage improvements, ADA improvements and utilities.

Engineer's Estimate is between $2,500,000 and $5,000,000.

The project completion date is June 30, 2027.

Plans, specs, bid documents, reports, addenda and other bidder information are posted online, available for downloading free of charge at: https://ui.bidx.com/ALASKA/lettings.

Hard copies of plans & specifications are still available from the Contracts Section, Department of Transportation & Public Facilities, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska 99709, telephone number: 907-451-2247; TDD: 711 or 1-800-770-8973 (for Hearing Impaired, requires special equipment). There is a non-refundable charge of $100, per set. Check or money order must be made payable to: State of Alaska.

Bidding documents are available for inspection at the DOT&PF regional office in Fairbanks.

NONDISCRIMINATION: The Alaska Department of Transportation and Public Facilities, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C §§ 2000d to 2000d4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Title VI Nondiscrimination Policy: https://dot.alaska.gov/tvi_statement.shtml To file a complaint: dot.alaska.gov/cvlrts/titlevi.shtm.

Contact

Phone
907-451-2247
Address
Cordova, AK
Full source recordfrom Transportation and Public Facilities
Detail
Body
Sealed bids for furnishing all labor, materials, equipment and performing all work on Project No. 0851076/NFHWY00737, Copper River Highway Odiak Slough Culvert Replacement, described herein, will be received until 2:00 p.m. prevailing time, August 13, 2026, in the Office of the Contracts Engineer, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska. The project consists of replacing deep culvert at Odiak Slough near Milepost 1.3 on the Copper River Highway in Cordova. Project work includes pavement preservation, roadside hardware, drainage improvements, ADA improvements and utilities. Engineer's Estimate is between $2,500,000 and $5,000,000. The project completion date is June 30, 2027. Plans, specs, bid documents, reports, addenda and other bidder information are posted online, available for downloading free of charge at: [https://ui.bidx.com/ALASKA/lettings](https://ui.bidx.com/ALASKA/lettings). Hard copies of plans & specifications are still available from the Contracts Section, Department of Transportation & Public Facilities, Engineering Services Building, Room 3, 2301 Peger Road, Fairbanks, Alaska 99709, telephone number: 907-451-2247; TDD: 711 or 1-800-770-8973 (for Hearing Impaired, requires special equipment). There is a non-refundable charge of $100, per set. Check or money order must be made payable to: State of Alaska. Bidding documents are available for inspection at the DOT&PF regional office in Fairbanks. NONDISCRIMINATION: The Alaska Department of Transportation and Public Facilities, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C §§ 2000d to 2000d4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Title VI Nondiscrimination Policy: [https://dot.alaska.gov/tvi_statement.shtml](https://dot.alaska.gov/tvi_statement.shtml) To file a complaint: [dot.alaska.gov/cvlrts/titlevi.shtm](https://dot.alaska.gov/tvi_statement.shtml).
Title
ITB NFHWY00737 Copper River Highway Odiak Slough Culvert Replacement
Category
Procurement
Created By
Created 7/22/2026 11:21:16 AM by djscott
Locations
Cordova
Revisions
Cells
Created 7/22/2026 11:21:16 AM by djscott
Department
Transportation and Public Facilities
Archive Date
8/23/2026
Publish Date
7/23/2026
Sub Category
Construction Bids
Listing
Title
ITB NFHWY00737 Copper River Highway Odiak Slough Culvert Replacement
Snippet
Sealed bids for furnishing all labor, materials, equipment and performing all work on Project No. 0851076/NFHWY00737, Copper River Highway Odiak Slough Culvert Replacement, described herein, will be r...
Deadline
8/13/2026
Notice Id
224566
Posted Date
7/23/2026
Detail Fetched
Yes

Source: Transportation and Public Facilities (solicitation AK_OPN-224566), retrieved via a public procurement portal. View the official posting — always confirm requirements and deadlines with the issuing agency.