The upgrade of the generator control system consists of, but is not limited to the following:
Execution planning
Decommissioning, Removal and disposal of existing generator control system
Disconnection, removal and disposal of existing ACON Generator control system
Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system
The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years*.***
Commissioning, test run
Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion.
Regulations/standards incl. electro- technical safety regulations:
ÖNORM B 2110 General terms for construction work
ETG 1992 electrical engineering law
ÖVE/ÖNORM- E 8101
ÖVE/ÖNORM- E 8015-1-3
ÖVE/EN 1
DIN German industrial standards
VDI guidelines
Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum.
Planned Execution period: Ocotober 2026