Light RFP
Federal · SAM.gov · Washington

N--MORA-PARADISE FIBER INSTALL

Due Aug 17, 2026·20 days left·General ConstructionView official posting ↗
Issuing agency
Department of the Interior
Method
Solicitation
Category
Construction · NAICS 238210
PIN
140P8326Q0055
Location
Washington
Posted
Jul 23, 2026
Takeaways by LightRFP AI
  • The National Park Service (PWR OLYM MABO) issued Solicitation 140P8326Q0055 for the Paradise Fiber Install project at Mount Rainier National Park in Washington State.
  • The solicitation was originally posted on 2026-07-17 and amended on 2026-07-23 to add FAR Clause 52.219-14 Limitations on Subcontracting.
  • Quotes are due by 2026-08-17 at 12:00 PM Pacific Time.
  • The work must be completed within 90 calendar days after notice to proceed.
  • The procurement is set aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSBC).
  • The scope includes furnishing and installing approximately 10,000 linear feet of fiber optic cable, conduit, vaults, and associated equipment at the Paradise developed area.
  • A mandatory site visit is scheduled for 2026-07-28 at 10:00 AM at the Paradise Inn Parking Lot.
  • Questions are due by 2026-08-04 at 12:00 PM Pacific Time.
  • The wage determination for Lewis County, Washington (General Decision WA20260001) applies.
  • Alternative Payment Protections (Payment Bond) at 100% of contract price are required within 10 days of award.
  • Liability Insurance per DIAR clause 1452.228-70 is required.
  • SAM.gov registration must be active at time of offer submission.
  • Requirement: Alternative Payment Protections (Payment Bond) at 100% of contract price due within 10 days of award.
  • Requirement: Liability Insurance per DIAR clause 1452.228-70.
  • Requirement: Active SAM.gov registration at time of offer submission.
  • Requirement: Service-Disabled Veteran-Owned Small Business Concern (SDVOSBC) set-aside eligibility.
  • Requirement: FAR Clause 52.219-14 Limitations on Subcontracting applies.
  • Requirement: Prevailing wage rates per Davis-Bacon Act (Decision WA20260001 for Lewis County, WA).

AI-generated, verify all details against the official documents.

Description

The purpose of this Amendment 0001 is to:

  1. Add mandatory FAR Clause 52.219-14 Limitations on Subcontracting by reference.

By direction of the Contracting Officer, no other changes have been made.

This listing has limited details available. Please refer to the official posting for full scope, bonding requirements, submission instructions, and other bid details.

Documents9
Sol_140P8326Q0055_Amd_0001.pdfPDF
Sol_140P8326Q0055.pdfPDF
Attachment_7_SIte_Visit_Location_Details_MORA_Paradise_Fiber_Install_2pgs.docxDOCX
Attachment_4_SOW_MORA_Paradise_Fiber_Install_39pgs.pdfPDF
Attachment_1_READ_ME_FIRST_-_FAQs_3pgs.pdfPDF
Attachment_3_Wage_Determination_Lewis_Washington_MORA_Paradise_Fiber_Optic_Install_9pgs.pdfPDF
Attachment_5_Forms_to_Return_with_Quote_8pgs.docxDOCX
Attachment_6_SOW_Appendix_A_5pgs.pdfPDF
Attachment_2_Simplified_Construction_Terms_Provisions_Clauses_34pgs.pdfPDF

Contact

Name
Michael Abner
Address
WA 98362
Full source recordfrom SAM.gov
Hit
Id
9d8f51ecb271425cbcf0617338dc1a61
Type
Code
o
Value
Solicitation
Type
opportunity
Award
Awardee
Title
N--MORA-PARADISE FIBER INSTALL
R Score
0
Is Active
Yes
Is Canceled
No
Publish Date
Jul 23, 2026
Descriptions
Content
The purpose of this Amendment 0001 is to:<br/><br/>1. Add mandatory FAR Clause 52.219-14 Limitations on Subcontracting by reference.<br/><br/>By direction of the Contracting Officer, no other changes have been made.
Last Modified Date
Jul 23, 2026
Modified Date
Jul 23, 2026
Response Date
Aug 17, 2026
Modifications
Count
1
Parent Notice Id
789d0248ed8942829c945e267beb2b19
Response Time Zone
America/Los_Angeles
Response Date Actual
Aug 17, 2026
Solicitation Number
140P8326Q0055
Organization Hierarchy
Code
1400
Name
INTERIOR, DEPARTMENT OF THE
Type
DEPARTMENT
Level
1
Status
active
Address
Country
"US"
Organization Id
100010393
Code
1443
Name
NATIONAL PARK SERVICE
Type
AGENCY
Level
2
Status
active
Address
Organization Id
100010512
Code
140P83
Name
PWR OLYM MABO(83000)
Type
OFFICE
Level
3
Status
active
Address
Zip
"98362"
City
"PORT ANGELES"
State
"WA"
Country
"USA"
Street Address
"600 E PARK AVENUE"
Organization Id
100169599
Org
Cgac
014
Code
140P83
Name
PWR OLYM MABO(83000)
Type
OFFICE
Level
3
L1 Name
INTERIOR, DEPARTMENT OF THE
L2 Name
NATIONAL PARK SERVICE
L3 Name
PWR OLYM MABO(83000)
Org Key
100169599
Aac Code
140P83
Fpds Code
1443
L1 Org Key
100010393
L2 Org Key
100010512
Created By
FH-RE-INGESTION
Fpds Org Id
83000
Mod Status
ACTIVE
Parent Org
NATIONAL PARK SERVICE
Start Date
Apr 2, 2016
Agency Name
INTERIOR, DEPARTMENT OF THE
Created Date
Apr 2, 2016
L1 Short Name
DOI
Has Contracts
Yes
Is Source Fpds
Yes
Org Addresses
City
PORT ANGELES
Type
M
State
WA
Org Key
100169599
Zipcode
98362
Created By
FH-RE-INGESTION
Mod Status
active
Address Key
50168699
Country Code
USA
Created Date
Apr 1, 2016
Is Source Fpds
Yes
Street Address
600 E PARK AVENUE
Last Modified By
FH-RE-INGESTION
Last Modified Date
Aug 8, 2018
Parent Org Key
100010512
Code Hierarchy
1400.1443.140P83
Full Parent Path
100010393.100010512.100169599
Last Modified By
IAE_25286_Old_Code_Mapping
Org Office Types
Org Key
100169599
Position
3
Is Latest
Yes
Office Id
230654
Created By
FH_JOB
Mod Status
Yes
Start Date
Apr 1, 2016
Office Type
1
Created Date
Aug 22, 2018
Office Type Id
1
Office Type Name
CONTRACT FUNDING
Org Key
100169599
Position
1
Is Latest
Yes
Office Id
433428
Created By
FH-RE-INGESTION
Mod Status
Yes
Start Date
Apr 1, 2016
Office Type
2
Created Date
May 11, 2019
Office Type Id
2
Last Modified By
FH-RE-INGESTION
Office Type Name
CONTRACT AWARDS
Last Modified Date
May 11, 2019
Org Key
100169599
Position
2
Is Latest
Yes
Office Id
388788
Created By
FH_Job
Mod Status
Yes
Start Date
Apr 1, 2016
Office Type
3
Created Date
Sep 24, 2018
Office Type Id
3
Last Modified By
FH_Job
Office Type Name
FINANCIAL ASSISTANCE AWARDS
Last Modified Date
Sep 24, 2018
Last Modified Date
Nov 1, 2019
Full Parent Path Name
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.PWR OLYM MABO(83000)
Type
Solicitation
Title
N--MORA-PARADISE FIBER INSTALL
Active
Yes
Detail
Type
o
Award
Naics
Code
238210
Type
primary
Title
N--MORA-PARADISE FIBER INSTALL
Archive
Date
Sep 1, 2026
Type
auto15
Permissions
IVL
Read
Yes
Create
Yes
Solicitation
Set Aside
SDVOSBC
Deadlines
Response
Aug 17, 2026
Response Tz
America/Los_Angeles
Organization Id
100169599
Point Of Contact
Type
primary
Email
michael_abner@ios.doi.gov
Phone
0000000000
Full Name
Abner, Michael
Classification Code
N059
Place Of Performance
Solicitation Number
140P8326Q0055
Additional Reporting
none
History
History
Index
2
Title
N--MORA-PARADISE FIBER INSTALL
Latest
1
Deleted
0
Action Date
2026-07-23T20:28:15.627+00
Action Type
publish
Posted Date
2026-07-23T20:28:15.625+00
Request Type
modify
Cancel Notice
0
Archive Notice
0
Opportunity Id
9d8f51ecb271425cbcf0617338dc1a61
Procurement Type
o
Solicitation Number
140P8326Q0055
Parent Opportunity Id
789d0248ed8942829c945e267beb2b19
Index
1
Title
MORA-PARADISE FIBER INSTALL
Latest
0
Deleted
0
Action Date
2026-07-17T21:25:47.728+00
Action Type
publish
Posted Date
2026-07-17T21:25:47.725+00
Request Type
submit
Cancel Notice
0
Archive Notice
0
Opportunity Id
789d0248ed8942829c945e267beb2b19
Procurement Type
o
Solicitation Number
140P8326Q0055
Base Type
Solicitation
Notice Id
9d8f51ecb271425cbcf0617338dc1a61
Naics Code
238210
Resources
Attachments
Name
"Sol_140P8326Q0055_Amd_0001.pdf"
Size
205901
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-23T20:28:15.625+00:00"
Resource Id
"1259194891db4407b47bf2ce0b121aa2"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"3212fa6ae7cc4a1a98ad7ef4599adb89"
Explicit Access
"0"
Attachment Order
9
Export Controlled
"0"
Name
"Sol_140P8326Q0055.pdf"
Size
286229
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"17bded91f982464f8750583a0a8994ed"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"d26142790e954aa980b3c9abfced4beb"
Explicit Access
"0"
Attachment Order
8
Export Controlled
"0"
Name
"Attachment_7_SIte_Visit_Location_Details_MORA_Paradise_Fiber_Install_2pgs.docx"
Size
1829975
Type
"file"
Mime Type
".docx"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"80554d75e62d4a40ab2f4c7eea9aa9e8"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"ed848d35436344b3be62476ca5683515"
Explicit Access
"0"
Attachment Order
7
Export Controlled
"0"
Name
"Attachment_4_SOW_MORA_Paradise_Fiber_Install_39pgs.pdf"
Size
526092
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"9cd9e041de014390b85e03fcf3cf16bb"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"39dc02d31c0442739a9e682b1135a64a"
Explicit Access
"0"
Attachment Order
6
Export Controlled
"0"
Name
"Attachment_1_READ_ME_FIRST_-_FAQs_3pgs.pdf"
Size
199903
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"32d3b361c5cd4917bd286a7082aa0503"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"52de38df40d0442d930e92b8f76436c6"
Explicit Access
"0"
Attachment Order
5
Export Controlled
"0"
Name
"Attachment_3_Wage_Determination_Lewis_Washington_MORA_Paradise_Fiber_Optic_Install_9pgs.pdf"
Size
2891824
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"a1f91ba42eb24aaeb2a449c9b2e0ea5f"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"3d31e1d7513e4c99ab7e29e7d780f07b"
Explicit Access
"0"
Attachment Order
4
Export Controlled
"0"
Name
"Attachment_5_Forms_to_Return_with_Quote_8pgs.docx"
Size
37229
Type
"file"
Mime Type
".docx"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"71ef62a773364eee9f3b6ee1b144cb1b"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"49a866067c15466686c5f1a785103caa"
Explicit Access
"0"
Attachment Order
3
Export Controlled
"0"
Name
"Attachment_6_SOW_Appendix_A_5pgs.pdf"
Size
2665823
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"a8e248c4880e4f3abdabc88488e93306"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"ef4ffb38bd8b4c738dfe7d985183fbb4"
Explicit Access
"0"
Attachment Order
2
Export Controlled
"0"
Name
"Attachment_2_Simplified_Construction_Terms_Provisions_Clauses_34pgs.pdf"
Size
554493
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-17T21:25:47.725+00:00"
Resource Id
"c1c60a4e95494095a59a3f0c01357844"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"d11ab65678b74fe08979c443499d1a81"
Explicit Access
"0"
Attachment Order
1
Export Controlled
"0"
Opportunity Id
9d8f51ecb271425cbcf0617338dc1a61
Department
DEPARTMENT OF THE INTERIOR
Posted Date
Jul 23, 2026
Detail Fetched
Yes
Office Address
State
WA
Zipcode
98362
Country Code
USA
History Fetched
Yes
Point Of Contact
Type
primary
Email
michael_abner@ios.doi.gov
Phone
0000000000
Full Name
Abner, Michael
Description Text
The purpose of this Amendment 0001 is to: 1. Add mandatory FAR Clause 52.219-14 Limitations on Subcontracting by reference. By direction of the Contracting Officer, no other changes have been made.
Resources Fetched
Yes
Response Dead Line
Aug 17, 2026
Full Parent Path Name
DEPARTMENT OF THE INTERIOR.NATIONAL PARK SERVICE.PWR OLYM MABO(83000)
Place Of Performance
Solicitation Number
140P8326Q0055

Source: SAM.gov (notice 9d8f51ecb271425cbcf0617338dc1a61), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.