Light RFP
Federal · SAM.gov · Durham, NC

J041--558-22-172, Replace Chillers in AHU 1 and 2

Due Aug 27, 2026·30 days left·ElectricalView official posting ↗
Issuing agency
Department of Veterans Affairs
Method
Solicitation
Category
Construction · NAICS 236220
PIN
36C24626B0029
Location
Durham, NC
Posted
Jul 24, 2026
Takeaways by LightRFP AI
  • The Department of Veterans Affairs issued solicitation 36C24626B0029 for replacement of chillers serving AHU 1 and 2 at the Durham VA Medical Center in Durham, NC.
  • The procurement is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 236220 with a magnitude of construction between $2,000,000 and $5,000,000.
  • Bids are due by 2026-08-28 at 2:00 PM EDT (14:00 local time) and must be submitted electronically; the solicitation was posted on 2026-07-24.
  • A mandatory site visit is scheduled for 2026-07-30 at 9:00 AM ET at Building 6, Engineering Office, Durham VAMC, 508 Fulton Street, Durham, NC 28301.
  • Questions are due by 2026-08-06 at 11:59 PM ET and must be submitted via email to Alice Custis at alice.custis@va.gov; no telephone inquiries are accepted.
  • The contract period of performance is 270 calendar days after notice to proceed, and the contractor must begin performance within 15 calendar days after award.
  • Funding is not presently available and award is subject to availability of funds; the Government assumes no responsibility for offeror costs.
  • Requirement: Performance Bond (Standard Form 25) and Payment Bond (Standard Form 25A) required at award because the contract will exceed $150,000.
  • Requirement: Construction wage rate requirements apply (Davis-Bacon) per FAR 52.222-5 and 52.222-6.
  • Requirement: Buy American Act requirements for construction materials per FAR 52.225-10.
  • Requirement: Contractor must hold appropriate badges/identification for site access and comply with VA security and infection control requirements.
  • Requirement: Hot work permits required from facility Safety Manager at least 48 hours in advance per NFPA 241 and NFPA 51B.
  • Requirement: Written utility outage requests must be submitted to COR at least 20 days in advance.
  • Requirement: No storage of materials on VA property unless approved by COR.

AI-generated, verify all details against the official documents.

Description

STATEMENT OF WORK

Project Number: 558-22-172 Replace Chillers for AHU 1 and 2

  • Scope:

  • The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications.

  • Construction Period -

  • Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed.

  • Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants.

  • Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting.

  • As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats.

  • Hours of Operation and Phasing:

  • Construction should be phased and timed such that:

  • General Operation of the affected areas is not interrupted

  • The facility operates on a 24-hour, 7 day per week schedule

  • Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR.

  • Contractor to develop and coordinate phasing plan with input from staff and final approval of COR.

  • Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date.

  • Storage: No storage of any material will be allowed on VA property unless approved by the COR.

  • Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP).

  • Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption.

  • General Requirements

  • The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site.

  • Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space.

  • Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR.

  • All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period.

  • Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance.

  • New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition.

  • The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project.

END OF SCOPE OF WORK

Documents3
36C24626B0029 POST 07242026.pdfPDF
558-22-172_VA Durham_Replace Chillers Drawings.pdfPDF
558-22-172_Durham Chillers_Specs.pdfPDF

Contact

Name
Alice Custis
Phone
757.722.9961 ext 18670
Address
Durham, NC 27705
Full source recordfrom SAM.gov
Hit
Id
999ac6aa51a743de828df73cc50fedfd
Type
Code
o
Value
Solicitation
Type
opportunity
Award
Awardee
Title
J041--558-22-172, Replace Chillers in AHU 1 and 2
R Score
0
Is Active
Yes
Is Canceled
No
Publish Date
Jul 24, 2026
Descriptions
Content
<p>STATEMENT OF WORK</p> <p><strong>Project Number: 558-22-172&nbsp; Replace Chillers for AHU 1 and 2</strong></p> <p></p> <ol> <li><strong>Scope:</strong>&nbsp; <ol> <li>The scope of work shall generally consist of but not limited to the fol
Last Modified Date
Jul 24, 2026
Modified Date
Jul 24, 2026
Response Date
Aug 27, 2026
Modifications
Count
0
Response Time Zone
America/New_York
Response Date Actual
Aug 27, 2026
Solicitation Number
36C24626B0029
Organization Hierarchy
Code
3600
Name
VETERANS AFFAIRS, DEPARTMENT OF
Type
DEPARTMENT
Level
1
Status
active
Address
Country
"US"
Organization Id
100006568
Code
3600
Name
VETERANS AFFAIRS, DEPARTMENT OF
Type
AGENCY
Level
2
Status
active
Address
Organization Id
300000214
Code
36C246
Name
246-NETWORK CONTRACTING OFFICE 6 (36C246)
Type
OFFICE
Level
3
Status
active
Address
Zip
"23667"
City
"HAMPTON"
State
"VA"
Country
"USA"
Street Address
"100 EMANCIPATION DR"
Organization Id
100167096
Type
Solicitation
Title
J041--558-22-172, Replace Chillers in AHU 1 and 2
Active
Yes
Detail
Type
o
Naics
Code
236220
Type
primary
Title
J041--558-22-172, Replace Chillers in AHU 1 and 2
Archive
Date
Sep 11, 2026
Type
auto15
Version
2
Permissions
IVL
Read
Yes
Create
Yes
Delete
Yes
Update
Yes
Solicitation
Set Aside
SDVOSBC
Deadlines
Response
Aug 27, 2026
Response Tz
America/New_York
Organization Id
100167096
Point Of Contact
Type
primary
Email
alice.custis@va.gov
Phone
757.722.9961 ext 18670
Title
Contract Specialist
Full Name
Alice Custis
Classification Code
J041
Place Of Performance
Zip
27705
City
Code
19000
Name
Durham
State
Code
NC
Name
North Carolina
Country
Code
USA
Name
UNITED STATES
Solicitation Number
36C24626B0029
Additional Reporting
none
History
History
Index
2
Title
J041--558-22-172, Replace Chillers in AHU 1 and 2
Latest
1
Deleted
0
Action Date
2026-07-24T11:03:04.847+00
Action Type
publish
Posted Date
2026-07-24T11:03:04.842+00
Request Type
submit
Cancel Notice
0
Archive Notice
0
Opportunity Id
999ac6aa51a743de828df73cc50fedfd
Procurement Type
o
Solicitation Number
36C24626B0029
Related Opportunity Id
e9eafc37f473406fa82e2e907f574779
Index
1
Title
J041--558-22-172, Replace Chillers in AHU 1 and 2
Latest
1
Deleted
0
Action Date
2026-07-08T13:56:32.805+00
Action Type
publish
Posted Date
2026-07-08T13:56:32.803+00
Request Type
submit
Cancel Notice
0
Archive Notice
0
Opportunity Id
e9eafc37f473406fa82e2e907f574779
Procurement Type
p
Solicitation Number
36C24626B0029
Base Type
Solicitation
Notice Id
999ac6aa51a743de828df73cc50fedfd
Naics Code
236220
Resources
Attachments
Name
"36C24626B0029 POST 07242026.pdf"
Size
493935
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-24T11:03:04.842+00:00"
Resource Id
"83b4279fc2c4458f89f4af56de28a771"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"818ee772b1e345f5852c8df2af0b05f3"
Explicit Access
"0"
Attachment Order
7
Export Controlled
"0"
Name
"558-22-172_VA Durham_Replace Chillers Drawings.pdf"
Size
17677999
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-24T11:03:04.842+00:00"
Resource Id
"59a5f593114b42698dec60cf52a6b824"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"b6b3bdf7498548c5bcbde2afe7563529"
Explicit Access
"0"
Attachment Order
6
Export Controlled
"0"
Name
"558-22-172_Durham Chillers_Specs.pdf"
Size
11038810
Type
"file"
Mime Type
".pdf"
File Exists
"1"
Posted Date
"2026-07-24T11:03:04.842+00:00"
Resource Id
"4d252c8f9e2d4afca829631561d2472c"
Access Level
"public"
Deleted Flag
"0"
Access Status
"public"
Attachment Id
"95d9b024f7294bf282698b7a71633843"
Explicit Access
"0"
Attachment Order
4
Export Controlled
"0"
Opportunity Id
999ac6aa51a743de828df73cc50fedfd
Department
DEPARTMENT OF VETERANS AFFAIRS
Posted Date
Jul 24, 2026
Detail Fetched
Yes
History Fetched
Yes
Point Of Contact
Type
primary
Email
alice.custis@va.gov
Phone
757.722.9961 ext 18670
Title
Contract Specialist
Full Name
Alice Custis
Description Text
STATEMENT OF WORK **Project Number: 558-22-172 Replace Chillers for AHU 1 and 2** - **Scope:** - The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. - **Construction Period** - - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. - Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. - Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. - As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. - **Hours of Operation and Phasing:** - Construction should be phased and timed such that: - General Operation of the affected areas is not interrupted - The facility operates on a 24-hour, 7 day per week schedule - Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. - Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. - Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. - **Storage:** No storage of any material will be allowed on VA property unless approved by the COR. - **Period of Performance:** Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). - **Utility and System or Service Outages:** No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. - **General Requirements** - The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. - Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. - Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. - All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. - Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. - New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. - The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK
Resources Fetched
Yes
Response Dead Line
Aug 27, 2026
Full Parent Path Name
DEPARTMENT OF VETERANS AFFAIRS.DEPARTMENT OF VETERANS AFFAIRS.246-NETWORK CONTRACTING OFFICE 6 (36C246)
Place Of Performance
Zip
27705
City
Code
19000
Name
Durham
State
Code
NC
Name
North Carolina
Country
Code
USA
Name
UNITED STATES
Solicitation Number
36C24626B0029

Source: SAM.gov (notice 999ac6aa51a743de828df73cc50fedfd), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.