16 July 2026 - Amendment 0003 to extend proposal due date.
6 July 2026 - Issue amendment 0002 to
Post Responses to questions.
Update Attachment 1 - SOW.
Update Section L.
Attach document 2e.
Attach Site Visit Sign-in sheet.
18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information.
The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system.
The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators.
The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.
Source: SAM.gov (notice 955b450cd8064ecab0bb49fee93f7db0), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.