Due Aug 10, 2026·13 days left·Electrical, Plumbing, Paving / SidewalksView official posting ↗
Issuing agency
Department of Agriculture
Method
Combined Synopsis/Solicitation
Category
Construction · NAICS 237110
PIN
1240LT26Q0126
Location
Monticello, UT
Posted
Jul 7, 2026
Takeaways by LightRFP AI
  • The Department of Agriculture is soliciting bids for installing trailer pads and utilities at an existing Forest Service bunkhouse in Monticello, Utah.
  • Water, sewer, and electrical utility lines must be connected to existing lines, with specific material and spacing requirements.
  • Optional items include trenching, crushed aggregate, and an asphalt apron.
  • The procurement method is a Combined Synopsis/Solicitation using Standard Form 1442.
  • The solicitation number is 1240LT26Q0126.
  • Key dates: posted 2026-07-07, offers due 2026-08-10 at 17:00 local time.
  • The performance period is 2027-03-01 to 2027-04-30.
  • Requirement: The contractor must furnish any required performance and payment bonds (item 12a on the SF-1442 is marked 'YES').
  • Requirement: An offer guarantee is not required (item 13b on the SF-1442 is marked 'is not required').

AI-generated, verify all details against the official documents.

Description

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.

Utilities –

Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.

Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.

Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

Option Items –

Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.

Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Documents9
C04 SF-1442 1240LT26Q0126.pdfPDF
C04 1240LT26Q0126.docxDOCX
C04 SOW 1240LT26Q0126.docxDOCX
C04 Merged Specs 1240LT26Q0126.docxDOCX
C04 Project Map 1240LT26Q0126.pdfPDF
C04 trailer pad 1240LT26Q0126.pdfPDF
C04 Utility Plan 1240LT26Q0126.pdfPDF
C04 water details 1240LT26Q0126.pdfPDF
C04 WD San Juan County Utah 1240LT26Q0126.pdfPDF

Contact

Name
Derrick A Dodson
Address
Monticello, UT 84535
Full source recordfrom SAM.gov
Type
Combined Synopsis/Solicitation
Title
Upper Baker Installing Trailer Pads and Utilities
Active
Yes
Base Type
Combined Synopsis/Solicitation
Notice Id
951967d44bd44757925a825597357cf3
Naics Code
237110
Department
DEPARTMENT OF AGRICULTURE
Posted Date
Jul 7, 2026
Categorized By
llm
Point Of Contact
Type
primary
Email
derrick.dodson@usda.gov
Full Name
Derrick A Dodson
Type
secondary
Email
Jaren.mccourt@usda.gov
Full Name
Jaren McCourt
Description Text
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway
Response Dead Line
Aug 10, 2026
Full Parent Path Name
DEPARTMENT OF AGRICULTURE.FOREST SERVICE.Manti-Lasal National Forest
Place Of Performance
Zip
84535
City
Code
51580
Name
Monticello
State
Code
UT
Name
Utah
Country
Code
USA
Name
UNITED STATES
Solicitation Number
1240LT26Q0126

Source: SAM.gov (notice 951967d44bd44757925a825597357cf3), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.