Read the notice and its 2 attached documents and pull out the scope, the deadlines and what you have to submit.
All equipment shall be newly manufactured. It shall not be used, refurbished, reconditioned, remanufactured, or previously used for demonstration. The equipment and all included accessories shall be new, unused, and in full working condition at the time of delivery.
Salient characteristics and any single-source need
The salient physical, functional, and performance characteristics the equipment must meet are stated under Minimum technical requirements below:
Minimum technical requirements
The equipment shall meet the following minimum requirements.
Display and user interface
A touchscreen display for user interaction and parameter control
Tissue impedance monitoring
Monitoring of tissue impedance at a minimum rate of 434,000 times per second, providing real-time feedback and energy delivery adjustment
Output frequency
Output frequency within the range of 400 kHz to 500 kHz
Operating modes
The equipment shall support the following operating modes.
Monopolar CUT (Pure)
Monopolar CUT (Blend)
Monopolar COAG (Fulgurate)
Monopolar COAG (Spray)
Monopolar COAG (Soft)
Bipolar coagulation
Vessel sealing
Electrical and safety
Compliance with all applicable Federal, state, and local safety standards
Required accessories
The contractor shall provide all accessories necessary to fully operate the equipment in every operating mode listed above. At minimum the following shall be included.
Monopolar electrode and holster with switch, compatible with all monopolar modes.
Patient return electrode for monopolar operation.
Bipolar forceps, cord, and footswitch for bipolar coagulation.
Vessel sealer with switch for vessel sealing mode.
All accessories shall be compatible with the delivered equipment and ready for use upon delivery.
We post new goods & materials opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20841""Rockville""MD""US"" 5630 Fishers Lane ""20857""ROCKVILLE""MD""USA""5630 FISHERS LANE""HFA-500""Supplies_CSS__V2_2_260620.docx"69760"file"".docx""1""2026-09-10T16:58:20.124+00:00""09188f4d7b794fc98f89a4d7e3acaabb""public""0""public""b57e8917c22d4beaadf5256a5e432dee""0"2"0""Attachment 1 Requirements_Document_ESU_CDRH-2026-134011_jwg.docx"38236"file"".docx""1""2026-09-10T16:58:20.124+00:00""2b7dd373efd9482b9f1d60c82f38cb85""public""0""public""faf0efac3436474f9b13cfe475ebc1b4""0"1"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 93cb831e158f4ae090cfb682c880d645), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.