Light RFP
Federal · SAM.gov · Nebraska

Gavins Point Raw Water Intake Zebra Mussel Mitigation

This opportunity closed on Jul 27, 2026. Browse current bids below.
Closed Jul 27, 2026·Plumbing, Demolition / AbatementView official posting ↗
Issuing agency
Department of Defense
Method
Presolicitation
Category
Construction · NAICS 237110
PIN
W9128F26QA074
Location
Nebraska
Posted
Jul 15, 2026
Takeaways by LightRFP AI
  • The Department of Defense intends to issue a solicitation on or about 27 July 2026 for zebra mussel mitigation at the Gavins Point Raw Water Intake.
  • The solicitation will close on or about 26 August 2026 and is restricted to Small Businesses.
  • The estimated construction cost is between $250,000 and $500,000.
  • The contractor must complete the work 210 days after receipt of Notice to Proceed.
  • The place of performance is Gavins Point Project, Crofton, NE 68730.
  • Requirement: The solicitation is restricted to Small Businesses.

AI-generated, verify all details against the official documents.

Description

***UPDATE 7/15/26: Uploaded draft Contract Drawings. - On or about 27 July 2026, the Government intends to issue a solicitation for Gavins Point Raw Water Intake Zebra Mussel Mitigation. The solicitation will close on or about 26 August 2026. The solicitation is restricted to Small Businesses.

Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via Section 00 21 00.Project Description: The contractor will supply all labor, equipment, and materials for installation of a new zebra mussel mitigation system. The scope of this project is to design a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping. The new design will utilize two small, local skids with spill containment near each raw water strainer within the powerhouse.Significant features of this design include:- Installation of two local tank skids and integral spill containment pallets- Installation of two pump skids for distribution?

Power supply to distribution pumps and ancillary distribution system equipment- Interfacing of distribution pumps with the existing raw water flow metersThe Contractor will be required to commence work upon receipt of contract award and complete the work 210 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Estimated Construction Costs:The estimated construction cost of this project is between $250,000 and $500,000. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237110, Water and Sewer Line and Related Structures Construction, with a size standard for Small Business of $45M.Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (sam.gov).

Find solicitation announcement in SAM.gov (sam.gov).1. Use the All Award Date to locate the project (by entering the solicitation number. 2.

By using the login feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3.

Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading Attachments/Links. Contracting Office Address:USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901Point Of Contact: All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance).

Place of Performance:Gavins Point ProjectCrofton, NE 68730Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM.

Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Documents4
oppMgmtLink.xhtmlXHTML
index.xhtmlXHTML
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfPDF
Document 4Link

Contact

Name
Brianna WOHLERS
Phone
(402) 995-2668
Address
NE 68730
Full source recordfrom SAM.gov
Type
Presolicitation
Title
Gavins Point Raw Water Intake Zebra Mussel Mitigation
Active
Yes
Base Type
Presolicitation
Notice Id
93aed4aee64b4eb186efe95b5f5a92e3
Naics Code
237110
Department
DEPARTMENT OF DEFENSE
Posted Date
Jul 15, 2026
Categorized By
llm
Office Address
State
NE
Zipcode
68102-4901
Country Code
USA
Point Of Contact
Type
primary
Email
brianna.n.wohlers@usace.army.mil
Phone
4029952668
Full Name
Brianna WOHLERS
Description Text
***UPDATE 7/15/26: Uploaded draft Contract Drawings. - On or about 27 July 2026, the Government intends to issue a solicitation for Gavins Point Raw Water Intake Zebra Mussel Mitigation. The solicitation will close on or about 26 August 2026. The solicitation is restricted to Small Businesses. Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via Section 00 21 00.Project Description: The contractor will supply all labor, equipment, and materials for installation of a new zebra mussel mitigation system. The scope of this project is to design a zebra mussel abatement system to protect the powerhouse raw water intakes and intake piping. The new design will utilize two small, local skids with spill containment near each raw water strainer within the powerhouse.Significant features of this design include:- Installation of two local tank skids and integral spill containment pallets- Installation of two pump skids for distribution? Power supply to distribution pumps and ancillary distribution system equipment- Interfacing of distribution pumps with the existing raw water flow metersThe Contractor will be required to commence work upon receipt of contract award and complete the work 210 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Estimated Construction Costs:The estimated construction cost of this project is between $250,000 and $500,000. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237110, Water and Sewer Line and Related Structures Construction, with a size standard for Small Business of $45M.Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (sam.gov). Find solicitation announcement in SAM.gov (sam.gov).1. Use the All Award Date to locate the project (by entering the solicitation number. 2. By using the login feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading Attachments/Links. Contracting Office Address:USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901Point Of Contact: All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance). Place of Performance:Gavins Point ProjectCrofton, NE 68730Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Response Dead Line
Jul 27, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.USACE.NWD.W071 ENDIST OMAHA
Place Of Performance
Zip
68730
Street Address
Crofton, NE 68730
Solicitation Number
W9128F26QA074

Source: SAM.gov (notice 93aed4aee64b4eb186efe95b5f5a92e3), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.