We post new hvac opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
BOU HVAC REPLACEMENTS
The contractor shall furnish all labor, equipment, and supervision to replace the HVAC system at the Office Building with a new heat pump system, relocate the heat pump system at the Coil Control Building, replace the broken cement slab behind the Coil Building, and replace the HVAC system supplying the Coil Building. Tasks include removal and disposal of old units, installation of new mini-split condensers and indoor head units, routing of refrigerant line sets, electrical, and condensate drainage, installation of underground ductwork, and ensuring systems operate per manufacturer guidelines. The contractor must also provide training to USGS personnel and maintain the work area clean.
"US""80225""DENVER""CO""USA""DEN FED CTR, PO BOX 25046, MS 204""Sol_140G0226Q0114.pdf"495359"file"".pdf""1""2026-08-03T15:39:12.544+00:00""b27b7bd188574ba99dcf54d0b8dcbc61""public""0""public""b7d5fee13e98461aabce3aee5521e3b5""0"3"0""B08_Atch_1_SOW_BOU_HVAC_052926.pdf"1367153"file"".pdf""1""2026-08-03T15:39:12.544+00:00""5dff8c0938c845a2b5d4013cc91f1277""public""0""public""392ecc4af94942f08a87a0a1e4aba565""0"2"0""B03_Atch_2_WD_CO20260017-05182026.pdf"228784"file"".pdf""1""2026-08-03T15:39:12.544+00:00""d51afeffb6e34c9caf57a82458825f60""public""0""public""2b111abcc12f4f1f859eb3a18c688957""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 927d51e64e324a41986a28c2839875ea), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.