We post new electrical opportunities in Kansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The contractor shall provide 3 front openings with 24’3” of travel that opens at 100 FPM. The new elevator shall be hydraulic, holeless, roped, single jack, cantilever, passenger elevator with a 4,500 lb capacity. The contractor shall comply with ANSI A17.1-2016 requirements.
The contractor must demolish and replace the existing MRL elevator and all associated mechanical room equipment. The new elevator must be a hydraulic, holeless, roped, single jack, cantilever, passenger elevator with a 4,500 lb capacity, providing 3 front openings with 24'3" of travel at 100 FPM. The system must be 100% non-proprietary to allow any elevator repair technician to perform future maintenance. The contractor must comply with ANSI A17.1-2016 requirements. The work includes furnishing all plant, labor, equipment, and materials, and requires a general contractor capable of managing construction scheduling, cost estimating, quality control, and subcontractor coordination.
"66027-1391""FT LEAVENWORTH""KS""USA""MISSION AND INSTI CONTRACTING""BLDG 338""Drawings 01_B246_20141219.pdf"7614211"file"".pdf""1""2026-08-10T18:23:35.224+00:00""508397556a6b4064b485f92cfeaf159a""public""0""public""06e2cab8e68b4821861d1a4484d134e1""0"6"0""Sol_W91QF4-26-B-A011 Elevator B246.pdf"6539898"file"".pdf""1""2026-08-07T18:36:27.105+00:00""9336dcaade8745439116d324dc5b1933""public""0""public""1f2c138a45f644529a90e98cc28dd14a""0"5"0""Construction Wage Determination_KS20260053_Building_20260518.pdf"209479"file"".pdf""1""2026-08-07T18:36:27.105+00:00""4e87af6a384741d38d339a7c80a04e19""public""0""public""a9400827e5c24cfbaaa6afecb30fb203""0"4"0""SOW_B246 Elevator Replacement Rev 2.pdf"282487"file"".pdf""1""2026-08-07T18:36:27.105+00:00""230c01f6df45472fa3b45d9bec5b4714""public""0""public""932a54f8b371476b875d9d8b64904b8d""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 9013898c5f9a4667a1a17da44187efb4), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.