The U.S. Department of the Treasury, Treasury Operations requires labor, tools, equipment, supplies and any other items deemed necessary to perform the Chiller Phase 1 HVAC Riser Survey as specified in the Statement of Work. Reference the enclosed Solicitation.
The contractor shall provide all labor, tools, equipment, supplies and any other items deemed necessary to perform the Chiller Phase 1 Main Treasury (MT) HVAC Riser Survey as described in the Statement of Work. This includes surveys to locate and identify HVAC risers and riser isolation valves to create an as-built drawing, conducting flushing and cleaning procedures on the perimeter fan coil units located on the first floor of the main treasury, and producing a set of paper drawings for contractor use and mark-up. Specific procedures include turning off fan coil units, removing enclosures, flushing and reverse flushing coils, reassembling enclosures, verifying operation, and producing as-built drawings with room numbers. On the fifth floor, the contractor must locate cooling/heating risers, verify locations against drawings, label risers, verify isolation valve locations and piping sizes, measure distances, and locate spaces for new isolation control valves.
We post new hvac opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20706""NEW CARROLLTON""MD""USA""5000 ELLIN ROAD""General Decision No. DC20260001.pdf"40306"file"".pdf""1""2026-08-20T20:43:24.099+00:00""38a52f1d963140be881f83e275de3272""public""0""public""24d72d470eac4094a6621f2a17e2b43f""0"3"0""ATTACHMENT 1 - Contractor Performance Sheet.pdf"246248"file"".pdf""1""2026-08-20T20:43:24.099+00:00""734b36e7aa594841804dbe221ce7f828""public""0""public""7ed1508571bf460c9a5bdff381682a4a""0"2"0""Solicitation no. 2032H326Q00068.pdf"814103"file"".pdf""1""2026-08-20T20:43:24.099+00:00""a5c73ddb1e2e4bb1a46f70de22262c2b""public""0""public""50ade6243c7e424193693f44fe15147c""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 8c331e052cf4433cac25d86acdbc1c07), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.