AM_0001 posted, 14 AUG 2026
Solicitation posted, 12 AUG 2026
The work consists of degradation of selected upland confined disposal area 22 along the Calcasieu Ship Channel which entails: clearing and grubbing, excavation, placement of borrow material on the existing CDF and foreshore disposal area on the channel side to the required grade, and all operations incidental thereto; all as shown on the drawings. The entire CDF and foreshore dike disposal area must be cleared and grubbed within right of way prior to degradation. The entire site shall be degraded to elevation 15.1 feet NAVD88. Excavated material generated from the CDF degrade operation shall be used as borrow material for low areas within the existing CDF and FDDA. Borrow material shall first be used to fill low areas within the existing CDF footprint prior to placement within the FDDA. Existing spill box to be moved 150 feet from existing stone dike when applicable.
We post new excavating opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"70118-3651""NEW ORLEANS""LA""USA""KO CONTRACTING DIVISION""7400 LEAKE AVE""W912P826BA068 AM_0001.pdf"354909"file"".pdf""1""2026-08-14T22:34:41.898+00:00""7f3e540172164626881cc126837405c8""public""0""public""57eb590b223744bfb801afccadc2ec72""0"3"0""W912P826BA068.pdf"6974114"file"".pdf""1""2026-08-12T23:18:45.949+00:00""8c981291de8143da9d9a48dc82cab61a""public""0""public""0d58090290d74e60a47444c629be0258""0"2"0""Plans.pdf"6088043"file"".pdf""1""2026-08-12T23:18:45.949+00:00""a161e0703ddd43af9aeb3e3cb2d87b28""public""0""public""34929ad1e1504eeab48ee4ce2eb13174""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 8af9192b2bb742b59ca13765e21bc973), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.