36C24226R0060
Amendment 3
630A4-26-401 MRI AHU Modification
There are 3 potential options for the MRI chiller:
Air cooled package at grade with glycol and pump package.
Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water.
Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only.
Does The VA have a preference for which system works better for them?
The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice?
There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load?
COR answer(s):
It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications.
Accordingly, a series pump configuration is not considered an acceptable design.
The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""36C24226R0060 0003.docx"19612"file"".docx""1""2026-07-23T15:24:42.833+00:00""e5673026e9f44aaaacb16994531dbf53""public""0""public""ba2250c4e3cb46eb9c5a9e41c9a4c76a""0"20"0""Phase II Proposals.docx"22913"file"".docx""1""2026-06-30T20:18:06.049+00:00""a63d1ca3f3684ebdb2a8e53c57a99317""public""0""public""22318e44d824456782c447182b6454e9""0"19"0""36C24226R0060 0002.docx"19599"file"".docx""1""2026-06-30T20:18:06.049+00:00""7f966c42ecb94a6caacdf7281926b8db""public""0""public""4191a260b0c2415dba97acf6032de3c4""0"18"0""36C24226R0060 0001.docx"19077"file"".docx""1""2026-06-18T18:59:35.437+00:00""4c03c06a45ae4533a7692a3f3d671971""public""0""public""a16c65425f0c4883a7f3d9a9c8548609""0"17"0""S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf"63997"file"".pdf""1""2026-04-27T15:58:09.256+00:00""9441b6f57b134471afdc36f5e626b7d3""public""0""public""5f74177b02dd4fe99c73e50443c38cb4""0"16"0""S02 Supplement A though C.pdf"631250"file"".pdf""1""2026-04-27T15:58:09.256+00:00""bc8b07792f3e4bf7805ed2312ffc3902""public""0""public""ac7d361c1ab54df288be501b3cd78cb8""0"15"0""S02 Specifications.pdf"621860"file"".pdf""1""2026-04-27T15:58:09.256+00:00""ae205b1f6b25499b962c49c6051a7d73""public""0""public""d78ee837b0be44c7a4316871a39597c7""0"14"0""P02 Drawings.pdf"3148331"file"".pdf""1""2026-04-27T15:58:09.256+00:00""3434c63ef97e405aa7f6ec38df1d1d28""public""0""public""f68c5acbab234c3e8da9ab8f7792db18""0"13"0""S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx"16056"file"".docx""1""2026-04-27T15:58:09.256+00:00""18776ee4ac9346a2b950dc4317fe4e41""public""0""public""f85fac03f67d4662906143100b4152a0""0"12"0""S02 Participation Goals for Minorities and Females 2.1.pdf"423796"file"".pdf""1""2026-04-27T15:58:09.256+00:00""94d3013d7a0d4ff4b0cab8d1cb800e33""public""0""public""5307f56267574a9cbc32536e1f95e8d2""0"11"0""S02 LIMITATION ON SUBCONTRACTING 2.1.docx"16379"file"".docx""1""2026-04-27T15:58:09.256+00:00""69ebbfeafb6d431e94239eb740754792""public""0""public""8df877f859634e6085a7645702a032a9""0"10"0""S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx"18109"file"".docx""1""2026-04-27T15:58:09.256+00:00""02984691a0cd474581bdb4d7c546df51""public""0""public""8802b770e2e348a5985ebca6e7fdb4c8""0"9"0""S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx"15321"file"".docx""1""2026-04-27T15:58:09.256+00:00""17b16c1a5ffb4d7e9114be9cd86d2980""public""0""public""bf0d88d7dc534eb5891ad7a040feae91""0"8"0""S02 AUTODESK Contractors Access Instructions 1.1.pdf"1198535"file"".pdf""1""2026-04-27T15:58:09.256+00:00""633ead327b6f4a9ea5d65944d638f94f""public""0""public""7eed498f8be44e169493a03e95639698""0"7"0""S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx"16635"file"".docx""1""2026-04-27T15:58:09.256+00:00""c9eb7b01de87497a9a5148f2310be793""public""0""public""bf44f769eaa946c9828890016c08be79""0"6"0""Instructions to Offers.docx"359957"file"".docx""1""2026-04-27T15:58:09.256+00:00""f8bd93871764436ba5b53e5ee0b10e41""public""0""public""04b5ca52f999498f84ad82cae3b5c214""0"5"0""SOW 12152025.docx"40037"file"".docx""1""2026-04-27T15:58:09.256+00:00""7b4f79764cfd437f8117191ddea7e348""public""0""public""f9f7a9aaca224ee7b03a2619abcd6f49""0"4"0""SCA 2015_4187_34 12032025.docx"8192680"file"".docx""1""2026-04-27T15:58:09.256+00:00""96b8b412ad964d1e8dc079721e6be67c""public""0""public""b32ac66f13754e9884e6d589a169d414""0"3"0""WD NY20260003 01302026.docx"5719080"file"".docx""1""2026-04-27T15:58:09.256+00:00""e5c5706191c54d04896e33f7d8681292""public""0""public""d6f991b583424ad6bcd5eef078aad65a""0"2"0""36C24226R0060_1.docx"127092"file"".docx""1""2026-04-27T15:58:09.256+00:00""7ba3e99ac8c44dccbd657eefbe237121""public""0""public""a4c7ece69f57488a8fba58d8c1ad79a9""0"1"0"Source: SAM.gov (notice 74bdad0f41934d01984710a36c9fa92c), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.