Read the notice and its 18 attached documents and pull out the scope, the deadlines and what you have to submit.
This is a combined pre-solicitation/solicitation for commercial service prepared in accordance with the format in RFO Part 12, following RFO 12.201-1 Simplified Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested. An award, if any, will be made to the responsible offeror who submits a quote that (1) conforms to the requirements of the pre-solicitation/solicitation; (2) that receives a rating of “Acceptable” on the Technical Capability evaluation factor; and (3) that submits the quote with the lowest total evaluated price (TEP), provided that the TEP is not unbalanced and is determined to be fair and reasonable. The Government reserves the right to award without discussions or to make no award at all depending upon (1) the quality of quotes received and (2) whether proposed prices are determined to be fair and reasonable.
The solicitation number is FA486126Q0025. This solicitation is issued as a Request for Quote (RFQ). A Firm Fixed Price type contract will be awarded.
The incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective 13 March 2026.
This combined pre-solicitation/solicitation is being issued as a Total Small Business set-aside, and the associated NAICS code is 541330- Engineering Services, Small Business Size Standard $25.5M.
Offeror’s shall provide a completed Price List (see “Attachment 2 – Price List”).
Below is the contract line-item number (CLIN) breakdown:
CLIN 0001 – Fire Sprinkler Testing - Buildings 10707, 10432 & 10440 in accordance with the performance work statement (PWS).
PLEASE SEE “Attachment 3 Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26” FOR MORE INFORMATION.
Period of Performance: 22 September 2026 – 21 November 2026.
Place of Performance: Nellis AFB, NV
Inspection and Acceptance: FOB Destination
Questions and offers will be due in email to yeury.castillo_pena.1@us.af.mil **AND **olivia.christiansen@us.af.mil. Questions will be due no later than 1630 PST on 02 September 2026 with email subject “FA486126Q0025 - 99 CES Fire Suppression Certification”.
List of Attachments
Attachment 1 – Solicitation - FA486126Q0025
Attachment 2 – Price List
Attachment 3 – Past Performance List of References
Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26
Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26
Appendices A - M
We post new life safety opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"89191-7063""NELLIS AFB""NV""USA""ADMINISTRATIVE ONLY NO REQUISITIONS""5865 SWAAB BLVD""Attachment 1 - Solicitation - FA486126Q0025.pdf"495230"file"".pdf""1""2026-08-25T22:32:58.061+00:00""73ec8602c7ba4b85b19853cb450a5a33""public""0""public""aabe190bb9dc45fe83028650fc29fd05""0"21"0""Appendix E - Nellis and Creech AFB IFS_22 Jan 2019.pdf"59187186"file"".pdf""1""2026-08-25T22:32:58.061+00:00""91e9a25ba08e462fbf053f0127241284""public""0""public""0c93bc4b6ffb4c759a4c6f760cb97a25""0"20"0""Appendix C - RKMF103011 BLDG 10432 Fire Sprinkler Shop Drawings.pdf"9714972"file"".pdf""1""2026-08-25T22:32:58.061+00:00""366e2881479f4a92b92018b2790663b7""public""0""public""cb5243c603374ed1a6a0cf8b11ba9441""0"19"0""Appendix I - Hydrazine Fuel Storage and Servicing Facility Specification 2144.pdf"6105536"file"".pdf""1""2026-08-25T22:32:58.061+00:00""fa0d3de178bb49918620e052d0cfb7b4""public""0""public""54a63df9539f4d7d9d177472ba9f0113""0"18"0""Appendix D - RKMF103011 BLDG 10440 Fire Sprinkler Shop Drawings.pdf"5280933"file"".pdf""1""2026-08-25T22:32:58.061+00:00""828c46b321c04c3abae2852edf2d5aa4""public""0""public""56f11b71095b42cc93832515d129da24""0"17"0""Appendix B - RKMF 103011 F-35 Muns As Built Drawings Sections Fire Plumbing.pdf"4750822"file"".pdf""1""2026-08-25T22:32:58.061+00:00""a2f27f8b233e4997a8a935d219f33453""public""0""public""63f94ac03e2f405a88e5d3c0b2faeaa6""0"16"0""Appendix A - RKMF 173010 As Built Drawings Sections Fire Plumbing.pdf"2641970"file"".pdf""1""2026-08-25T22:32:58.061+00:00""72c0c72d1b784485862cf78db901fc89""public""0""public""6723b301576e493280e0c2740ef978c9""0"15"0""Appendix J - Hydrazine Fuel Storage and Servicing Facility Design Analysis.pdf"542865"file"".pdf""1""2026-08-25T22:32:58.061+00:00""de72cdaf60d440579f742f78bbd6e891""public""0""public""8b9748ab1b3a45e88d55df8404d1c626""0"14"0""Appendix G - Nellis AFB Sole Source EMCS Letter.pdf"404917"file"".pdf""1""2026-08-25T22:32:58.061+00:00""ea8e2ef227dc454e99d66d831a2a9256""public""0""public""3572d6dbe59a4513a0e743e15e87f5e8""0"13"0""Appendix K - Hydrant Inspection and Flow Test Data Bldg 10701.pdf"209919"file"".pdf""1""2026-08-25T22:32:58.061+00:00""ea0119b4356a497baf73faa1fcf1545f""public""0""public""e9b72958194c4314866ac67afcdbb01e""0"12"0""Appendix F - Nellis and Creech AFB IFS Mech-Plumb Req_29 Dec 2025.pdf"252460"file"".pdf""1""2026-08-25T22:32:58.061+00:00""6d85ef8ae9c84840b012d33e1057689d""public""0""public""3b949beb24b44c73b6262502c4f832be""0"11"0""Appendix L - Hydrant Inspection and Flow Test Data Bldg 10432.pdf"204079"file"".pdf""1""2026-08-25T22:32:58.061+00:00""f8d926984b70477fa6ec95b4ed3fcec0""public""0""public""16256d7d3813447b89b17d6afcaaac96""0"10"0""Appendix H - Environmental Permit Guidance.pdf"122772"file"".pdf""1""2026-08-25T22:32:58.061+00:00""4927874e28f3426885bc6706d4900236""public""0""public""879ead5af24e4843ad553913bf27d171""0"9"0""Appendix M - Hydrant Inspection and Flow Test Data Bldg 10440.pdf"202668"file"".pdf""1""2026-08-25T22:32:58.061+00:00""6f3e1609a1544fff84aabe6db1e48472""public""0""public""40ba954356bd400bb696ae9a0aa8f7ba""0"8"0""Attachment 5 - SCA Wage Determination 2015-5593 Revision 32 - CAO 22 AUG 26.pdf"4217793"file"".pdf""1""2026-08-25T22:32:58.061+00:00""a22415ddc0c24e479b3c7e418b4ec98f""public""0""public""00f963930e544c0cab8c30ba30a3d07f""0"6"0""Attachment 4 - Performance_Work_Statement__Fire_Suppression_Certification - CAO 25AUG26.pdf"257512"file"".pdf""1""2026-08-25T22:32:58.061+00:00""ba5749ecd90144ceb6856b05a6744d0c""public""0""public""1fc256d88b4c4526912bc44964c28939""0"5"0""Attachment 3 - Past Performance List of References.pdf"114167"file"".pdf""1""2026-08-25T22:32:58.061+00:00""f2574fedb7d54010bf861d63ba7a8915""public""0""public""f905b4c332684b9bbe3925a134509f53""0"2"0""Attachment 2 - Price List.pdf"86261"file"".pdf""1""2026-08-25T22:32:58.061+00:00""361d1f5d0d964ba1bec75213ecfae69f""public""0""public""f4c1c6bd9a504e418b4b3a14ceb8b0b5""0"1"0"Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 711bb489e6744ce388008225eaf437d7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.