Read the notice and its 12 attached documents and pull out the scope, the deadlines and what you have to submit.
The agency seeks flood hydrologist consulting services for the purpose of performing in-depth reviewing/performing:
• Watershed hydrologic modeling and associated uncertainties;
• Probabilistic methods in estimating hydrologic hazard curves, including stochastic event flood modeling methods;
• Site Specific, Statewide/Regional and Hydrometeorological Reports (HMRs) based Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) analyses;
• Regional frequency analysis to derive Annual Exceedance Probability (AEP) of the precipitation and flood;
• Climate change impact analyses on extreme precipitation using Shared Socioeconomic Pathways (SSP) data and/or NASA Earth Exchange Global Daily Downscaled Projections; and
• Other flood hydrology-related analyses for dam safety.
Typical work efforts associated with the effort include but are not limited to:
• Review of submitted analyses, including digital files, prepared by Licensees or their consultants.
• Review of published data or reports from federal, state and local sources.
• Attendance at Board of Consultants meetings and project meetings.
• Provide expert advice to FERC staff on complex flood hydrology issues.
• Review proposed scopes of work developed by Licensees or their consultants for consistency with the FERC guidelines and state-of-the-practice procedures.
• Preparation of written reports as directed, with critiques, conclusions and recommendations.
• Review and comment on correspondence or other communications to Licensees prepared by FERC staff.
• Develop technical whitepapers to assist dam safety staff in reviewing/resolving complex technical topics
• Provide technical topic training to FERC staff
We post new professional & consulting services opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""20426""WASHINGTON""DC""USA""888 FIRST STREET NE STE 4J""WASHINGTON DC 20586""89603026Q0062 0001.pdf"197996"file"".pdf""1""2026-08-25T17:27:41.372+00:00""a0465805cc5441f3b8b6bd9ae148a9c5""public""0""public""c5e7e60bb70a4f54844ef51471c00a29""0"36"0""89603026Q0062 0001.pdf"85744"file"".pdf""1""2026-08-25T16:55:55.503+00:00""a8d846010d1e43b0b2038ab0009da3ad""private""2026-08-25T17:27:41.372+00:00""1""controlled""f4eaee00e0b94276a317d57162140316""1"35"0""2026-08-25T17:27:41.372+00:00""C. Attachment 2 - OCI Questionnaire.pdf"370767"file"".pdf""1""2026-08-19T13:25:41.48+00:00""3322d0c259cb4967affae78f12b11854""public""0""public""3ff6709d9be4459e9b0791596210bdd4""0"32"0""C. Attachment 3 - OCI Representation Disclosure Statement.pdf"132345"file"".pdf""1""2026-08-19T13:25:41.48+00:00""5a944dfff67f40e28abd14d7099e2689""public""0""public""0fe34b037a3d4721880c00598a981013""0"30"0""89603026Q0062.pdf"788419"file"".pdf""1""2026-08-19T13:25:41.48+00:00""2dc32a98059f4b24b2e0d0235d645822""public""0""public""0f4f7f0eaf014d2982c6291abfec935f""0"28"0""C. Attachment 1 - Statement of Work Flood Hydrologist Consultant.docx"46705"file"".docx""1""2026-08-19T13:25:41.48+00:00""658b7c83df534079990308f92b641cf1""public""0""public""3f0f83e6bab34698be3bb81b0a1fba04""0"27"0""C. Attachment 4 - Contractors CEII Non-Disclosure Agreement.docx"30838"file"".docx""1""2026-08-19T13:25:41.48+00:00""f3aeaf51dc224c818152de84aafe22c6""public""0""public""422dabd6133f48c7b27a0e74a6624a82""0"24"0""C. Attachment 5 - FERC NDA Contractors Employee Mar 2022.docx"35374"file"".docx""1""2026-08-19T13:25:41.48+00:00""13daa79ae71047a3b8cabf637204fd2f""public""0""public""187eecdaa6a04398982b9d4df3978512""0"23"0""C. Attachment 6 - FERC NDA Contractor Mar 2022.docx"25790"file"".docx""1""2026-08-19T13:25:41.48+00:00""0ee6722a17624af08220141d309cf53b""public""0""public""bbd9bd0d58aa49338ed97c6129e1795c""0"22"0""C. Attachment 7 - E.1 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO QUOTERS 071326.docx"66722"file"".docx""1""2026-08-19T13:25:41.48+00:00""ceb93fb92ea3495f81b9f839ae3676b0""public""0""public""a89e9a2c4902421ab67d84b304c97760""0"16"0""C. Attachment 8 - Pricing Template.xlsx"14189"file"".xlsx""1""2026-08-19T13:25:41.48+00:00""02fed477d99d4e7ea756e6ccab872dd0""public""0""public""673de016a40e4682bc480bd18b58739e""0"13"0""C. Attachment 9 - Past Performance Questionnaire.docx"55066"file"".docx""1""2026-08-19T13:25:41.48+00:00""da6753f4460247b0a112f0cb962df8ef""public""0""public""37e2590382594411be8205ebbed4a8f9""0"12"0""C. Attachment 10 - Questions Template.xlsx"19482"file"".xlsx""1""2026-08-19T13:25:41.48+00:00""4b4755ebdb4645bbb6014eeadb3785c8""public""0""public""5f7d2f45030d4ae1a9c0473038ca503f""0"7"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 703554f629024048a787cd7f98444845), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.