Read the notice and its 14 attached documents and pull out the scope, the deadlines and what you have to submit.
Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map.
Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments.
The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
We post new electrical opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""Attachment 11 - Site Visit Details.docx"82151"file"".docx""1""2026-08-19T19:15:59.058+00:00""bac9a4f1005b4c2a9fb0f4a50fa94307""public""0""public""9d808621156a4d19a543a8534284c6f3""0"35"0""Amendment 0002.pdf"85486"file"".pdf""1""2026-08-19T18:38:15.816+00:00""e9cce8e404e74a89925277fc1cb4f235""public""0""public""4e4d768a1cd04f8d8d529a6478b7d50c""0"34"0""Attachment 11 - Site Visit Details.docx"511078"file"".docx""1""2026-08-19T18:38:15.816+00:00""c44f36b7980d4d6cabc6d18b9d1a4f7e""public""2026-08-19T19:15:59.058+00:00""1""public""99b60431afe141289e92a434cb7572ff""0"33"0""2026-08-19T19:15:59.058+00:00""Amendment 0001.pdf"86702"file"".pdf""1""2026-08-13T16:35:53.458+00:00""1a396f566d3f4a149a63c4bca8c863d1""public""0""public""ff698de16a904c738cbd5117fa268314""0"32"0""Attachment 10 - Wage Determination.pdf"38399"file"".pdf""1""2026-08-12T19:50:37.969+00:00""eee849a5fed841f5bc75a60b95b18b3b""public""0""public""fe4420ecf28b40e48dd3a9d0d02a8951""0"30"0""Attachment 9 - Division Pricing Template.xlsx"10086"file"".xlsx""1""2026-08-12T19:50:37.969+00:00""939f1789f0dd4ecd9ff2dcefecc15b3b""public""0""public""b9ca2631ba6647f189d31b7bc460e289""0"29"0""Attachment 8 - Key Personnel.docx"103547"file"".docx""1""2026-08-12T19:50:37.969+00:00""30105bd64b2547f2af7f521aa0c166b6""public""0""public""27056e41e3984e26b37cf0281d3e630d""0"28"0""Attachment 7 - Key Subcontractor Information.docx"99985"file"".docx""1""2026-08-12T19:50:37.969+00:00""23cb541807304dd8a7ad290939590d79""public""0""public""94564948c1b24832acbb6c23ce023292""0"27"0""Attachment 6 - Limitations on Subcontracting - Construction.docx"28195"file"".docx""1""2026-08-12T19:50:37.969+00:00""e6bfcdb3d3774a5a8907d918c698deaa""public""0""public""c5c41c096fba4a78b0a6f1b30d09b9ff""0"26"0""Attachment 5 - Vol 4 Drawings.pdf"15249619"file"".pdf""1""2026-08-12T19:50:37.969+00:00""7fcb7f780f3b4262b761bd41254513dd""public""0""public""3b11fc9a93a1443abed17cbcdf674663""0"25"0""Attachment 4 - Vol 3 Drawings.pdf"13054349"file"".pdf""1""2026-08-12T19:50:37.969+00:00""19578ea8fbbf45b9a819ded19e8e6d6f""public""0""public""00e466c4eb1247efa7d177f1155980c4""0"24"0""Attachment 3 - Volume 2 Drawings.pdf"43369154"file"".pdf""1""2026-08-12T19:50:37.969+00:00""8a82b233bceb458abde0f934b7843c0a""public""0""public""9b80891ef5b44cafb169caae89d558fd""0"4"0""Attachment 2 - Vol 1 Drawings.pdf"15572873"file"".pdf""1""2026-08-03T20:05:33.779+00:00""352230b6cee842eb949238984fa0762f""public""0""public""faa59d8461a34f6eb0ee646fe379627c""0"3"0""Attachment 1 - Specifications.pdf"24215448"file"".pdf""1""2026-08-03T20:05:33.779+00:00""a49dde98fab941b19b5943a1988225f2""public""0""public""9bbe6430882746aabd7072f02b346f75""0"2"0""36C77626R0104.pdf"624949"file"".pdf""1""2026-08-03T20:05:33.779+00:00""61eed2d2672f4fbdb515d20fd06d14d7""public""0""public""f236a2597cae4ca5a612048a9b8879bc""0"1"0"Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 6c360bb647324178af78bac8612bab26), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.