Moved to full and open competition.
*** Grinders MUST be (Okamoto Corp USA Total Grinding Solution) Brand Name ONLY ***
Attachment 0001 - RIPD E4000-26-3-27 CNC Grinders must be filled out with "comply" or "non-comply" and submitted with quote to be considered for award.
The contractor shall furnish and deliver one (1) Okamoto model OGM-12.36UNCIII Universal CNC Cylindrical Grinder (CNC OD Grinder) and one (1) Okamoto model IGM-15NCIII/2B Precision Internal Grinder, Twin-Spindle, Boxer-Style CNC Grinder (CNC Twin Spindle ID Grinder), with an option for a second CNC OD Grinder. The contractor is responsible for all labor, materials, tools, and equipment necessary for complete installation, set-up, and start-up, including providing lubricants, coolants, anchoring mechanisms, and any decking or rail systems. The contractor must provide installation and preparation documentation (including footprint drawing, foundation drawing, installation drawing, electrical/pneumatic/hydraulic/water piping schematics, equipment identification), maintenance manuals (safety lockout procedure, preventive maintenance procedure), operator manuals, and environmental compliance data (SDS sheets, chemical list). The contractor shall provide operator training for 5 personnel, maintenance training for 2 personnel, and methods training for 4 personnel at the Rock Island Arsenal. The contractor must have a verifiable service/repair capability with on-site response within 48 hours and stock spare parts.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""B08_W519TC-26-Q-A173_CNC_Grinders_Solicitation_Amendment_0001_10SEPT26.pdf"4023746"file"".pdf""1""2026-09-10T18:59:21.995+00:00""671ae5d313534917aadf8848a2372566""public""0""public""a17d628b374a4cb1bb86c08b52a3c7e4""0"4"0""B08_W519TC-26-Q-A173_CNC_Grinders_Solicitation_19AUG26.pdf"3355924"file"".pdf""1""2026-08-19T17:40:19.47+00:00""83ab2aa5621a484b80d10e9f4105eb07""public""0""public""d5358d62148d4742bf66c86b199f9e0b""0"3"0""A03 Attachment 0002 CDRL CNC Grinders .pdf"555458"file"".pdf""1""2026-08-19T17:40:19.47+00:00""05714965aff64424a689808133323e1c""public""0""public""9d7d40e2ca6d48aeb935e2ba2810d219""0"2"0""A02 Attachment 0001 RIPD E4000-26-3-27 CNC Grinders.pdf"253815"file"".pdf""1""2026-08-19T17:40:19.47+00:00""b20a1c2f248e49dd8febccf310046903""public""0""public""95bb5d35aa734af5a5661c0d26d53e2a""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 60b0daca73214785b9a80cddfbb9424f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.