We post new life safety opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Complete Attachment 11, Non-Disclosure Agreement and return to the Contracting Officer (Brett Zeigler, brett.zeigler@fletc.dhs.gov) to obtain access to controlled documents in SAM
**Amendment 0002 issued 08/10/2026: **Provides Site Visit Sign-In Sheet, Site Visit Slides, and sets date for questions submittal from Offerors. Questions are due 08/12/2026 by 5:00 PM ET.
**Amendment 0001 issued 07/31/2026: **Provides responses to questions, provides Attachement 26 Past Performance Questionnaire, and Exhibit A. .
This Request for Proposal will result in a Single Firm Fixed Price Contract Award for Repair and Retrofit of the Fire Alarm System at multiple buildings on the Federal Law Enforcement Training Center, Glynco GA.
This acquisition is a 100% Small Business Set-Aside, under North American Industry Classification Systems (NAICS) Code 238210, Electrical Contractors and Other Wiring Installation Contractors.
A site visit is scheduled August 06, 2026, at 8:00am at FLETC Building 200. Upon arrival, attendees should report to the commercial gate a minimum of 30 minutes prior to the application screening process, then proceed to Building 200. All personnel who are not currently badged will need to complete and return Day Pass applications for all attendees no later than August 04, 2026, at 5:00pm to the attention of Project Manager, Ryan Dunnagan at ryan.dunnagan@fletc.dhs.gov Please coordinate receipt of badge applications and submission with Mr. Dunnagan.
Complete Attachment 11, Non-Disclosure Agreement and return to the attention of the Contracting Officer. In addition, request . The completed NDA is requierd to obtain access to controlled documents in SAM.
The contractor shall furnish all labor, materials, equipment, and supervision to replace existing fire alarm systems and associated devices/wiring, and commission new Notifier systems in accordance with NFPA 101 life safety occupancy standards. The work includes abandoning old SLC/NAC wiring in place where noted, installing new SLC and NAC communication cabling/wiring, and connecting all systems to the Notifier CLSS (Connected Life Safety Services) and Central Station Monitoring Software utilizing Gateway/Pathway communication devices. The contractor must also move and replace furniture for access, comply with all FLETC security and safety regulations, and complete the work within 120 calendar days after receiving the notice to proceed.
"US""31524""GLYNCO""GA""USA""1131 CHAPEL CROSSING ROAD""Site Visit Slides 70LGLY26RSSB00028 Multi-Building Fire Alarm Retrofit.pdf"10049933"file"".pdf""1""2026-08-10T16:29:06.481+00:00""2622e4831c1b4a428335e6bbb2cdf22b""private""0""controlled""2b050c804ce04625a239a11243f03579""1"115"0""Site Visit Sign-In Sheet 70LGLY26RSSB00028 Multi-Building FAS Glynco.pdf"937394"file"".pdf""1""2026-08-10T16:29:06.481+00:00""1a31690897034c69b5ae3e5c1cc1797b""public""0""public""382c1fc79c564d6683d99f52a58673e6""0"114"0""70LGLY26RSSB00028 Amendment 0002.pdf"208512"file"".pdf""1""2026-08-10T16:29:06.481+00:00""b668915b1fab4236827a8482e4138c6f""public""0""public""7ebda80cbc7f4521a211fcdffe9186b1""0"113"0""JA_Name Brand_Notifier Fire Alarm_Redacted.pdf"373104"file"".pdf""1""2026-08-03T18:28:25.809+00:00""9f4e5e62797c48cbb9f4792e2c3d7f1d""private""0""controlled""52fef157716446fdbfff441687e681bd""1"112"0""Att 26 Past Performance Questionnaire.pdf"128579"file"".pdf""1""2026-07-31T15:36:11.587+00:00""ca5f9a731e4e4fb99b2e1671d8dc214e""private""0""controlled""d3a4037ab54c49a8a131c35b647e75c3""1"110"0""Exhibit A - Proposal breakdown 70LGLY26RSSB00028.xls"40448"file"".xls""1""2026-07-31T15:36:11.587+00:00""1d16a5bdf03649b0aea1ca556c5ad7d0""private""0""controlled""1bd58089361b4a379c2e0125718c1029""1"108"0""RFI 01 RFP 70LGLY26RSSB00028 Amd 0001 Multi-Building Fire Alarm System Retrofit.pdf"47096"file"".pdf""1""2026-07-31T15:36:11.587+00:00""b6e835f690ad402da4aee950bb6ba092""private""0""controlled""56ecc9cbedfd4ff58b38ef6d9a21b36b""1"107"0""70LGLY26RSSB00028 Amendment 0001 Conform.pdf"601111"file"".pdf""1""2026-07-31T15:36:11.587+00:00""84f24ebc4b604f98bdd875e295800e0c""public""0""public""55a6a4cd34004dc8b86fd559e99300c5""0"106"0""70LGLY26RSSB00028 Amendment 0001.pdf"204134"file"".pdf""1""2026-07-31T15:36:11.587+00:00""b03473ae2c4f48ad9cb44ac056b74ca0""public""0""public""15164e7781a14de78de85b39b795a6a0""0"105"0""RFP 70LGLY26RSSB00028 FLETC Multi-Building Fire Alarm System Retrofit.pdf"601075"file"".pdf""1""2026-07-22T19:21:24.676+00:00""eea5b27cef014ad3a14ef69be569e82e""public""0""public""69fddf2ca7ed43099ef917ddd540fd5d""0"104"0""Att 001 Building Floor Plans.zip"6944293"file"".zip""1""2026-07-22T19:21:24.676+00:00""f729f0f28520491980a62b5c81fb35c5""private""0""controlled""bfb73e33e75b4567b73b819aea87cf7e""1"103"0""Att 001 Statement of Work and Specifications Multi-Building Fire Alarm 70LGLY26RSSB00028.pdf"414127"file"".pdf""1""2026-07-22T19:21:24.676+00:00""7af4339587cb4211b7b37b83d58d415f""private""0""controlled""e65fabfaa933458c988ac3be6cf2edb1""1"102"0""Att 002 SF25 Performance Bonds.pdf"726819"file"".pdf""1""2026-07-22T19:21:24.676+00:00""dcda6051782e4171a59ff8097c5e2688""private""0""controlled""a548e190f6b747559edf0a22754e6379""1"60"0""Att 003 SF 25A Payment bonds -.pdf"716931"file"".pdf""1""2026-07-22T19:21:24.676+00:00""87b5bd7390dc40c6b76341c661e04e6d""private""0""controlled""278c2f8cd9864923ab9e4ae04b3a9d33""1"59"0""Att 004 SF28 Affidavit of Individual Surety - Copy - Copy.pdf"707780"file"".pdf""1""2026-07-22T19:21:24.676+00:00""b8601b36dd514bdda362ff7b80b32638""private""0""controlled""c6fe2ec26e2f48a58fc35c2ac8a7baf4""1"58"0""Att 05 Format ILC -.pdf"476189"file"".pdf""1""2026-07-22T19:21:24.676+00:00""2231c2e6f033411489f5c35f28f1c980""private""0""controlled""a13377eaf08e4f07afd0762352799f00""1"57"0""Att 06 Format FIN INST ILC CONFIRM - Copy.pdf"537598"file"".pdf""1""2026-07-22T19:21:24.676+00:00""3918add0307944bcbc9263424aadf3a8""private""0""controlled""22aa85a5510140c18a14079d975c662c""1"56"0""Att 07 FMD_70 - Copy.pdf"50678"file"".pdf""1""2026-07-22T19:21:24.676+00:00""3afdf71c64bb42689e9031c1467bde22""private""0""controlled""d6610915666a4585851b211e0d859ac1""1"55"0""Att 008 Instructions for Completing WH-347 - Copy.pdf"621491"file"".pdf""1""2026-07-22T19:21:24.676+00:00""2bf3cdda111941e6bce3011f7d97a22e""private""0""controlled""76f2ae4c1b5c4686b272cd79bb9277cf""1"31"0""Att 009 WH 347 Wage and Hour Division - Copy.pdf"304738"file"".pdf""1""2026-07-22T19:21:24.676+00:00""b4ce9ae6ba4a46d08bf9432c6aef9e25""private""0""controlled""08015f70108747ebaac2f2e7129bf37c""1"30"0""Att 10 FMD_42 - Copy.pdf"31200"file"".pdf""1""2026-07-22T19:21:24.676+00:00""c4b6688059894cbeb0fd3af7e2333936""private""0""controlled""79ed23b909604420b795b2491457e006""1"28"0""Att 011 DHS 11000-6 Non-Disclosure Agreement - Copy.pdf"115202"file"".pdf""1""2026-07-22T19:21:24.676+00:00""464aafadcfc84cf38ddb038087775426""public""0""public""6e6296101b564fb19144e719f28297cb""0"20"0""Att 013 USCIS Form I-9 Instructions for Employment.pdf"297017"file"".pdf""1""2026-07-22T19:21:24.676+00:00""c0d96cf4c28b470ab2f52c31c2d99034""private""0""controlled""5e402b59d21240f6af48ed513fb6df28""1"18"0""Att 014 Eligibility Verification Form.pdf"524095"file"".pdf""1""2026-07-22T19:21:24.676+00:00""1a4e12ae851f45bea5c86ae7e1e1a5a8""private""0""controlled""71f66665811f4c37871c7b5c84aacc91""1"17"0""Att 015 Questionnaire for Non-Sensitive Positions.pdf"209833"file"".pdf""1""2026-07-22T19:21:24.676+00:00""14a78205b7fe4a06811a2928d97dcf6a""private""0""controlled""1b82b90b29524d03bcf2777b6cebbc2b""1"16"0""Att 16 Security Handout.pdf"241484"file"".pdf""1""2026-07-22T19:21:24.676+00:00""bcebb41a13504f0ba72db5f76e282e5f""private""0""controlled""56b8d12ce6de4faba0386739848fdca7""1"15"0""Att 17 Security Training List.pdf"514486"file"".pdf""1""2026-07-22T19:21:24.676+00:00""c382111ecd68490798bdbfdf1601a455""private""0""controlled""b52cb63d4cb84248bcbee7463df6e8b7""1"14"0""Att 019 Statement and Acknowledgment.pdf"703768"file"".pdf""1""2026-07-22T19:21:24.676+00:00""8dca3317fc9249cba95ecd25718e238f""private""0""controlled""101f4a96b33846a8a17dfef9d910a577""1"13"0""Att 020 SF1444 Request for Authorization of Additional Classification and Rate.pdf"715166"file"".pdf""1""2026-07-22T19:21:24.676+00:00""f9d129afa90a4fbd9edc64598ac63d4d""private""0""controlled""0837bd63fd7748b2ae9fcf8c44b3a199""1"10"0""Att 021 Bid Bond.pdf"720305"file"".pdf""1""2026-07-22T19:21:24.676+00:00""833f2a9aea844a09b4c35ee754343900""private""0""controlled""f4ceb360337c484ea26e745545abc56a""1"9"0""Att 022 SF LLL Disclosure of Lobbying Activities.pdf"2239480"file"".pdf""1""2026-07-22T19:21:24.676+00:00""00e4012997da425c9a15e708eea2806e""private""0""controlled""8261a0e71e5a472dbc3efc4a7250a098""1"8"0""Att 23 Financial Questionnaire.pdf"146500"file"".pdf""1""2026-07-22T19:21:24.676+00:00""df4340c5f00340b6aec2c0b77de1c15a""private""0""controlled""371b5e97a58a4b188b60e1625b4789a6""1"7"0""Att 024 700-3 Contractor Release Form.pdf"651419"file"".pdf""1""2026-07-22T19:21:24.676+00:00""f6e2d62dc3c14cb9ab232597d7fe2f39""private""0""controlled""6f3732dd898248fbade7de12c1d8e0ab""1"6"0""Att 025 WH DOL Poster.pdf"221629"file"".pdf""1""2026-07-22T19:21:24.676+00:00""3b679a15e19a464983851e359e93045d""private""0""controlled""5d744ada4c804b68ac591ba9ef1042b3""1"5"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 5961d22e4ed84d599816d0244dbcb89f), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.