Read the notice and its 18 attached documents and pull out the scope, the deadlines and what you have to submit.
N4008526R0177, DESIGN BID BUILD - BUILDING 114 CRANE 64 REPLACEMENT, NAVAL UNDERSEA WARFARE CENTER, NAVAL STATION NEWPORT, NEWPORT, RI
THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/ DESIGN-BIDBUILD (DBB), INDEFINITE DELIVERY /INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW LONDON, CT/ NEWPORT, RI AORs (CONTRACT NUMBERS N4008522D0021, N4008522D0022, N4008522D0023, N4008522D0024, N4008522D0025). FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, AINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
N4008522D0022 - Armitage SAI JV
N4008522D0023 - Black Horse Construction Group
N4008522D0024 - CCI Facility Support Services, LLC
N4008522D0025 - Doyon Management Services, LLC
CLIN 0001 Base Price work includes, but is not limited to:
a. Removing and disposing the existing 3-ton overhead bridge crane.
b. Providing a new 3-ton overhead electric traveling bridge crane. New crane configuration shall be top-running bridge with an under-running trolley hoist.
c. Replacing existing crane rails and crane conductors with new rails and conductors to accommodate two cranes operating on the same common rail system.
d. Replacing existing electric power infrastructure to crane with a new upgraded power feed that will support two new 3-ton cranes operating on the common rail system.CLIN 0002 Option Item No. 1 - Price includes the following:a.
CLIN 0002. Price for providing all work in connection with a second new 3-ton overhead electric traveling bridge crane in room 101 in Building 114, complete in accordance with the NAVFAC project drawings and technical specifications.
b. Option Item No. 1 includes providing a crane anti-collision sensor system for each of two cranes.
Amendment 0001, the amendment incorporates the following:
B114 Site Visit Sign In Sheet
Pre Proposal Inquiries and Goverment Responses
Amendment 0002, the amendment incorporates the following:
Final Pre Proposal Inquiries and Government Responses
Revised drawing set. Change was made to one note on drawing A1, A2, and A3 to clarify that existing W12x crane rail support beam remains for re-use. No ‘evaluation’ is required.
Revised specification sections
01 11 00 – Summary of Work. One sentence revised to clarify existing crane rail to remain.
41 22 13.15 – Bridge Cranes, Overhead Electric, Under Running Trolley. Wording was revised in 5 locations to clarify that the existing W12x crane rail support beams are to remain.
Proposal Due date extended to 14 AUGUST 2026 02:00 PM
Amendment 0003, the amendment incorporates the following:
• Updated Wage Determination RI20260001 7-30-2026
We post new metalwork opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Wage Determination RI20260001 7-30-2026.pdf"5972111"file"".pdf""1""2026-08-12T12:59:40.417+00:00""918e7f6b39e346a7b1cf9082c73c65fc""public""0""public""74295f34605b4124899806465d56a114""0"18"0""Govt Response - Amendment 0002 - Attachment 04 - Pre-Proposal Inquiry (PPI) 7-21-26.xlsx"24093"file"".xlsx""1""2026-07-30T11:52:47.705+00:00""8258e12c449943b98516b2854e34bf2d""public""0""public""10d2fbdd39384ea4939ec515b33dc45e""0"17"0""B114 Crane 64 FINAL DWGS REV2 28JUL26.pdf"8919514"file"".pdf""1""2026-07-30T11:52:47.705+00:00""b560334f3a6647feacc80ae9f6cab094""public""0""public""57eb8bbbc799404093ddfba205beae80""0"16"0""41 22 13.15 REV 1 28JUL26.pdf"193672"file"".pdf""1""2026-07-30T11:52:47.705+00:00""cda3a2ede970490786102c31da7fde42""public""0""public""087f482034df4a2aaf5c12208f458b82""0"15"0""01 11 00 REV 1 28JUL26.pdf"44779"file"".pdf""1""2026-07-30T11:52:47.705+00:00""4fae5b1f9b504577a02ea4a39219a079""public""0""public""4d9746d3b8f142bfb7b9c858182b2ee6""0"14"0""Amendment 0001 - B114 Site Visit.pdf"92527"file"".pdf""1""2026-07-08T14:49:21.852+00:00""6a5d6f634e094ea0ac3641e6d3dded82""public""0""public""fedb62f1d587479cad8fee250dfb4c6e""0"13"0""Amendment 0001 - Govt Response - Attachment 04 - Pre-Proposal Inquiry (PPI) form DMS 7-6-26.xlsx"21735"file"".xlsx""1""2026-07-08T14:49:21.852+00:00""8c64746d268341189991b4e4aa218510""public""0""public""f31c2c2e775d4d6e8ff23bc909105b85""0"12"0""Attachment 02 - Spec Rev 1 Final - Bldg 114 Crane 64 12-12-25.pdf"13402097"file"".pdf""1""2026-06-04T17:14:29.053+00:00""22a5d9196fc5480f8f4f435d5b465cbb""public""0""public""21c2f9de09494a5bafb57198f9a17191""0"11"0""Attachment 03 - Dwgs Rev 1 Final - Bldg 114 Crane 64 12-10-25.pdf"8440114"file"".pdf""1""2026-06-04T17:14:29.053+00:00""811db43a82ce4cb986fbe8cf6ddc27f2""public""0""public""e2c6aaa581e84904893514758366fdc7""0"10"0""Attachment 05 - WD RI20260001 5-18-26.pdf"5242880"file"".pdf""1""2026-06-04T17:14:29.053+00:00""367e5848c0cc42f8b9aa99ed08ceccc8""public""0""public""165d2c57eaba446cb2eeeaea805a5cee""0"9"0""Attachment 09 - SECNAV Form 5512-NSNPT.pdf"1090730"file"".pdf""1""2026-06-04T17:14:29.053+00:00""86b5286f3c0d44bca17d021fc18f4c6c""public""0""public""8ed0845a2d7b4d1ab7d5763103bc3c92""0"8"0""Attachment 07 - PIEE Vendor Access Instructions.pdf"521498"file"".pdf""1""2026-06-04T17:14:29.053+00:00""3f0d27f2f6664b4b9442002e527aaedc""public""0""public""aa64780d791b4cb99d580e09cbe30588""0"7"0""Attachment 01 26R0177 ML-C00073 MACC Cover NPT NLON.pdf"438031"file"".pdf""1""2026-06-04T17:14:29.053+00:00""d13ceecbdef540a68456b54ac0a536ef""public""0""public""7a1da775f6014ab2b6149595c50926cc""0"6"0""Attachment 11 - Base Access Email Template.pdf"299954"file"".pdf""1""2026-06-04T17:14:29.053+00:00""a6f94cfed5d74f9ca6938b5e27de097e""public""0""public""5a3d02988c8d497bb1ec009d2674951b""0"5"0""Attachment 08 - NUWC Visitor Request Information Guidelines.pdf"241307"file"".pdf""1""2026-06-04T17:14:29.053+00:00""c1420387438f4377a3592ca9912d3e59""public""0""public""c3f9f808f9354024a49e41a0291341df""0"4"0""Attachment 10 - Site Visit Instructions.pdf"142981"file"".pdf""1""2026-06-04T17:14:29.053+00:00""79dd14f8777242ee84c4c749dfaa5033""public""0""public""46e6851644fe473e9faa7f13f1781b38""0"3"0""Attachment 06 - Bid Schedule Bldg 114 Crane 64.pdf"14604"file"".pdf""1""2026-06-04T17:14:29.053+00:00""fba6628f240f4546b8f06ee13bb8dfd4""public""0""public""4e7728a8584244fb939696a2265097d4""0"2"0""Attachment 04 - Pre-Proposal Inquiry (PPI) form.xlsx"11638"file"".xlsx""1""2026-06-04T17:14:29.053+00:00""ef2753bf398a48049555609105b3fe26""public""0""public""ffb3d89a67ec4fc2abadc1b84763710e""0"1"0"Most Rhode Island work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 4d0d53f6bbf84044b5a814092d27588c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.