The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to abandon wells across the PNF, and close septic tanks, in accordance with the drawings, specifications, and other attachments referenced and contained herein.
Key Dates:
Site visit – 9/9/2026 at 10:00AM Local Time
Q&A’s Due – 9/14/2026 by 1:00PM Central Daylight Time
Quote Due Date – 9/23/2026 by 1:00PM Central Daylight Time
The Contractor shall furnish all supervision, materials, equipment, vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to abandon wells across the Prescott National Forest and close septic tanks per ADWR Well Abandonment Handbook and Arizona Administrative Code requirements. The base bid covers mobilization plus abandonment of ten specific wells/shafts (eight ADWR-listed wells and two non-ADWR shafts including Wilhoit Well Shaft and Tonto Springs Cistern), while option items cover five additional well abandonments, one contingent well abandonment, and closure of two septic tanks (including pumping at Tonto Springs). Work includes breaking apart and removing concrete, filling voids with earthen or grout material per ADWR standard/alternative abandonment methods, removing well casings, pumps, and plumbing fixtures, site cleanup, and submission of required documentation such as construction schedules, driller qualifications, and DWR completion reports.
We post new excavating opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""127EAX26Q0091 Forest Wide Well Decom.pdf"278513"file"".pdf""1""2026-08-28T18:04:20.557+00:00""0c1e5d3ac5d348e8ab66869534fb0422""public""0""public""5fadd77c37e34165ab9a1e0740376001""0"4"0""Attachment 1 - Statement of Work.pdf"23495182"file"".pdf""1""2026-08-28T18:04:20.557+00:00""b1e2f7958be54e75a5d73070fab84cbb""public""0""public""7bf3e448b5144d6488837e1cac18abf6""0"3"0""Attachment 2 - Schedule of Items.docx"111178"file"".docx""1""2026-08-28T18:04:20.557+00:00""bceadf723ad5434388df65ed57ec89a2""public""0""public""42c688505b5b49deb38a51857c7d693d""0"2"0""Attachment 3 - Wage Determination.pdf"311151"file"".pdf""1""2026-08-28T18:04:20.557+00:00""9ae26fcee3d140bd9691860710171d5f""public""0""public""d6db23d324bf4700a014938575672cc4""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 4cd1be9588a04278a666ab7361074eb9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.