Please see PWS for details.
The contractor shall provide all labor, materials, tools, and equipment to remove the old scissor dock lift and controller and install a new controller and scissor dock lift on the existing dock platform of the Postal Service Center at 2907 Tuskegee Airmen Ave, JB MDL, NJ. The new lift must meet specific technical specifications including a 72" x 120" platform, 5,000 lb capacity, 460V motor, and dedicated 60Hz circuit. The contractor is responsible for connecting the controller to existing electrical power, obtaining necessary permits and inspections, removing the old lift, restoring the site, disposing of hazardous waste per RCRA and NJDEP regulations, and repairing any damaged adjacent areas at no cost to the Government. All work must comply with Federal, state, and local codes including NEC, NFPA, BOCA, CABO, and OSHA standards, and must be completed within 90 business days from award plus material lead time.
We post new goods & materials opportunities in New Jersey as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"08641""JB MDL""NJ""USA""CP 609 754 2413""2402 VANDENBERG AVE BLDG 2402""Solicitation - FA448426Q0044.pdf"544868"file"".pdf""1""2026-08-27T21:05:33.208+00:00""b4ed4a0896c34155a485ce64819d3289""public""0""public""6a8aa3b3ee1b40899260cd55188b481e""0"6"0""SOW - Scissor Lift - 3 Aug 2026.pdf"151751"file"".pdf""1""2026-08-27T21:05:33.208+00:00""0871cc2ba26343418cadda7ba62ea3cf""public""0""public""c06aa4c2923d4dc7a743f370cafc68da""0"5"0""JB MDL Antiterrorism Awareness for Contractors Trifold 22APR 24.pdf"1284197"file"".pdf""1""2026-08-27T21:05:33.208+00:00""363a3d24c4ce46a3832c4a3ef27bfa7f""public""0""public""f3da94130ee447d5a180f697c8a616bd""0"4"0""JB MDL AT Awareness Guide for Contractors 22APR24.pdf"835720"file"".pdf""1""2026-08-27T21:05:33.208+00:00""1044b0b53b05419fb08280f1cb3b1478""public""0""public""911c879f04bd417db30f93945366af55""0"3"0""SFS Appendix - Contractor Security Appendix - BDP 4 Jun 26.pdf"265718"file"".pdf""1""2026-08-27T21:05:33.208+00:00""1823f7b275ae4d5e86a8165e4e6fc2b5""public""0""public""4ded697a3f454f32a788bc43f8189097""0"2"0""Medical Statement.pdf"82305"file"".pdf""1""2026-08-27T21:05:33.208+00:00""671493572fd245b6b5fa3e1be6459d7c""public""0""public""00931d759cc54d5fab631706afab1e9c""0"1"0"Most New Jersey work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 48e2b4ddf4744c31a566747d57c9727a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.