We post new general contractors opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Title of Project: 619A4-23-105, RENOVATE BUILDING 10
Project Overview: This project will renovate Building 10 at Tuskegee Campus to provide a secure, safe, reliable, and code-compliant facility to accommodate Community Care and all CAVHCS Call Center supporting operations. This project will support the additional staff required by the MISSION Act in the Community Care department. The Call Center will include sound baffling features within the space to ensure patient privacy and improve the staff’s ability to support patients over the phone. The current space and conditions do not fully support patient centric programs.
Amendment 01 - Posted on 8/5/2026
The contractor must furnish all supervision, labor, tools, hardware, equipment, safety, protection, drawing, rigging, commissioning, site visit and materials necessary for a complete renovation of Building 10. The work includes abatement of all hazardous materials, demolition of all existing utilities, finishes, fixtures, interior walls, floors, lighting, electrical distribution, HVAC equipment, fire/alarm systems, IT, and plumbing systems. The renovation includes removal and replacement of the building's structure, including floor and roof slabs and the roof assembly, while shoring up and retaining the exterior masonry walls. All windows and exterior doors will be replaced. The exterior front entrance porch and stairs will be removed and replaced with a porch reflecting the original design, and canopies will be added over entry doors at the east and west wings. The project also includes adding an elevator and new stairwells to meet current accessibility and exiting requirements, repainting concrete sills and banding, repointing brick veneer, and replacing copper gutters and downspouts tied into new storm water lines. The contractor is responsible for correct disposal of all materials and must coordinate disruptions with the COR.
"US""30904""AUGUSTA""GA""USA""ONE FREEDOM WAY""22 139 Drawings Vol1 100 SS 20260717.pdf"37825713"file"".pdf""1""2026-08-05T13:49:50.777+00:00""0450fa92a93c4760b89af12056538d2f""public""0""public""68c3d2341e0b474492f67cac21d7ebf7""0"14"0""22 139 Drawings Vol2 100 SS 20260717.pdf"21748129"file"".pdf""1""2026-08-05T13:49:50.777+00:00""237df5fa3c2f4a109f62b0b5e1295a11""public""0""public""d435fde21f214f91ba2cf105dcce7759""0"13"0""36C24726R0095 0001.pdf"94609"file"".pdf""1""2026-08-05T13:49:50.777+00:00""777d744cb5d04998a680c0d13e39e910""public""0""public""4794bdea1c8249978a8bd2af6b70b29b""0"12"0""22-139 Specs 100 BC 20250417.pdf"27218205"file"".pdf""1""2026-08-05T13:49:50.777+00:00""601f426be79b4a09918757413612dc87""public""0""public""b8c0e1e37fd54ca9b7ee75f9c3451939""0"11"0""22-139 100 BC SPC 20250414.pdf"1841686"file"".pdf""1""2026-07-31T19:03:28.487+00:00""7308172cc46148daad3c14fef01857e6""public""2026-08-05T13:49:50.777+00:00""1""public""1dbca0f6bb3a43f38951f43347aade2c""0"9"0""Attachment 7 - Combined Drawings 22-139 20250417.pdf"128328732"file"".pdf""1""2026-07-31T19:03:28.487+00:00""785e79e5037a4365a8a2c63aebf6918f""public""0""public""113b823c42be4f5b99b698e562781b5f""0"8"0""Attachment 5 - DBA Wage Rates_Macon County AL.pdf"1707141"file"".pdf""1""2026-07-31T19:03:28.487+00:00""1c4a1397f81b4c9bbeed58e086db83e7""public""0""public""04adbe07a23a489bbee331ac68db9beb""0"7"0""Attachment 6 - Invoicing.pdf"664980"file"".pdf""1""2026-07-31T19:03:28.487+00:00""b9521ee127c145bbb7c6367efa631940""public""0""public""6a90f381cbca4168a59a831f08b3ab09""0"6"0""Attachment 2 -VA Notice of Limitations in Subcontracting.pdf"634640"file"".pdf""1""2026-07-31T19:03:28.487+00:00""97fa645489e0404a8b409d62a30ff695""public""0""public""2b01f997cc8044559a8decce11ddee39""0"5"0""Attachment 1 - EMR.pdf"310203"file"".pdf""1""2026-07-31T19:03:28.487+00:00""5e7c0a1d926e4183ae87d5583b275807""public""0""public""be2aa15e56a64ec1af1aceb4afeff086""0"4"0""Attachment 4_Itemized Cost Breakdown example.xlsx"20162"file"".xlsx""1""2026-07-31T19:03:28.487+00:00""76571cb7874443f8a83350123787be3c""public""0""public""d785985d2be845a4bff8615ef7a7b9ec""0"3"0""Attachment 3 - Past Performance Questionnaire -PPQ.docx"24148"file"".docx""1""2026-07-31T19:03:28.487+00:00""47a9779611ed4e848dbc3d28555b7100""public""0""public""8d2fc564e0534e25bee71eaa317c9988""0"2"0""36C24726R0095_1.docx"473165"file"".docx""1""2026-07-31T19:03:28.487+00:00""20c213878f324f359a8690519ea6b70e""public""0""public""1c35ec66fd12475f9d44a0fedee607d8""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 412f84a04c3f4497a4f6c16ca836fa1e), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.