Amendment 1
04 Aug 26
Remove and replace the following Attachements:
Attach 1 - SOW Airfield Pavement 15 July 2026 with SOW Airfield Pavement 4 Aug 2026
Attach 8 - Airfield Pavements Bid Schedule with Updated Airfield Pavements Bid Schedule
Attach 9 - SOW 1157746 Repair Airfield Spalling DV Ramp 15 July 2026 with SOW Taxiway Golf 4 Aug 2026
Additionally, the Combo Synopsis Solicitation document was updated to reflect the changes in red.
There will be no extension.
End Amend 1
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
The contractor shall develop and compile task order proposals based on data and information received from the Government but shall independently verify quantities. Work will consist of a broad range of maintenance, repair, and construction of runway and airfield pavements on Whiteman Air Force Base (WAFB).
Please see full solicitation details at attachments.
Work will consist of a broad range of maintenance, repair, and construction of runway and airfield pavements on Whiteman Air Force Base (WAFB). The contractor shall develop and compile task order proposals based on data and information received from the Government but shall independently verify quantities. The bid schedule includes items such as asphalt crack sealing, concrete crack sealing, concrete joint sealing, subgrade stabilization, controlled low strength material, core drilling, spall repair (concrete and epoxy), slab replacement, saw cut asphalt pavement, asphalt mill and overlay, asphalt replacement, asphalt slurry seal, removal of painted airfield markings, airfield stripes (non-reflective, reflective, and reflective with type III beads), aircraft tie-down and grounding points, groove runway slabs, and airfield lighting.
"65305-5344""WHITEMAN AFB""MO""USA""CP 660-687-5417""660 TENTH STREET STE 222 BLDG 709""FA462526Q1062 Combo Synopsis Solicitation.pdf"211883"file"".pdf""1""2026-08-04T21:46:04.325+00:00""e28a8591a87f46f5b8aa61be6789037d""public""0""public""1cef20df23294f14aa8290a76d42c6ef""0"82"0""FA462526Q1062 Combo Synopsis Solicitation.pdf"215695"file"".pdf""1""2026-07-24T14:16:01.433+00:00""a4f68e5d2cb3439098da85557f182e28""public""2026-08-04T21:46:04.325+00:00""1""public""ee4cff1ddeee40739ee7252e2498a1dc""0"81"0""Attach 1 - SOW Airfield Pavement 15 July 2026.pdf"365105"file"".pdf""1""2026-07-24T14:16:01.433+00:00""54f80d489d3f4e74aa1e482605144426""public""2026-08-04T21:46:04.325+00:00""1""public""2842ef90c4d64e698e562e2528a1367c""0"76"0""Attach 1 - SOW Airfield Pavement 4 Aug 2026.pdf"1543654"file"".pdf""1""2026-08-04T21:46:04.325+00:00""ac1867227e93421a931d08a84613d969""public""0""public""b215f59dff4647cd8881ddb4375f35a5""0"71"0""Attach 2 - SOW Atch 1 - WAFB - Security Procedures for Construction Contracts.pdf"2116673"file"".pdf""1""2026-07-24T14:16:01.433+00:00""ac3c5444eeb042e8b9cedf779e3e35fa""public""0""public""759713ab62c449c5a3f3c0278f1603d4""0"70"0""Attach 3 - SOW Atch 2 - WHITEMAN AIR FORCE BASE Supplement (16 August 2023).pdf"153934"file"".pdf""1""2026-07-24T14:16:01.433+00:00""eaab0c6769864262be3a3c42512b1e1e""public""0""public""09ac6cb4291f42cb8225548cd6233078""0"63"0""Attach 4 - SOW Atch 3 - TSPWG M 3-250-04.97-05 12 August 2019.pdf"1053786"file"".pdf""1""2026-07-24T14:16:01.433+00:00""9f7688a3d24142a69b330d8442e905fc""public""0""public""c66a98f17ad0460ab7de29b92306e191""0"56"0""Attach 5 - Past Performance Questionnaire.docx"49850"file"".docx""1""2026-07-24T14:16:01.433+00:00""049ee63949db48f7b0ba06f6db00ce15""public""0""public""7a3ca99941f64750b6ea8dc1166b4050""0"49"0""Attach 6 - General Decision Number MO20260001 18May2026.pdf"1721456"file"".pdf""1""2026-07-24T14:16:01.433+00:00""3d4e67257c264bea908fbb8b1a0ec3ef""public""0""public""03e2be911de5433688d8f2689192d3f7""0"42"0""Attach 7 - Provisions and Clauses.pdf"117859"file"".pdf""1""2026-07-24T14:16:01.433+00:00""48819683f34442ae8bd368f82ab9afde""public""0""public""2e7efc008d8246af8f7caa38384026e4""0"35"0""Attach 8 - Airfield Pavements Bid Schedule.xlsx"38803"file"".xlsx""1""2026-07-24T14:16:01.433+00:00""36b25b3cb1144337ad8ac398276fc06c""public""2026-08-04T21:46:04.325+00:00""1""public""b41fe46bdd2c42b2bed43bacc3624a50""0"33"0""Attach 9 - SOW 1157746 Repair Airfield Spalling DV Ramp 15 july 2026.pdf"833813"file"".pdf""1""2026-07-24T14:16:01.433+00:00""2c952fb0b76d44f0b3f1834e347ad927""public""2026-08-04T21:46:04.325+00:00""1""public""4c4dcb12e6764cf8a03d9724b55b46da""0"32"0""Attach 8 - Airfield Pavements Bid Schedule.xlsx"34709"file"".xlsx""1""2026-08-04T21:46:04.325+00:00""b378e6c7fdf14a78b176768680f75f41""public""0""public""a396b9261cfd4c94b035b1d57a5fbbce""0"30"0""Attach 9 - SOW SEED Taxiway Golf 4 Aug 2026.pdf"1543654"file"".pdf""1""2026-08-04T21:46:04.325+00:00""8f775192410f4bfcbcbaebdafd916a59""public""0""public""3028834cf6ff48d897074de48d7d1aeb""0"29"0"Source: SAM.gov (notice 384d8beea2044c03b236707047a2d813), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.