AB852489 IE148 D-B BLDG 135 PLAYGROUND
The contractor shall furnish all necessary personnel, supervision, materials, equipment, services and facilities to perform the Playground Hazard Mitigation at SIPI in Albuquerque, NM. The work includes: (1) demolition and replacement of the existing playground soft surface (approx. 2000 sqft) with a new soft surface, releveling subsurface, checking playground equipment bolts; (2) repainting of the fence around the playground area, including removing chain link mesh, preparing and applying vinyl coating to posts and rails, and installing new vinyl coated chain link mesh; (3) installation of a shade system for toddler swings, with two design options; (4) installation of new wood chips around the swing area (approx. 1100 sqft). The contractor must provide design-build services including engineering design, and comply with all applicable codes and standards.
We post new other opportunities in New Mexico as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""87104""Albuquerque""NM""USA""1011 INDIAN SCHOOL RD. SUITE 352I""Sol_140A2326Q0244.pdf"513873"file"".pdf""1""2026-08-14T15:46:22.798+00:00""c3db170845ce407da38e21ae8ae7dd2b""public""0""public""e565ea34cc274b9ea26f8f56fdf53e1a""0"10"0""Attachment_1_06_16_26_SOW_Playground_Hazard_Mitigation__FINAL.pdf"241050"file"".pdf""1""2026-08-14T15:46:22.798+00:00""f75f417519644ef592974ac7c2a5e425""public""0""public""1fbbc4a6b4a047febac97543778f2e20""0"9"0""Attachment_2_Playground_Reference_Drawings_and_Pictures.pdf"19637980"file"".pdf""1""2026-08-14T15:46:22.798+00:00""63812c2704ad4adebda6173412a13e42""public""0""public""68ef4db5ab1d43289d679ea24d3542bd""0"8"0""Attachment_3_SF24_Bid_Bond.pdf"741038"file"".pdf""1""2026-08-14T15:46:22.798+00:00""bfab5c90ff4d41a2b3abebea9b803773""public""0""public""d6f3cfced041494598db4e26e13f79c3""0"7"0""Attachment_4_SF25_Performance_Bond.pdf"760451"file"".pdf""1""2026-08-14T15:46:22.798+00:00""aada08f41ed44a89a26f3ca1ab66d4e3""public""0""public""d081c43e19bd46e3940771c98edc723e""0"6"0""Attachment_5_SF25A_Payment_Bond.pdf"750291"file"".pdf""1""2026-08-14T15:46:22.798+00:00""7e4b8040f98f4b00bdb4ecad1b465b3d""public""0""public""b67db7dd77e840d6a9a5219bc203d36f""0"5"0""Attachment_6_SF1413_Statement_and_Acknowledgement.pdf"786731"file"".pdf""1""2026-08-14T15:46:22.798+00:00""534b5079cf03427aacf80c436dc4ebfa""public""0""public""3b1ea966432a43ab8f7d1b0453284c2c""0"4"0""ATTACHMENT_7_Wage_Determination_NM20260038.pdf"1600904"file"".pdf""1""2026-08-14T15:46:22.798+00:00""fd5ea4a1780b4a67a1b5ae6cee871e3a""public""0""public""546dc65a39094dec8c04b4a538beb1bb""0"3"0""Attachment_8_IA_-_IEE_Representation_Form.pdf"29473"file"".pdf""1""2026-08-14T15:46:22.798+00:00""a1678f34687842f8af83e5807ab627fe""public""0""public""5a37458871c24501b7520af7047b142a""0"2"0""Attachment_9_RFP_Questions_and_Answers_Log.xlsx"19069"file"".xlsx""1""2026-08-14T15:46:22.798+00:00""5b35e8dbc09a4ac388d5e22e4399bc67""public""0""public""a9dfff7c8d2d4d61b13ce38ff833de29""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 26c22f6e36b9451e81f0f03551edbf71), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.