The intent of this work order is for the Contractor (CTR) to provide all labor, materials, equipment, and supervision necessary to execute exterior repairs, specifically addressing caulking and grout cracks across multiple designated walls.Only the MACC holders listed on the first page of the solicitation may submit a proposal for this project. See attached RFP for addtional information.
The contractor shall install two new control joints in the exterior south wall with backer rods and sealant, widen the middle control joint in the south wall to a minimum of 1/2 inch with new backer rod and sealant, remove and replace existing sealant in seven additional control joints (approximately 30 feet each) ensuring a minimum sealant depth of 1/2 inch, repair damaged Exterior Insulation and Finish System (EIFS) at the top of the wall, and remove all debris and trash from the site.
We post new exterior maintenance opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""Master PPI Form.xlsx"22125"file"".xlsx""1""2026-08-14T14:06:27.391+00:00""9ef6abd742034a83b496fc98b89774e9""public""0""public""015696fbdfe649ca9d436fa446e55b56""0"3"0""7584668 RFP.pdf"281544"file"".pdf""1""2026-08-14T14:06:27.391+00:00""d3af27eb29f24669be9a71d7f71171e3""public""0""public""ec7bc5314a124c00aee9e099a6c9d72c""0"2"0""7584668MACC STATEMENT OF WORK.pdf"594546"file"".pdf""1""2026-08-14T14:06:27.391+00:00""1936dcf731304913974839904bc70a86""public""0""public""edfee4ada95d412282a8309e527d210c""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 237e862cfd0246e3b2448c14d34a8cea), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.