Generate a quick AI overview of this bid, pulled from its details and the attached documents.
Extension to due date. Due date is now 8/4/2026.
Please note this is an RFP not Sealed bid solicitation.
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Emergency Generator and Building. The emergency generator at Retamal Dam is no longer working and rreplacment is necessary. The new generator will be housed in a metal building installed on a new concrete pad with a modern diesel fuel tank.
The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing.
The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work on site during these proposed hours. USIBWC facilities, including the dam, are closed during all federal Holidays.
Workers must pass though USIBWC levees to access Retamal Dam. Boarder Patrol are present in the area. Contractor and subcontractor shall have identifying vehicular when working in the area. US Fish and Wildlife own land adjacent to Retamal Dam. Contractor shall stay clear of US Fish and Wildlife property.
A site visit date is listed in the Solicitation. A completed Form 358 is also required prior to attendance at the prebid site visit.
Section 01.78.36 requires a warranty of at least 5 years for Generator and Automatic Transfer Switch. 20 years for shingles/Roofing and Roof system.
This Solicitation will be issued pursuant to FAR Part 14. All responsible sources must submit a bid to be considered by the Agency.
"85365""YUMA""TX""USA""U.S. SECTION, YUMA FIELD OFFICE""2995 S. PACIFIC AVENUE, SUITE A""191BWC26R0005 0001.pdf"485630"file"".pdf""1""2026-07-27T21:59:57.327+00:00""a6ffc5f146a04045a51b2ba09a22c3ec""public""0""public""02179a052c9c4d79b18c40c0303ba1d0""0"23"0""Qualifications.docx"20130"file"".docx""1""2026-07-27T21:59:57.327+00:00""f3c9ff535091417f9de067faac1ebe38""public""0""public""4ba887f8a331406989fa4628cdf704cf""0"22"0""IBWC Form 245C Minimum Qualifications for Award (Performance of Work By Contractor).pdf"113399"file"".pdf""1""2026-07-16T15:20:44.157+00:00""9cdee4ecd2a84afaa64c2a9a63eee4c9""public""0""public""3b2625730e1e43d882264286920bd5b4""0"21"0""Retamal Generator Sign in Sheet.pdf"392519"file"".pdf""1""2026-07-16T15:20:44.157+00:00""317975e608bc4729a29b2bf2ce9a7dec""public""0""public""3f792f3ba4a846ac9958c271fbc48712""0"20"0""RFI_Response 2.docx"31503"file"".docx""1""2026-07-16T15:20:44.157+00:00""228207c1fe364500bb2880a91c71a4d3""public""0""public""cf44996946e642f18adaf24a355f5aeb""0"19"0""191BWC26R0005.pdf"322943"file"".pdf""1""2026-07-16T15:20:44.157+00:00""1057a053b2e242169a5b2b25afe74c8b""public""0""public""7ef447a0ad254011b36e7bc28eafbfd0""0"18"0""Qs and As.docx"1873515"file"".docx""1""2026-06-25T21:39:12.863+00:00""5993879edeb64bcf8ed84650cc999b11""public""0""public""9d9169eb1a344107ba7e65ff7d3882e9""0"17"0""Translated Technical Report.pdf"1704835"file"".pdf""1""2026-06-25T21:39:12.863+00:00""47755adb7a51457a86c8f67822b2aa6c""public""0""public""8afe51a31c204fe7b28516b85d40d3ea""0"16"0""Existing Utilities As Built.PDF"93008"file"".pdf""1""2026-06-24T20:25:15.352+00:00""90b045e99d264125946efbdee7286592""public""0""public""4d56f5480af4475aab47bbf842f071ee""0"15"0""IBWC 110 Certification of Authority for Signing Bids.pdf"222301"file"".pdf""1""2026-06-04T19:08:16.982+00:00""a675175e17ef47328191eadd3453b645""public""0""public""a893147faff545ae91446a85f48f3c7a""0"13"0""IBWC 116 Stmt of Equipment.pdf"45016"file"".pdf""1""2026-06-04T19:08:16.982+00:00""8de48c23ad7b42f9b9e94fb613e78bf8""public""0""public""e3fc2a4c731c47f5b0fede7d4d54f593""0"12"0""IBWC 117 Pre-Bid Conference Attendence.pdf"207025"file"".pdf""1""2026-06-04T19:08:16.982+00:00""2ecc201d835e4ef3961ef2bfcd238705""public""0""public""0524ae4f1e7e4bcf8bbbb99877da26c3""0"11"0""Retamal Dam Generator DB Specs Final 326.pdf"4588223"file"".pdf""1""2026-06-04T19:08:16.982+00:00""3388c6f38b704f38aa263fe3f69172d0""public""0""public""181556083a5344d7b08f5f8a0bfbc62e""0"10"0""IBWC Form 245A Minimum Quals for Award Joint Venture.pdf"211483"file"".pdf""1""2026-06-04T19:08:16.982+00:00""1df12b712e4f4861876aa62e7872ec9d""public""0""public""b58e2b63c0a44878ba42a45878eda262""0"9"0""IBWC Form 245 Minimum Qualifications for Award.pdf"165650"file"".pdf""1""2026-06-04T19:08:16.982+00:00""7b346c0c791d462c92279250b54febcc""public""0""public""4bb56392f7f44d9fb3fa23c26be2ed30""0"8"0""IBWC Form 245B Backup Information.pdf"61309"file"".pdf""1""2026-06-04T19:08:16.982+00:00""b0cb55f19daa46779745383852c99093""public""0""public""70c7356d56a54c00b6b92b6b8916fc72""0"7"0""Wage Determination.pdf"206262"file"".pdf""1""2026-06-04T19:08:16.982+00:00""990d9174eab84db7bdfbb3f63e51327a""public""0""public""338aab05d6fa4cbcbfb9e981bba27045""0"6"0""IBWC Form 358 Nondisclosure Agreement SBU.pdf"204391"file"".pdf""1""2026-06-01T21:32:40.066+00:00""9735e7125ad444a18a952e495d4bc37b""public""0""public""bf1197d9a3324f7985cef78e60b259c7""0"3"0""IBWC Form 358A Nondisclosure Agreement Release SBU.pdf"88989"file"".pdf""1""2026-06-01T21:32:40.066+00:00""38b5ca169c0a43659a14c14913510dc8""public""0""public""251cd29d939b46c1be6a48ac467cfc6a""0"2"0"Source: SAM.gov (notice 23252626bbcb4ee68fceab03a04fec65), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →