Read the notice and its 18 attached documents and pull out the scope, the deadlines and what you have to submit.
Amendment 0002 - The purpose of this amendment is to upload Attachments 05 - 08 as well as additional apendix A - I. There are three Controlled Unclassified Information (CUI) documents pertinent to the solicitation. Offerors who are interested in receiving these documents must return a signed copy of Attachment 07 - CUI NDA - 9.11.26 to the Contracting Office and have a current (not older than three years) self-assessment score in the Supplier Performance Risk System (SPRS) of 110. If the offeror does not have a score of 110, they must have a Plan of Actions & Milestones (POA&Ms) filed in SPRS.
Amendment 0001 - The purpose of this amendment is to extend the solicitation due date from 9 September 2026 to 15 September 2026 at 9:00 AM CDT as well as upload an updated combined solicitation to reflect the extension (Combined Solicitation Ver 2 - FA4600Q0101 - 9.8.26).
This is a combined presolicitation/solicitation for commercial SERVICES in accordance with the format in Revolutionary Federal Acquisition Regulation Overhaul (RFO) Subpart 12.202(b)(1), as supplemented with additional information included in the notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate solicitation will not be issued.
Solicitation number FA4600-26-Q-0101 is issued as a Request for Quotation (RFQ) for The Contractor to provide all management, labor, materials, equipment, and supervision necessary for cost-effective operations, maintenance, and repair of the SATCOM Campus. This includes all Real Property (RP), Real Property Installed Equipment (RPIE), and associated systems. The Contractor's services shall prevent deterioration beyond normal wear and tear to ensure the facility always remains mission capable.
This acquisition is set aside for a small business concern under NAICS 561210, Facilities Support Services. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. All prospective offerors must be registered in the System for Award Management (SAM) at www.sam.gov. Lack of a SAM registration will make an offeror ineligible for award.
APPLICABLE LABOR LAWS
This solicitation is subject to the Service Contract Labor Standards RFO 52.222-41 and the current wage determination, Service Contract Act WD #2015-5005, Revision 28, Revised on 12 May 2026. The most updated wage determination can be found at https://sam.gov/wage-determinations.
SITE VISIT
A site visit will take place on 31 August 2026 from 8:00 AM – 12:00 PM CDT. See Attachment 03 – Site Visit Info and Protocol – 8.13.26 for more information on the site visit. Attendees must fill out Attachment 04 – Site Visit Entry Form – 8.13.26 and return to the contracting office no later than 28 August 2026 at 9:00 AM CDT to ensure base access for the site visit.
QUESTIONS DUE DATE AND TIME
All questions concerning this solicitation shall be sent in writing to the Contracting Office by 3 September 2026 at 9:00 AM CDT. Answers to all questions will be posted via amendment to www.sam.gov as soon as readily available.
OFFER DUE DATE AND TIME
All offers must be submitted to the Contracting Office by 15 September 2026, 9:00 AM CDT.
CONTRACTING OFFICE CONTACT INFORMATION
All information regarding this solicitation shall be sent by email to:
Contract Specialist – 2d Lt Liv Nemeck, liv.nemeck.1@us.af.mil
Contracting Officer – Daniel Kuchar, daniel.kuchar@us.af.mil
We post new hvac opportunities in Nebraska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"68113""OFFUTT AFB""NE""USA""BLDG 323C CP 402 232 6459""106 PEACEKEEPER DR STE 2N3""Combined Solicitation Ver 2 - FA460026Q0101 - 9.8.26.pdf"660287"file"".pdf""1""2026-09-08T19:20:19.706+00:00""61bb0a0dba1b459eac7111a1309fe47d""public""0""public""cf8ff2b1cfd341b0ba0e7bef082cf2bf""0"200"0""Attachment 01 - PWS - 6.15.26.pdf"397858"file"".pdf""1""2026-08-14T19:50:03.559+00:00""09c76ccab5aa4ebba96bfe20a280b240""public""2026-09-11T20:05:07.644+00:00""1""public""1cc9120169734bf48e35df8f44d93277""0"184"0""2026-09-11T20:05:07.644+00:00""Attachment 01 - PWS v3 - 9.11.26.pdf"408712"file"".pdf""1""2026-09-11T20:05:07.644+00:00""e05f2a1af3364095bd0159f2078ceab3""public""0""public""3fe049089c464d73bc7d6dec5b62b8ef""0"168"0""Attachment 02 - Wage Determination 2015-5005 Rev 28.pdf"257510"file"".pdf""1""2026-08-14T19:50:03.559+00:00""850b7fca96a84292a75ac4167988649c""public""0""public""e15f7a4e481245dcb5317f8ca558e746""0"166"0""Attachment 03 - Site Visit Info and Protocol - 8.13.26.pdf"419825"file"".pdf""1""2026-08-14T19:50:03.559+00:00""59298946e59547f69ab49d2b20df362f""public""0""public""730e293b68f64bb8bc9447c371ff673a""0"149"0""Attachment 04 - Site Visit Entry Form - 8.13.26.docx"34733"file"".docx""1""2026-08-14T19:50:03.559+00:00""8248ef59e16d4e178ec5803ee0f51aa5""public""0""public""be37811451f640659205abc9e5f274e9""0"127"0""Attachment 05 - Questions and Answers - 9.11.26.pdf"139811"file"".pdf""1""2026-09-11T20:05:07.644+00:00""d4782ead13b2425e8f81c51142ac4ab4""public""0""public""d6303a00d47d4b258de225fcdea12bc8""0"111"0""Attachment 06 - Spare Parts List - 9.11.26.pdf"126264"file"".pdf""1""2026-09-11T20:05:07.644+00:00""105a59e8973945aba53b814d34ef69f5""public""0""public""7794e0311b3647e3a7391c6e608a8778""0"85"0""Attachment 07 - CUI NDA - 9.11.26.pdf"211387"file"".pdf""1""2026-09-11T20:05:07.644+00:00""81a0ad412e3346ceb538836721497fec""public""0""public""ef9883e8a41d43e796037d713af99bca""0"83"0""Attachment 08 - Asset List (SANITIZED) - 9.11.26.xlsx"24593"file"".xlsx""1""2026-09-11T20:05:07.644+00:00""0432253a391447c1936e30d33bf1c7f9""public""0""public""c177a8a8ab484b479d9705682c0a3ec3""0"53"0""Appendix A - Customer Complaint Record.pdf"1058304"file"".pdf""1""2026-09-11T20:05:07.644+00:00""89c675411d7442558f11fddb0a636e08""public""0""public""af8d4a303121481faf068979a864d7f6""0"52"0""Appendix B - Corrective Action Report.pdf"692031"file"".pdf""1""2026-09-11T20:05:07.644+00:00""c32a880a82a54c1a9989f32c7ad8b142""public""0""public""33757d6791864a4e89b6c7e3a9411e5b""0"44"0""Appendix C - Performance Assessment Report.pdf"1061667"file"".pdf""1""2026-09-11T20:05:07.644+00:00""669e81a51a014a5592261bf881fea819""public""0""public""953b27b5e788452fa86d7ac70e236e50""0"37"0""Appendix D - DD Form 250 Material and Receiving Report.pdf"76806"file"".pdf""1""2026-09-11T20:05:07.644+00:00""0702ebbd85d14a98adc18c883447b35c""public""0""public""f9987c57870d4506ae0d420c7100bdd0""0"31"0""Appendix E - Offutt AFB Dig Ticket Process.pdf"336079"file"".pdf""1""2026-09-11T20:05:07.644+00:00""0d88907ab8e74ef0be3f1380b0737f7f""public""0""public""b8551da1e6f1410c80b9b801d1424557""0"26"0""Appendix F - 55 CES ELECTRIC POWER OUTAGE REPORT.pdf"944721"file"".pdf""1""2026-09-11T20:05:07.644+00:00""8fcd8c9bd4d9482394d270a6c9e482dc""public""0""public""0daa0ebd2c23446dbdb36e197513ff0e""0"22"0""Appendix G - AF Form 487 Generator Inspection Form.pdf"1519074"file"".pdf""1""2026-09-11T20:05:07.644+00:00""a7769cceb45e42d5bf42a021a430324e""public""0""public""d8c93009d7aa41be8f7176d33ba62d6e""0"19"0""Appendix H - OFFUTT AFB SECTION 01 57 19 ENVIRONMENTAL SPECIAL CONDITIONS 20250605.pdf"1899939"file"".pdf""1""2026-09-11T20:05:07.644+00:00""ebf84f6de7294f2f93760d76c643d51b""public""0""public""71420c80990f40729a49dd284c182bfd""0"17"0""Appendix I - CEO Tank Compliance Docs and Long Regs 20240808 (2).pdf"411833"file"".pdf""1""2026-09-11T20:05:07.644+00:00""97ab42b47b9248c9a5ca9b59dbc6bd93""public""0""public""d95976ca157e42258e60e28638fd498a""0"16"0"Most Nebraska work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 22b56aef500e4f2b8e112dfee3e97dde), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.